OV1-7
   HOME

TheInfoList



OR:

Orbiting Vehicle 1-7 (also known as OV1-7), launched 14 July 1966, was the sixth satellite launched in the OV1 series of the United States Air Force's Orbiting Vehicle program. OV1-7 was a sky science satellite, designed to return data on charged particles in orbit as well as measurements of solar X-rays and
nightglow Airglow (also called nightglow) is a faint emission of light by a planetary atmosphere. In the case of Earth's atmosphere, this optical phenomenon causes the night sky never to be completely dark, even after the effects of starlight and diff ...
. Co-launched with OV1-8, the satellite was lost when it failed to detach from its launch rocket.


History

The Orbiting Vehicle satellite program arose from a US Air Force initiative, begun in the early 1960s, to reduce the expense of space research. Through this initiative, satellites would be standardized to improve reliability and cost-efficiency, and where possible, they would fly on test vehicles or be piggybacked with other satellites. In 1961, the Air Force Office of Aerospace Research (OAR) created the Aerospace Research Support Program (ARSP) to request satellite research proposals and choose mission experiments. The USAF Space and Missiles Organization created their own analog of the ARSP called the Space Experiments Support Program (SESP), which sponsored a greater proportion of technological experiments than the ARSP. Five distinct OV series of standardized satellites were developed under the auspices of these agencies. The OV1 series was an evolution of the 2.7 m "Scientific Passenger Pods" (SPP), which, starting on 2 October 1961, rode piggyback on suborbital Atlas missile tests and conducted scientific experiments during their short time in space. General Dynamics received a $2 million contract on 13 September 1963 to build a new version of the SPP (called the Atlas Retained Structure (ARS)) that would carry a self-orbiting satellite. Once the Atlas missile and ARS reached apogee, the satellite inside would be deployed and thrust itself into orbit. In addition to the orbital SPP, General Dynamics would create six of these satellites, each to be long with a diameter of , able to carry a payload into a circular orbit. Dubbed "Satellite for Aerospace Research" (SATAR), the series of satellites was originally to be launched from the Eastern Test Range on Atlas missions testing experimental Advanced Ballistic Re-Entry System (ABRES) nosecones. However, in 1964, the Air Force transferred ABRES launches to the Western Test Range causing a year's delay for the program. Moreover, because WTR launches would be into polar orbit as opposed to the low-inclination orbits typical of ETR launches, less mass could be lofted into orbit using the same thrust, and the mass of the SATAR satellites had to be reduced. The OV1 program was managed by Lt. Col. Clyde Northcott, Jr. The first OV1 satellite to be launched was OV1-1 on January 21, 1965. Though OV1-1's Atlas booster performed properly, the satellite's onboard Altair rocket did not fire, and the probe was lost. OV1-1 was the only satellite launched on an ABRES mission. Starting with OV1-3, launched and lost May 27, 1965, the remaining OV1 satellites all flew on Atlas D and F missiles that had been decommissioned from
ICBM An intercontinental ballistic missile (ICBM) is a ballistic missile with a range greater than , primarily designed for nuclear weapons delivery (delivering one or more thermonuclear warheads). Conventional, chemical, and biological weapons c ...
duty (except
OV1-6 Orbiting Vehicle 1-6 (also known as OV1-6 and OV1-6S) was launched via Titan IIIC rocket into orbit 2 November 1966 along with two other satellites in the United States Air Force's Orbiting Vehicle series on the first and only Manned Orbiting ...
, which flew on the Manned Orbiting Laboratory test flight on 2 November 1966).
OV1-2 Orbiting Vehicle 1-2 (also known as OV1-2), launched 5 October 1965, was the third, and first successful, satellite in the OV1 series of the United States Air Force's Orbiting Vehicle program. A radiation measuring satellite designed to conduct re ...
, the first successful satellite in the OV1 series, was launched 5 October, 1965. OV1-2 pioneered the back-to-back launch configuration under which two OV1 satellites could be carried on the same rocket, although OV1-2 flew alone. This configuration was used in the successful co-launch of OV1-4 and OV1-5 on 30 March 1966.


Spacecraft design

OV1-7 was, like the rest of the OV1 satellite series, long and in diameter, consisting of a cylindrical experiment housing capped with flattened cones on both ends containing 5000 solar cells producing 22 watts of power. Unlike the previous OV1 satellites, and setting the precedent for later ones, the solar cells were flat rather than curved. Two antennae for transmitting telemetry and receiving commands extended from the sides of the spacecraft. 12 helium-pressurized hydrogen peroxide thrusters provided attitude control. OV1-7 was the first in the series equipped with the Vertistat stabilisation system, developed for the Advanced Research Environmental Test Satellite (ARENTS) that eventually became OV2. Vertistat maintained a satellite's orientation using the small difference in gravitational potential between the central body and the ends of equipment booms. OV1-7 weighed, with its attached Altair booster, .


Experiments

OV1-7's experiment package included cosmic ray detectors, molecular oxygen detectors, charged particle measuring devices, a NASA electric field detector, a photometer for measuring
nightglow Airglow (also called nightglow) is a faint emission of light by a planetary atmosphere. In the case of Earth's atmosphere, this optical phenomenon causes the night sky never to be completely dark, even after the effects of starlight and diff ...
, and a solar X-ray monitor.


Mission

Launched from Vandenberg's 576-B-3 launch pad on 14 July 1966 at 02:10:02 UTC via Atlas D rocket, alongside the passive communications satellite and air drag test balloon, OV1-8, OV1-7 was lost when it failed to eject from its ARS. The small bulge installed to accommodate the new Vertistat system caused too much aerothermal loading, preventing the ARS door from opening quickly enough; OV1-7 collided with the partially open door.


Legacy and status

The co-flying OV1-8 mission was successful. and the Vertistat stabilization system was successfully tested on OV1-10, launched December 1966. The OV1 program ultimately comprised 22 missions, the last flying on 19 September 1971.


References

{{Orbital launches in 1966 Spacecraft launched in 1966 Military satellites Geospace monitoring satellites