Nottingham station, briefly known as Nottingham City and for rather longer as Nottingham Midland, is a
railway station Rail transport (also known as train transport) is a means of transport that transfers passengers and goods on wheeled vehicles running on rails, which are incorporated in Track (rail transport), tracks. In contrast to road transport, where the ...
and tram stop in the city of Nottingham. It is the principal railway station of Nottingham. It is also a nodal point on the city's tram system, with a tram stop that was originally called Station Street but is now known as Nottingham Station. The station was first built by the Midland Railway (MR) in 1848 and rebuilt by the same company in 1904, with much of the current building dating from the later date. It is now owned by
Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain. Network Rail is an "arm's len ...
and managed by East Midlands Railway (EMR). Besides EMR trains, it is also served by CrossCountry and
Northern Northern may refer to the following: Geography * North, a point in direction * Northern Europe, the northern part or region of Europe * Northern Highland, a region of Wisconsin, United States * Northern Province, Sri Lanka * Northern Range, a r ...
trains and by Nottingham Express Transit (NET) trams. The station was one of several that once served the city of Nottingham. Amongst these were the city centre stations of on the Great Central Railway, and on the Great Northern Railway; both of these stations are now closed. A number of minor stations served localities outside the city centre, but the only such station to remain open within the city boundaries is . On 12 January 2018, the newly renovated buildings of Nottingham station were badly damaged by fire.


History


Early beginnings

Nottingham's first station was Carrington Street station, which opened in May 1839, when the Midland Counties Railway opened the line from Nottingham to Derby. This terminus station was situated on the opposite side of Carrington Street to the current station, on a site now occupied by
Nottingham Magistrates' Court Nottingham Magistrates' Court is a magistrates' court in Nottingham, England. History Until 1996, Nottingham magistrates were housed in two separate buildings, the Guildhall and the Shire Hall. In 1996, all magistrates were moved to the new N ...
. The original station gate posts still exist and form the pedestrian entrance to the Magistrates' Courts area.


The 1848 station

In 1844, the Midland Counties Railway merged with two others into the Midland Railway. By 1848, the new company had outgrown Carrington Street station and new lines to Lincoln had been opened. A new through station was opened on the current station site on 22 May 1848, replacing the Carrington Street station. George Hall of Derby was the architect, and J.C. Hall of Nottingham the contractor and it had its entrance on Station Street. In 1869, the Midland Railway purchased the West Croft Canal arm, filling it and building additional parallel tracks to south. In the 1880s, Nottingham station employed 170 men. Although attractive when it first opened, by the early 20th century the station was cramped, with only three platforms. On 18 August 1896, a light engine, running tender first, was passing through the station when it collided with six empty fish trucks. One of the trucks was thrown off the rails against a cast-iron column supporting the inner ends of the principals of the station roof and, when the column broke, a portion of the roof, measuring about by , fell onto the platforms and track. Six people on the platform were injured.


The 1904 station

When the Great Central Railway opened its Victoria Station in 1900, the Midland Railway appointed Albert Edward Lambert, a local Nottingham architect, to rebuild the Midland station. Lambert had been the architect for Nottingham Victoria railway station and, consequently, the two buildings had many similarities in their design. The station was rebuilt largely on the same site as the Station Street station, but the entrance was relocated onto Carrington Street. The first contract for the station buildings was awarded to Edward Wood and Sons of Derby on 23 January 1903, who were also awarded the contract for the buildings on platforms 1 and 2 on 16 September 1903. The contract for the buildings on platforms 4 and 5 was awarded to Kirk, Knight & Co of Sleaford on 18 June 1903, who were also responsible for building the parcels office (Forward House) on Station Street, which opened in November 1903. The structural steelwork and cast-ironwork was done by Handyside & Co. and the Phoenix Foundry, both of Derby. The station was built in an
Edwardian The Edwardian era or Edwardian period of British history spanned the reign of King Edward VII, 1901 to 1910 and is sometimes extended to the start of the First World War. The death of Queen Victoria in January 1901 marked the end of the Victori ...
Baroque Revival style at a cost of £1 million (£ million in ) and was described by the ''Nottingham Evening News'' on the eve of its opening (16 January 1904) as a "magnificent new block of buildings". The building used a mix of red brick, terracotta (used as a substitute for building stone) and faience (a glazed terracotta), with slate and glazed pitch roofs over the principal buildings. The carriage entrances have Art Nouveau wrought-iron gates. The station's forebuildings were opened to passengers without any formal ceremony on 17 January 1904, although next day the ''Evening News'' reported that the platforms were still in a state of chaos and were not expected to be ready for another nine months. However, it did note that "the result promises to be the provision for Nottingham of one of the most commodious and most convenient passenger stations in the country". The day began with the closure of the booking offices in the old station, after the last tickets were issued for the 5:25 a.m. London train and the new booking offices were opened in time to issue tickets for the 6:25 a.m. Erewash Valley train. No attempt was made to exclude the public from the building and many took the opportunity to view the new station buildings. The ''Evening News'' commented on the public's admiration of the style and elegance of the station approaches and booking hall; it went on to describe the day's events.


20th century

The station became the property of the London, Midland and Scottish Railway, under the railway grouping of 1923. On Sunday 2 July 1939, the station was targeted by the Irish Republican Army in an attack on eight stations in the Midlands under their S-Plan; the others being Leicester, Derby, Birmingham, Stoke, Coventry, Leamington Spa and Stafford. A bomb was left in a suitcase and exploded at 6:30 a.m. The glass roof of the cloak room and enquiry office was blown away. The station was nationalised in 1948, under the Transport Act 1947, becoming part of British Railways. Following the privatisation of the railways in the 1990s, ownership was transferred to
Railtrack Railtrack was a group of companies that owned the track, signalling, tunnels, bridges, level crossings and all but a handful of the stations of the British railway system from 1994 until 2002. It was created as part of the privatisation of ...
and subsequently to
Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain. Network Rail is an "arm's len ...
. For many years, the Midland Railway suffered the indignity of its rival, the Great Central Railway, crossing above the station on a bowstring girder bridge. This bridge became redundant in 1973 and was finally dismantled in the early 1980s. The alignment was later used for a new tramway bridge.


Station Street tram stop

With the opening of the Nottingham Express Transit (NET) in March 2004, Nottingham station became the southern terminus of the new tram line. The actual tram stop was located on Station Street, directly north of Nottingham railway station and partially over the Nottingham Canal. It was constructed on a separate right-of-way, built on top of part of the old Great Central Main Line viaduct that used to lead northwards to the separate Nottingham Victoria railway station. North of the former stop, the tram route diverged from the old railway route to join an on-street section through the centre of Nottingham. To the south, the route ended at the end of the viaduct, where a since demolished bridge used to carry the Great Central line over the station. In 2012, work started to extend Nottingham Express Transit south towards Toton Lane and Clifton South. The tram stop itself was substantial, with a small station building containing a waiting area housing steps and a lift to reach the street below. There was also a short footbridge over Station Street, which connected to the main railway station. Up to three trams could be accommodated on the two platform faces; the western platform had a single-length platform, while the eastern platform was an extended double-length platform.


Redevelopment

Plans for a multi-million pound refurbishment and redevelopment of the station were unveiled by junior government minister Norman Baker on 5 October 2010. Under the scheme, the station's porte-cochère was to be made vehicle-free and the station's Grade II* listed buildings restored. The redevelopment also included the construction of another platform, more shops and a bridge to carry Nottingham Express Transit trams over the top of the station.


Funding

The redevelopment was initially estimated to cost £67 million. East Midlands Development Agency stated they would contribute £9.5 million to the project, but had to reduce this amount following government cuts. In July 2009, the then Transport Minister, Sadiq Khan, gave conditional approval for the city council to use funds raised from their controversial Workplace Parking Levy to contribute to the redevelopment. The final funding was reorganised to be around £60 million, with Network Rail contributing £41 million, Nottingham City Council £14.8 million, EMDA £2.1 million, East Midlands Trains £1.6 million and the Railway Heritage Trust £0.5 million.


Station masterplan

In 2001, the architects
Building Design Partnership Building Design Partnership Ltd, doing business as BDP, is a firm of architects and engineers employing over 900 staff in the United Kingdom and internationally. History BDP was founded in 1961 by George Grenfell-Baines with architect An arc ...
(BDP) were appointed as the lead consultants, using the same team that had redeveloped based on an estimate of £550,000 and in cooperation with Posford Rail, MVA, Jones Lang LaSalle and Bovis Lend Lease. *Stage 1 of the Nottingham Station Masterplan cost £99,960 and was launched at Loxley House on 19 July 2002. The main stakeholders at the time were Nottingham City Council,
Nottinghamshire County Council Nottinghamshire County Council is the upper-tier local authority for the non-metropolitan county of Nottinghamshire in England. It consists of 66 county councillors, elected from 56 electoral divisions every four years. The most recent electi ...
, Central Trains, Midland Mainline, Nottingham Development Enterprise, Nottingham Regeneration Limited and the EMDA, which together acted as the Nottingham Railway Station Steering Group. *State 2a of the masterplan preparation was budgeted to cost £59,940.63 and also to be undertaken by BDP. BDP engaged Tuffin Ferraby Taylor to undertake surveys of all elements of the station dating from before 1918. As well as an integrated NET tram station above platform 6, the masterplan included an additional concourse and safeguarding for an additional platform.


Car park

Between 2011 and 2012, a new multi-storey car park was constructed between platform 6 and Queen's Road, over the western half of the station's existing car park. It was built by Vinci Construction beginning in March 2011 and officially opened on 14 May 2012. The initial car park design had been put on hold in 2008, after being described as a "chicken coop". The final design for the car park has 2,107 coloured metal sheets on the outside, formed of 2.1-millimetre-thick copper and stainless steel (1.5 mm stainless, 0.6 mm "Luvata" Copper). These panels are affixed to the car park using 8,000 cleats fixed to pre-cast channels in the concrete structure. The new car park building has five storeys and space for 950 cars.


Remodelling

Schemes costing £19 million (in 2007) and then £14 million (in 2008) were proposed. Remodelling and re-signalling costing £11.6 million were approved on 15 May 2009 by the Network Rail Investment Board and took place as part of Control Period 4 (CP4), between 1 April 2009 and 31 March 2014. Nottingham station was partially closed for ten weeks during 2013 for the track and signalling work. During the blockade, the western end of the station was closed to trains for 37 days and the eastern end for 10 days. Platform 4 was split to create two platforms. All four tracks at the western end were given
bi-directional railway signalling The application of railway signals on a rail layout is determined by various factors, principally the location of points of potential conflict, as well as the speed and frequency of trains and the movements they require to make. Non-provisio ...
, allowing a better choice of non-conflicting routes. These lines are referred to as Line A, Line B, Line C and Line D. Although all lines are bi-directional, their use is segregated, with services towards Sheffield and Mansfield focused on the northern pair of tracks, and services to Derby and Leicester focused on the southern pair of tracks. Line speeds for trains arriving from Chesterfield and the Robin Hood Line were increased from to . On 7 March 2012, Network Rail requested formal "network change" acceptance from the train operating companies. On-site preparation works began in September 2011, with all new signal structures installed by June 2013 followed by the "Nottingham blockade"; this itself lasted from July 2013 until the handover in September 2013. The work was spread from Beeston, past Mansfield Junction, Nottingham West Junction and to Nottingham East Junction. The blockade covered renewing of track and adding or renewing 14 sets of pointwork.


Footbridge

Halfway along the platforms is an overhead footbridge, running from Station Street (at the north) and the tram stop link over station platforms 1–5 to platform 6 and car parking facilities at Queen's Road (at the south). The footbridge carries footpath 28, the only traffic-free crossing over the Midland Main Line in Nottingham. Footpath 28 was previously diverted from the demolished footbridge 21 to the present footbridge 20B during the 1990s. The original route formed part of the Trent Bridge Footway, between the centre of Nottingham and the river crossing at Trent Bridge. In 2004, Nottingham City Council stated that right of way over the footbridge would be closed, following the completion of a multi-storey car park. Alternative pavement improvement works were scheduled for Queens Road in February 2009. During 2008–2012, BPR Architects submitted designs for automated ticket gate (ATG) barrier installations at , , and Nottingham station concourses plus both ends of Nottingham footbridge 20B. BPR's design included four ATG barriers on the north end of the footbridge itself, plus a new enclosure and four barriers between the car park and platform 6 at the south end. A procedure to permanently stop-up the right-of-way commenced on 19 March 2010, A planning application for barriers was filed on 29 March 2010 and withdrawn again on 10 May 2010. Following a public inquiry held during 8–9 November 2011, the stopping up order was denied; the inspector summing up:
The footbridge was scheduled to be closed temporarily in November 2017; the reasons given were "making improvements" and "essential maintenance work".


New bridge and tram stop

To facilitate the Nottingham Express Transit's phase two extension into the south of the city, it was decided to have the tram line cross the station on the line of the original Great Central Railway viaduct, which had been closed to passenger trains in 1967 and goods in 1973. This required a bridge, crossing from the existing Station Street stop, which closed, over both the station and Queen's Road. Construction of the tram bridge started on 10 April 2012 and the bridge was jacked into place in May 2013. The tram bridge design is a Warren truss design made of diameter steel tubes. The main bridge is wide between the truss centrelines, with two equal spans of . The bridge is officially called the Karlsruhe Friendship Bridge, after Nottingham's twin city of Karlsruhe,
Germany Germany,, officially the Federal Republic of Germany, is a country in Central Europe. It is the second most populous country in Europe after Russia, and the most populous member state of the European Union. Germany is situated betwee ...
. The new Nottingham Station tram stop was constructed on the bridge, providing interchange with the railway network. It replaced the previous Station Street tram stop, opened in 2004, which was located approximately to the north. The new stop was opened on 27 July 2015 and the former stop closed at the same time, although the intention is to reopen the Station Street access building as a second access to the new stop once it has been refurbished. The new stop served as the new southern terminus of the system until the rest of NET's phase two opened, at which point it became a through station, with trams continuing to new termini in Chilwell and
Clifton Clifton may refer to: People * Clifton (surname) * Clifton (given name) Places Australia *Clifton, Queensland, a town ** Shire of Clifton *Clifton, New South Wales, a suburb of Wollongong * Clifton, Western Australia Canada * Clifton, Nova Sc ...
.


2018 fire

On the morning of 12 January 2018, a fire extensively damaged the station buildings. Nottinghamshire Fire and Rescue Service received a call at 6:25 am reporting that a fire had started in the women's toilet in the newly built section of the station. The fire was attended by ten fire engines and 50 firefighters. Firefighters from Derbyshire Fire and Rescue Service also attended, bringing the total to 60. After the fire began, it spread upwards into the roof of the newly built section of the station, along the station concourse and into the historic station building. There was extensive disruption to trains in the East Midlands area. British Transport Police stated, later the same day, that they were treating the fire as arson and, on 2 February 2018, police reported that a 33-year-old woman had been arrested on suspicion of arson. In August 2019, a 34-year-old drug addict received a two-year jail sentence, having admitted to accidentally setting fire to a bin while using heroin and crack. In February 2018, East Midlands Trains named one of their recently transferred Class 43 power cars (43467) 'Nottinghamshire Fire and Rescue Service and British Transport Police Nottingham' after their assistance during the fire.


Station masters

*Robert Lightfoot, 1844 *John Parkins, ????–1848 *Joseph Pettifor, 1848–1856 *Edwin Alfred Pakeman, 1856–1858 *George Hicking, 1858–1865 *John Jackson, ca. 1865 *William Wharton, 1867–1886 (afterwards station manager of St Pancras) *Richard Storer, 1886–1890 *Henry Towle, 1890–1908 *John Lewis Shannon, 1909–1911 (afterwards station master at Sheffield) *Arthur Capp Salisbury, 1911–1913 *Aaron Walker, 1913–1918 *Henry Pitt, 1919–1927 *Amos Follows, 1927–1929 (afterwards station master at Bristol Temple Meads) *Lawrence Palmer Briggs, 1929–1934 (formerly station master at Stoke) *J. Davies, 1934–1944 *Gordon H. Rogers, 1944–ca. 1962 (formerly station master at Watford Junction)


Layout and facilities


Layout

The station is aligned approximately east to west, at the southern edge of the city centre, with Station Street to the north and Queen's Road to the south. At the western end of the station, the tracks are spanned by Carrington Street and the station's main entrance is on the eastern side of this street. Since the station's redevelopment, the entrances from Carrington Street open into a concourse that spans the station from north to south. This occupies what was once the station's porte-cochère and provides a large pedestrian circulation area, along with several retail sites. The ticket hall for the railway station opens off the centre of eastern side of the concourse and, in turn, gives access via ticket barriers to a pedestrian overbridge with stairs and lifts down to the railway platforms. A second concourse opens off the main concourse at the southern end of its eastern side; this runs parallel and to the south of the platforms, giving access by stairs, lifts and
escalator An escalator is a moving staircase which carries people between floors of a building or structure. It consists of a motor-driven chain of individually linked steps on a track which cycle on a pair of tracks which keep the step tread horizo ...
s to the tram stop, the station car park,
taxi rank A taxi, also known as a taxicab or simply a cab, is a type of vehicle for hire with a driver, used by a single passenger or small group of passengers, often for a non-shared ride. A taxicab conveys passengers between locations of their choice ...
, vehicular pick-up and drop-off points, and Queen Street. The tram stop spans the station from north to south to the east of the main entrance, at a higher level than the concourse, and east of that a second footbridge links the platforms; it carries the previously referred-to footpath 28. The station's multi-storey car park lies south of the platforms, north of Queen Street, and east of the tram bridge. It provides parking for about 800 cars and the covered area below it houses the station's new taxi rank, pick-up and drop-off points, relocated from the old porte-cochère.


Railway platforms

The railway platforms lie at a lower level than the station entrance and are within a ticket barrier enforced paid area. From north to south, the station has two island platforms and a single
side platform A side platform (also known as a marginal platform or a single-face platform) is a platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or transitway. A station having dual side platfo ...
, with a total of seven numbered platform faces. Each platform is linked to the main entrance concourse by stairs and lifts and to the second footbridge by stairs only. The northern of the two island platforms has a bi-directionally signalled through platform face on each side, numbered 1 and 3, and an east-facing bay, numbered 2. The two through platforms are long enough to accommodate fifteen and fourteen coach trains, whilst the bay can accommodate a four-coach train. The middle island platform also has bi-directionally signalled through platform faces on each side, numbered 4 and 6, together with a west-facing terminal platform face, numbered 5. Platform 4 can accommodate a five-coach train, platform 5 a seven-coach train and platform 6 a fourteen-coach train. Finally the southern side platform is numbered 7 and can accommodate a thirteen-coach train. Sufficient space exists to the south of this platform to add a second platform face, effectively converting this side platform into an island platform, if traffic increases to justify it.


Tram stop

The new tram stop is positioned at a higher level than the station entrance and lies at a right angle to the railway platforms. It is designed as a through stop, with two
side platform A side platform (also known as a marginal platform or a single-face platform) is a platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or transitway. A station having dual side platfo ...
s flanking each side of the double tramway track. Like all NET stops, pedestrian access between the platforms is permitted on the level via crossings at each end of the platforms. Ticket machines are located on both platforms and the stop lies outside the ticket barrier-enforced paid area of the railway station. The tram stop is connected directly to the railway station's main concourse (and the railway platforms) via the new side concourse, with stairs, escalators and lifts bridging the height difference. A direct access is also provided to the station's multi-storey car park. The former access from Station Street is closed for refurbishment, but will reopen as an additional entrance to the new stop, accessible via a walkway running parallel to the railway tracks. North of the stop, the tramway tracks pass over Station Street and through the abandoned platforms of the former Station Street stop, before proceeding along the old Great Central Main Line viaduct and eventually joining an on-street section through the centre of Nottingham. South of the new stop, the tracks pass over Queen's Road before descending a ramp and rejoining the city's streets at ground level. The junction between the Clifton and Chilwell branches of the NET system lies just beyond this point.


Operation


National Rail services

Off-peak services (trains per hour) Monday-Friday as of the December 2021 timetable: * 1tph to London St Pancras International (fast) via , and Kettering ( East Midlands Railway) * 1tph to London St Pancras International (slow) via Beeston,
East Midlands Parkway East or Orient is one of the four cardinal directions or points of the compass. It is the opposite direction from west and is the direction from which the Sun rises on the Earth. Etymology As in other languages, the word is formed from the fa ...
, , Leicester, Market Harborough and Kettering, (East Midlands Railway) * 1tph to via , Manchester Piccadilly and (East Midlands Railway) * 1tph to via , and (East Midlands Railway) * 1tph to via Mansfield Woodhouse (East Midlands Railway) * 1tph to via Grantham and (East Midlands Railway) * 1tph to Leicester (slow) via Beeston and (East Midlands Railway) * 1tph to (slow) via
Lowdham Lowdham is a village and civil parish in the Newark and Sherwood district of Nottinghamshire between Nottingham and Southwell. At the 2001 census it had a population of 2,832, increasing to 3,334 at the 2011 Census. Two main roads slicing thro ...
(East Midlands Railway) * 1tph to Lincoln via Newark Castle of which 1tp2h is extended to Grimsby Town, of which a limited number are extended to Cleethorpes (East Midlands Railway) * 1tph to Crewe via Derby and Stoke-on-Trent (East Midlands Railway) * 1tph to via Derby ( CrossCountry) * 1tph to via Birmingham New Street, Gloucester and (CrossCountry) * 1tph to via Sheffield, Barnsley and Wakefield Kirkgate ( Northern Trains)GB eNRT December 2021 Edition, Table 53


Nottingham Express Transit services

Nottingham station is on the common section of the NET, where line 1, between Hucknall and Toton Lane, and line 2, between
Phoenix Park The Phoenix Park ( ga, Páirc an Fhionnuisce) is a large urban park in Dublin, Ireland, lying west of the city centre, north of the River Liffey. Its perimeter wall encloses of recreational space. It includes large areas of grassland and t ...
and Clifton South, operate together. The two branches to Toton Lane and Clifton South split to the south of the station, while sharing track to the north into the city centre. Trams on each line run at a frequency of between four and eight trams per hour, depending on the day and time of day, combining to provide up to 16 trams per hour on the common section.


See also

* Nottingham Victoria railway station (1890 to 1967) *
Nottingham Carrington Street railway station Nottingham Carrington Street railway station was the first railway station in Nottingham, opened in 1839 by the Midland Counties Railway. Initially there were two lines with a central platform as well as side ones according to Billson. Victor ...
(1839 to 1848) *
Carrington railway station Carrington railway station was a railway station in Nottingham on the Great Central Railway main line, the last main line to be built from the north of England to London. The station opened with the line on 15 March 1899, and served the Notti ...
(1899 to 1928)


References


External links


Nottingham Train Station Information

Nottingham Train Station – The Open Guide to Nottingham
{{Railway stations served by CrossCountry Buildings and structures in Nottingham Railway stations in Nottinghamshire DfT Category B stations Former Midland Railway stations Railway stations in Great Britain opened in 1839 Railway stations in Great Britain closed in 1848 Railway stations in Great Britain opened in 1848 Railway stations served by East Midlands Railway Railway stations served by CrossCountry Northern franchise railway stations Grade II* listed buildings in Nottinghamshire Grade II* listed railway stations Nottingham Express Transit stops Transport in Nottingham Albert Edward Lambert railway stations