North Carolina Turnpike Authority
   HOME

TheInfoList



OR:

The North Carolina Turnpike Authority was created in 2002 to speed the implementation of needed transportation improvements by funding some projects with tolls. Governed by a nine-member authority board, it is located within the Department of Transportation and under the direct supervision of the Secretary of Transportation. The authority has the power to study, plan, develop and undertake preliminary design work on up to eleven turnpike projects. At the conclusion of these actives, the authority is authorized to design, establish, purchase, construct, operate and maintain toll highways and
bridges A bridge is a structure built to span a physical obstacle (such as a body of water, valley, road, or rail) without blocking the way underneath. It is constructed for the purpose of providing passage over the obstacle, which is usually someth ...
. The authority is also authorized to designate one or more lanes of any highway, or portion thereof, into a
high-occupancy toll lane A high-occupancy toll lane (or HOT lane) is a type of traffic lane or roadway that is available to high-occupancy vehicles and other exempt vehicles without charge; other vehicles are required to pay a variable fee that is adjusted in response ...
s (HOT lanes) or other type of managed lanes; provided that such designation does not reduce the number of existing non-toll general purpose lanes.


Structure

The nine-member Authority Board consist of eight appointees, from the General Assembly (four members) and Governor (four members), and the Secretary of Transportation. The General Assembly appoints four members, two by recommendation by the
President pro tempore of the Senate A president pro tempore or speaker pro tempore is a constitutionally recognized officer of a legislative body who presides over the chamber in the absence of the normal presiding officer. The phrase ''pro tempore'' is Latin "for the time being". ...
and two by recommendation by the Speaker of the House of Representatives. Appointments to the board are four-year staggered terms. The Chair of the Authority is selected by the Authority Board. Members of the North Carolina Board of Transportation may serve as members of the Authority Board. Upon end of term, all members of the Authority Board will remain in office until their successors are appointed and qualified. The original appointing authority may appoint a member to serve out the unexpired term of any member. Each member of the Authority Board serves at the pleasure of the appointing authority. The Chair of the Authority serves at the pleasure of the Authority Board. The appointed members of the Authority Board receives no salary for their services; however, are entitled to receive per diem and travel allowances. An executive director, appointed by the Authority Board, serves as the Authority's chief administrative officer and is responsible for the daily administration of the toll roads and bridges constructed, maintained or operated. The Executive Director or his/her designee shall appoint, employ, dismiss and, within the limits approved by the Authority Board, fix the compensation of administrative employees as the executive director deems necessary.


History

The North Carolina Turnpike Authority was established on October 3, 2002, by ratification of House Bill 644 (S.L. 2002-133) and signed by Governor Mike Easley. In its original draft, the authority was independent and only able to establish the first three projects in the following conditions: one project located in whole or in part in a county with a population equal to or greater than 650,000 persons; one project located in a county or counties that each have a population of fewer that 650,000 persons; and one project shall be a bridge of more than in length going from the mainland to a peninsula bordering the state of Virginia. In 2005, Senate Bill 622 (S.L. 2005-276) added new language regarding establishing tollways on Federally funded highways designated as interstates; the purpose was so that the state can possibly add tolls along Interstate 95 (I-95), if approved by the
Federal Highway Administration The Federal Highway Administration (FHWA) is a division of the United States Department of Transportation that specializes in highway transportation. The agency's major activities are grouped into two programs, the Federal-aid Highway Program a ...
(FHWA) and all interested parties along the route. In 2006, Senate Bill 1381 (S.L. 2006-228) focused the project to the following: * Triangle Parkway * Gaston East-West Connector * Monroe Connector *
Cape Fear Skyway The Cape Fear Skyway (also called the Cape Fear Crossing) was a proposed limited access toll road and bridge in North Carolina, United States, that would pass through portions of New Hanover and Brunswick counties. Description The proposed rou ...
* A bridge of more than in length going from the mainland to a peninsula bordering the state of Virginia (
Mid-Currituck Bridge The Mid-Currituck Bridge is a proposed long two-lane toll bridge that will span across Currituck Sound, connecting US 158 and NC 12. Its purpose is to alleviate summer traffic congestion and to improve both emergency response and evacu ...
) * I-540 in Wake and Durham Counties The 2006 law also made an exception, to the prohibition of converting any segment of the nontolled state highway system to a toll, by specifically identifying I-540 that was currently under construction as of July 1, 2006, located in Wake and Durham counties, and extending from
I-40 Interstate 40 (I-40) is a major east–west Interstate Highway running through the south-central portion of the United States. At a length of , it is the third-longest Interstate Highway in the country, after I-90 and I-80. From west to ea ...
southwest to North Carolina Highway 55 (NC 55). In addition, the law also mandates the North Carolina Department of Transportation (NCDOT) to maintain an existing, alternate, comparable non-toll route for each toll route constructed by the authority. In December 2006, FHWA approved the tolling project on what was going to be I-540 along the Western Wake Freeway. In 2008, Senate Bill 1697 (S.L. 2008-225) established the enforcement of tolls on turnpike projects and clarified and revised several sections, including: removal of I-540 from project list, collection of tolls (via mail or transponder), payment system for tolls, civil penalties for not paying tolls and procedures for contesting liability for unpaid tolls. The Triangle Parkway was also renamed the Triangle Expressway, which incorporated segments also known as NC 147 (Triangle Parkway) and NC 540 (Western Wake Freeway), in Wake and Durham counties. In 2009, House Bill 1617 (S.L. 2009-343) transferred the functions and funds of the North Carolina Turnpike Authority to NCDOT to conserve expenditures and improve efficiency. In August, the groundbreaking ceremony took place on the first phase of the Triangle Expressway. On May 4, 2010, the Authority signed a contract with
TransCore Roper Technologies, Inc. (formerly Roper Industries, Inc.) is an American diversified industrial company that produces engineered products for global niche markets. The company is headquartered in Sarasota, Florida. Roper provides a wide range ...
to provide transponders. In December 2011, phase one of the Triangle Expressway was open to traffic; on January 3, 2012, toll collection began. On June 26, 2012, Senate Bill 895 (S.L. 2012-85) gave the authority the ability to enter into reciprocal toll enforcement agreements with other toll agencies. In August, 2012, phase two of the Triangle Expressway was open to traffic and immediately began toll collection. In December 2012, phase three of the Triangle Expressway was opened to traffic; on January 3, 2013, toll collection began on the final section. In 2013, House Bill 817 (S.R. 2013-183) made sweeping changes to the authority, including: removal of several turnpike projects, including the Triangle Expressway Southeast Extension, Garden Parkway, Cape Fear Skyway and the Mid-Currituck Bridge. reestablishing the turnpike project limit to nine, with the existing Triangle Expressway counting as three and the Monroe Connector/Bypass as one. New turnpike projects must follow new conditions prior to the letting of a contract for project. A limit of up to three agreements with a private entity, with an agreement of no more than 50 years from the date of the beginning of operations on the toll facility. The designation of HOT and managed lanes.


Toll roads

, the Authority operates of tollways in four counties in North Carolina: *
Triangle Expressway The Triangle Expressway (TriEx) is the first modern toll road built in North Carolina, and one of the first toll roads in the United States built to use only electronic toll collection instead of toll booths. The overall freeway consists of two ...
(NC 885/NC 540) — A
controlled-access highway A controlled-access highway is a type of highway that has been designed for high-speed vehicular traffic, with all traffic flow—ingress and egress—regulated. Common English terms are freeway, motorway and expressway. Other similar terms i ...
along the Triangle Parkway and Western Wake Freeway, in
Durham Durham most commonly refers to: *Durham, England, a cathedral city and the county town of County Durham *County Durham, an English county * Durham County, North Carolina, a county in North Carolina, United States *Durham, North Carolina, a city in N ...
and Wake counties. *
Monroe Expressway The Monroe Expressway, designated U.S. Route 74 Bypass (US 74 Byp.), is a controlled-access toll road in Union County in the U.S. state of North Carolina, the first in the Charlotte area. It serves as a bypass of the communities of Indian ...
(US 74 Bypass) — A
controlled-access highway A controlled-access highway is a type of highway that has been designed for high-speed vehicular traffic, with all traffic flow—ingress and egress—regulated. Common English terms are freeway, motorway and expressway. Other similar terms i ...
extending from US 74, near I-485 in Stallings, to US 74, east of
Wingate Wingate may refer to: Places New Zealand * Wingate, New Zealand, a suburb of Lower Hutt United Kingdom * Wingate, County Durham * Wingate Quarry, a Site of Special Scientific Interest in County Durham * Old Wingate, County Durham * Wingat ...
, in Union County.


Managed lanes

The authority currently has one set of HOT lanes in North Carolina: * I-77 Express Lanes is a public-private partnership with
Cintra Cintra, S.A. (Concesiones de Infraestructuras de Transporte, translated as Toll Transport Infrastructures) is one of the largest private developers of transport infrastructure in the world. Its assets are fundamentally toll roads and car parks, ...
to build managed lanes along of I-77, between Brookshire Boulevard (exit 11) and NC 150 (exit 36), in
Mecklenburg Mecklenburg (; nds, label= Low German, Mękel(n)borg ) is a historical region in northern Germany comprising the western and larger part of the federal-state Mecklenburg-Western Pomerania. The largest cities of the region are Rostock, Schweri ...
and Iredell counties. The $655 million project, which converted the existing HOV lanes parallel to I-77 was opened in two sections. The northern section of the I-77 Express Lanes from Hambright Road near I-485 to N.C. 150 opened in spring 2019. The southern section from I-277 to Hambright Road opened November 2019. Unlike the turnpike projects, the Authority is not limited to the number of managed lane projects it may construct and operate. The authority may also convert lanes that may previously have been designated as
high-occupancy vehicle lane A high-occupancy vehicle lane (also known as an HOV lane, carpool lane, diamond lane, 2+ lane, and transit lane or T2 or T3 lanes) is a restricted traffic lane reserved for the exclusive use of vehicles with a driver and one or more passengers, i ...
(HOV) or other type of managed lanes; provided that such designated does not reduce the number of existing non-toll general purpose lanes. In making such designations, the authority will specify the high-occupancy requirement or other conditions for use of such lanes, which may include restricting vehicle types, access controls, or the payment of tolls for vehicles that do not meet the high-occupancy requirements or conditions for use. , two additional managed lane projects are fully funded for construction: * I-485 Express Lanes—this project will establish managed lanes along of the Governor James G. Martin (southeast) segment of I-485, between U.S. Highway 74 (US 74, exit 51) and
I-77 Interstate 77 (I-77) is a north–south Interstate Highway in the eastern United States. It traverses diverse terrain, from the mountainous state of West Virginia to the rolling farmlands of North Carolina and Ohio. It largely supplants the ...
/ US 21 (exit 67), in Mecklenburg County. The project, which will add one express lane on both directions, will cost $184.1 million and is not anticipated to start construction until 2019. * Independence Express Lanes (US 74)— this project will establish managed lanes along of US 74, between I-277 and Wallace Lane, in Mecklenburg County. The project, which will convert existing bus lanes will cost $13 million and expected to be completed and opened by the end of 2016.


Turnpike projects

, one turnpike project is fully funded for construction: * Triangle Expressway Southeast Extension (NC 540)—A controlled-access highway between
I-40 Interstate 40 (I-40) is a major east–west Interstate Highway running through the south-central portion of the United States. At a length of , it is the third-longest Interstate Highway in the country, after I-90 and I-80. From west to ea ...
/ US 70 and NC 55 Bypass, in Johnston and Wake counties. Any other project proposed by the authority requires prior consultation with the Joint Legislative Commission on Governmental Operations. For a project to be considered a turnpike project, it must meet the following conditions prior to the letting of a contract for the project: 1) Two of the projects must be ranked in the top 35 based on total score on the department-produced list entitled "Mobility Fund Project Scores" dated June 6, 2012, and, in addition, may be subject to G.S. 136-18(39a).G.S. 136-18 Powers of Department of Transportation
/ref> 2) Of the projects not ranked as provided in (1), one may be subject to G.S. 136-18(39a). 3) The project shall be included in any applicable locally adopted comprehensive transportation plans. 4) The project shall be shown in the current State Transportation Improvement Program (STIP). 5) Toll projects must be approved by all affected Metropolitan Planning Organizations and Rural Transportation Planning Organizations for tolling.


Proposed projects

Stipulated in the 2013 law, proposed toll road and bridges must go through same process as other transportation projects, have an STIP score and rated with other criteria contained in the Strategic Mobility Formula. NCDOT will circulate a draft of the STIP for public comment in December 2014. NCDOT anticipates the Board of Transportation will adopt it in June 2015. Listed below are proposed projects, currently in review and subject to change: *
Cape Fear Skyway The Cape Fear Skyway (also called the Cape Fear Crossing) was a proposed limited access toll road and bridge in North Carolina, United States, that would pass through portions of New Hanover and Brunswick counties. Description The proposed rou ...
—$642 million project that will construct new four-lane highway and bridge, between US 17 and US 421, in Brunswick and New Hanover counties. This project while not discontinued has been halted for an infinite amount of time. * I-40 Express Lanes—$1.7 billion project that will add managed lanes along of I-40, between US 15/US 501 (exit 270) and I-440 (exit 301), in Durham and Wake counties. * I-77 Express Lanes Extension—$855 million project that will add managed lanes along of I-77/US 21, between I-485/Westinghouse Boulevard (exit 1) and Brookshire Boulevard (exit 11), in Mecklenburg County. * I-540 Express Lanes—$209 million or $354 million project that will add managed lanes along or of I-540, between NC 54 and US 1 or I-87/US 64/US 264, in Durham and Wake counties. * I-540 Toll—a project, requested by the Capital Area MPO in 2011, that will convert all of I-540 into a toll highway, in Durham and Wake counties and requires federal approvals. *
Mid-Currituck Bridge The Mid-Currituck Bridge is a proposed long two-lane toll bridge that will span across Currituck Sound, connecting US 158 and NC 12. Its purpose is to alleviate summer traffic congestion and to improve both emergency response and evacu ...
—$173 million project that will construct new two-lane highway and bridge over the Currituck Sound, in Currituck County. * Triangle Expressway Eastern Extension (NC 540)—$285 million project that will construct new six-lane highway, between I-87/US 64/US 264 and I-40/US 70, in Johnston and Wake counties.


Discontinued projects

*
Garden Parkway The Garden Parkway was a proposed limited access toll road that was to be built in the US state of North Carolina. The route would have passed through portions of Gaston and Mecklenburg counties. Route description The planned routing of the Gar ...
—$318 million project that was to construct a new four-lane highway, between I-85 and I-485, in Gaston and Mecklenburg counties. In May 2013, the North Carolina General Assembly rescinded approval of the project. In May 2016, NCDOT made the unusual effort by sending postcards to more than 50,000 residents along the route that the Garden Parkway was officially dead. * I-74 Toll—$305 million project that was to construct new six-lane highway, between US 52 and I-74, in Forsyth County.


NC Quick Pass

The NC Quick Pass is a pre-paid account used for all electronic toll collection (ETC) facilities in North Carolina. Three types of transponders are available: transponder sticker (free version), E-ZPass (hard case) transponder and E-ZPass bumper-mounted transponder. Personal (limited to five transponders/vehicles) and business accounts (unlimited) are available; a $1 fee is imposed per month if the account has been inactive for 12 months. While NC Quick Pass users receive a discounted toll rate, non-users will be invoiced at a higher toll rate through the bill by mail program. This is done when a vehicle passes through a toll gantry, where an overhead camera will take a video image of the license plate. The registered owner of the vehicle is identified through the Department of Motor Vehicles and a bill by mail is sent for payment. If the bill is not paid within 30 days from the date of the bill, it may escalate to include fees, civil penalties, DMV registration holds, submission to a collection agency, or all of the above.


Interoperability

NC Quick Pass is interoperable with the following ETC systems: * E-ZPass—since January 3, 2013. Due to differences in equipment, NC Quick Pass drivers must use the E-ZPass hard case or bumper-mounted transponders, while drivers with an E-ZPass from other states such as Virginia, etc, may simply use their E-ZPass in North Carolina. * Florida's SunPass—since July 29, 2013. * Georgia's
Peach Pass Peach Pass is an electronic toll collection system in use in the U.S. state of Georgia, which is currently used primarily for high-occupancy toll lanes and express toll lanes on Interstate 75 (I-75), I-85, and I-575 in metropolitan Atlanta. Pe ...
—since November 12, 2014. The toll collection equipment used in North Carolina, Florida, and Georgia are compatible, so that NC Quick Pass drivers may simply use any NC Quick Pass transponder in Florida and Georgia, and vice versa (SunPass and Peach Pass drivers may simply use their transponder in North Carolina).


Criticism

The North Carolina Turnpike Authority and North Carolina Department of Transportation received criticism following the introduction of a law allowing toll highways and bridges in the state in 2002. Introduced to speed along the implementation of transportation improvements, many of the projects selected by the Authority were controversial, leading to delays. Originally planned to be an extension of the 1-540, the Triangle Expressway garnered criticism from both politicians and residents for tolling the Western Wake Freeway and for the organisers being unable to sell bonds to fund the project. Following its opening, criticism shifted onto its expansion with towns raising issues about its routing and
environmental concerns Environmental issues are effects of human activity on the biophysical environment, most often of which are harmful effects that cause environmental degradation. Environmental protection is the practice of protecting the natural environment on t ...
. Other projects, such as the Garden Parkway and Monroe Connector/Bypass prompted fear of additional
urban sprawl Urban sprawl (also known as suburban sprawl or urban encroachment) is defined as "the spreading of urban developments (such as houses and shopping centers) on undeveloped land near a city." Urban sprawl has been described as the unrestricted growt ...
, the criticism of politicians who had land deals along the routes, and generated lawsuits stemming from the flawed environmental studies. Both the Cape Fear Skyway and Mid-Currituck Bridge were criticized as expensive pork projects. In response to the criticism the North Carolina General Assembly removed the Garden Parkway, Cape Fear Skyway and Mid-Currituck Bridge from the authority's purview. A more recent contract between the authority and Cintra to build I-77 HOT lanes and operate them for 50 years provoked local groups to hire legal counsel and attempt to have it nullified. Additional criticisms have stemmed from the irregular distribution of toll roads recommended by the authority throughout the state.


See also

* North Carolina Ferry System *
North Carolina Highway System The North Carolina Highway System consists of a vast network of Interstate, United States, and state highways, managed by the North Carolina Department of Transportation. North Carolina has the second largest state maintained highway network in t ...


Notes


References


External links


NC Quick Pass
{{Authority control Toll roads in North Carolina Toll road authorities of the United States Government of North Carolina 2002 establishments in North Carolina