New Melones Dam is an earth and rock filled
embankment dam An embankment dam is a large artificial dam. It is typically created by the placement and compaction of a complex semi-plastic mound of various compositions of soil or rock. It has a semi-pervious waterproof natural covering for its surface an ...
on the
Stanislaus River The Stanislaus River is a tributary of the San Joaquin River in north-central California in the United States. The main stem of the river is long, and measured to its furthest headwaters it is about long. Originating as three forks in the hig ...
, about west of
Jamestown, California Jamestown is a census-designated place (CDP) in Tuolumne County, California, United States. The population was 3,433 at the 2010 census, up from 3,017 at the 2000 census. Formerly a California Gold Rush town, Jamestown is now a California His ...
, United States, on the border of
Calaveras County Calaveras County (), officially the County of Calaveras, is a county in both the Gold Country and High Sierra regions of the U.S. state of California. As of the 2010 census, the population was 45,292. The county seat is San Andreas. Angels C ...
and
Tuolumne County Tuolumne County (), officially the County of Tuolumne, is a county located in the U.S. state of California. As of the 2020 census, the population was 55,620. The county seat and only incorporated city is Sonora. Tuolumne County comprises th ...
. The water impounded by the dam forms
New Melones Lake New Melones Lake is a reservoir on the Stanislaus River in the central Sierra Nevada foothills, within Calaveras County and Tuolumne County, California. The New Melones Dam and reservoir are a water collection and transfer unit of the Central V ...
, California's fourth-largest reservoir, in the foothills of the
Sierra Nevada The Sierra Nevada () is a mountain range in the Western United States, between the Central Valley of California and the Great Basin. The vast majority of the range lies in the state of California, although the Carson Range spur lies primar ...
east of the
San Joaquin Valley The San Joaquin Valley ( ; es, Valle de San Joaquín) is the area of the Central Valley of the U.S. state of California that lies south of the Sacramento–San Joaquin River Delta and is drained by the San Joaquin River. It comprises seven ...
. The dam serves mainly for irrigation water supply, and also provides hydropower generation,
flood control Flood control methods are used to reduce or prevent the detrimental effects of flood waters."Flood Control", MSN Encarta, 2008 (see below: Further reading). Flood relief methods are used to reduce the effects of flood waters or high water level ...
, and recreation benefits. The dam was authorized in 1944 as a unit of the federal
Central Valley Project The Central Valley Project (CVP) is a federal power and water management project in the U.S. state of California under the supervision of the United States Bureau of Reclamation (USBR). It was devised in 1933 in order to provide irrigation an ...
, a system designed to provide irrigation water to the fertile agricultural region of the Central Valley. It would be built by the
U.S. Army Corps of Engineers , colors = , anniversaries = 16 June (Organization Day) , battles = , battles_label = Wars , website = , commander1 = ...
(Corps), and transferred to the U.S. Bureau of Reclamation (Reclamation) upon completion. In 1966, work began to clear the foundations for a high dam that would replace an earlier, much smaller structure built by two irrigation districts. Construction of the main embankment began in 1976, and was topped out in late 1978. The filling of New Melones Lake began in 1978, and the dam's hydroelectric station produced its first power in mid-1979. New Melones was the focus of a long environmental battle during the 1970s and early 1980s; critics protested the flooding of a long scenic stretch of the Stanislaus River, which flowed over whitewater rapids through the deepest limestone canyon in the western United States. The protestors employed a variety of methods, some extreme, to prevent the filling of New Melones Lake until 1983, when record-setting floods filled the reservoir and nearly breached the dam's emergency
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure th ...
. The fight over New Melones galvanized the river conservation movement in California and influenced major water policy changes on the state and federal levels; since its completion, no other dams of its size or importance have been built in the United States. The New Melones project has continued to generate controversy, due to the water yield from the project being lower than expected, and the use of New Melones water to meet federal environmental standards at the expense of farming. The reservoir is considered "over-allocated"; in an average year, it is unable to meet all the demands placed on it. The debate over water rights continues today, with environmentalists seeking to further increase fishery flows, and the Stanislaus irrigation districts asserting their senior rights to the river.


Specifications

New Melones Dam and its reservoir comprise the independent New Melones Unit of the Central Valley Project. The dam's primary purpose is to control the runoff from , or about 92 percent, of the watershed of the Stanislaus River, a major tributary of the
San Joaquin River The San Joaquin River (; es, Río San Joaquín) is the longest river of Central California. The long river starts in the high Sierra Nevada, and flows through the rich agricultural region of the northern San Joaquin Valley before reaching Suis ...
. At high from the foundations and long, and containing of material, New Melones is the second tallest earthfill dam in the United States, after
Oroville Dam Oroville Dam is an earthfill embankment dam on the Feather River east of the city of Oroville, California, in the Sierra Nevada foothills east of the Sacramento Valley. At 770 feet (235 m) high, it is the tallest dam in the U.S. and ser ...
, and the sixth tallest dam overall. With a crest elevation of , the dam rises for above the streambed. Flood waters are released through an unlined spillway about a mile (1.6 km) northwest of the dam, with a capacity of . The dam also has an outlet works which can release up to . The impounded water behind the dam forms New Melones Lake, which at full pool of above sea level encompasses of surface water and a volume of . About , 19 percent of the reservoir's capacity, is reserved for flood control. During flooding events, the dam is operated to keep flows on the Stanislaus River below , although this figure may be lowered depending on flow conditions in the San Joaquin River. Between 1978 and 2010 the dam prevented a total of $505 million in flooding damages (adjusted for inflation), including $231 million during the New Year's flood of 1997 alone. However, the ''
Manteca Bulletin The ''Manteca Bulletin'' is the newspaper of record and daily newspaper for Manteca, California, United States. The ''Bulletin'' has been published since 1908. It is currently owned by the locally-owned 209 Multimedia. The editor is Dennis Wyatt. ...
'' noted that the dam was operated carelessly during the 1997 flood – almost of farmland was flooded near the confluence of the Stanislaus and San Joaquin Rivers – and a further $80 million of damage could have been prevented had the reservoir been kept at a safe level. The dam's hydroelectric power plant is located at its base on the north side of the river, and has a rated
hydraulic head Hydraulic head or piezometric head is a specific measurement of liquid pressure above a vertical datum., 410 pages. See pp. 43–44., 650 pages. See p. 22. It is usually measured as a liquid surface elevation, expressed in units of length, ...
of . The plant houses two 150.0 MW
Francis turbine The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency. The proc ...
s for a total capacity of 300 MW. Daily releases are made on a
peaking Peaking may refer to: * Peaking, in improperly installed laminate flooring * Antenna peaking, orienting a directional antenna toward the greatest radio signal amplitude * Focus peaking, a feature in digital viewfinders that detects and highlights ...
basis; seasonal totals are dictated by irrigation (in summer) and flood control (in winter) requirements below the dam. The release from New Melones is re-regulated by the smaller downstream reservoir of
Tulloch Dam Tulloch Dam is a hydroelectric dam on the Stanislaus River in central California. The dam is part of the Stanislaus River Tri-Dam project cooperatively owned by the Oakdale and South San Joaquin Irrigation Districts, and was completed in 1958. ...
, ensuring a stable flow in the Stanislaus River. For the period 2001 to 2015, the plant produced an average of 418 million
kilowatt hour A kilowatt-hour ( unit symbol: kW⋅h or kW h; commonly written as kWh) is a unit of energy: one kilowatt of power for one hour. In terms of SI derived units with special names, it equals 3.6 megajoules (MJ). Kilowatt-hours are a common b ...
s (KWh) annually. This ranged from a high of 910 million KWh in fiscal year 2006, to a low of 130 million KWh in 2015. The plant replaced the old 22 MW power station at the original Melones Dam; on average it generates about four times as much electricity as the original did. By controlling the flows of the Stanislaus River, the dam and reservoir make available of additional water each year. About of land along the Stanislaus River are irrigated using water from New Melones. According to the Bureau of Reclamation, the increase in water supply from New Melones Dam has "translated into prosperity for the region, allowing the growth of cities including Tracy and Manteca, and irrigating high-value crops including almonds, walnuts and grapes." In addition, New Melones Lake is one of the major tourist draws of the region, providing activities such as boating, fishing and shoreline camping. An estimated 800,000 people visit the lake each year; however, droughts can cause the closure of lake facilities due to low water levels.


History


Background

The modern development of the Stanislaus River began with the Oakdale and South San Joaquin Irrigation Districts, which were created in 1909 under the Wright Act to serve farmers in the area. Early irrigation along the Stanislaus River was dependent on the natural flow of the river, which was never enough to water crops during the late summer and fall. In 1926 the two irrigation districts jointly completed the original Melones Dam, a high concrete arch dam with a storage capacity of . This reservoir was still not big enough for all the demands placed on it, especially during the long droughts of the 1930s. The storage capacity of these early reservoirs was limited and the irrigation districts sought to increase the size of the Melones Reservoir. The federal Flood Control Act of 1944 authorized the
U.S. Army Corps of Engineers , colors = , anniversaries = 16 June (Organization Day) , battles = , battles_label = Wars , website = , commander1 = ...
to build a arch dam with a capacity of . As a primary flood control structure, it would protect of farmland as well as the towns of Oakdale, Riverbank and
Ripon Ripon () is a cathedral city in the Borough of Harrogate, North Yorkshire, England. The city is located at the confluence of two tributaries of the River Ure, the Laver and Skell. Historically part of the West Riding of Yorkshire, the ...
from flooding. It would generate electricity using the original 22 megawatt Melones hydroelectric plant. However, the cost-benefit analysis conducted for the project, then known as "New Melones I", did not justify the construction of the dam for flood control alone. If other benefits such as irrigation, fishery conservation and recreation were included, the cost-benefit ratio became positive. The Corps downplayed these additional benefits, intending to keep it primarily as a flood-control structure, because an irrigation project would then fall under the authority of the U.S. Bureau of Reclamation. During the 1950s the irrigation districts built two more dams, Donnells and Beardsley, along the upper Stanislaus River, forming (along with
Tulloch Dam Tulloch Dam is a hydroelectric dam on the Stanislaus River in central California. The dam is part of the Stanislaus River Tri-Dam project cooperatively owned by the Oakdale and South San Joaquin Irrigation Districts, and was completed in 1958. ...
below Melones Dam) the Tri-Dam Project. The Corps objected to the Tri-Dam Project because the additional storage provided by these smaller dams further decreased the potential flood control benefit of New Melones. With the Corps unable to provide a sound economic justification, New Melones I was ultimately shelved in 1954. Meanwhile, the Oakdale and South San Joaquin irrigation districts had conducted their own study in the late 1940s and proposed a bigger dam, tall with a capacity of 1.1 million acre feet (1.4 km3), or approximately one year's worth of Stanislaus River runoff. The Bureau of Reclamation first surveyed the Melones dam site in the 1950s, and initially supported the proposed 1.1 million acre foot reservoir but soon increased the size of the project (to be known as "New Melones II") twofold, as part of the Central Valley Project. The Bureau cited numerous benefits to a larger reservoir, which it estimated would capture of extra water per year to increase irrigation, supply other units of the Central Valley Project, and maintain a minimum flow in the Stanislaus River to protect fish (before New Melones was built, diversions often dried the river completely in summer). This water would be provided above and beyond fulfilling previously existing water rights to the irrigation districts. Although the 1944 version of the project had been abandoned, the Bureau and the Corps continued to argue over who would construct the dam. The Flood Control Act of 1962 authorized the final design of the dam – changing it from an arch to an embankment dam, increasing the size of the projected reservoir to and requiring the construction of a new power plant. It also settled the interagency dispute by authorizing the Corps to construct the dam and direct flood control operations, and the Bureau to operate the dam for its other intended purposes such as irrigation and hydroelectricity. In the early 1960s, there was some local opposition to the project on the grounds that it was too big – with a reservoir more than twice as large as the annual flow of the Stanislaus River, it might never fill and would be a waste of federal Central Valley Project funds. There was also concern that water from New Melones II might be exported outside the Stanislaus River basin and sold elsewhere; therefore, a rider attached to the 1962 act "reserved water for use within the basin with export of excess water only". Two years later, the Christmas flood of 1964 caused considerable damage along the Stanislaus River that a large dam could have prevented; Congressman
John J. McFall John Joseph McFall (February 20, 1918 – March 7, 2006) was a Democratic member of the United States House of Representatives, representing the state of California, rising to the position of House Majority Whip. Early life and career McFall was ...
"seized the political leverage that only he floodscould provide, and urged the drenched farmers to support New Melones Dam." With opposition having largely turned to support, Congress approved funding in 1965, with construction starting the following year.


Initial construction and controversy

Actual construction began in July 1966 with clearing of the dam and reservoir site, construction of access roads, foundation preparations and excavations for the future outlet works. A diversion tunnel to allow the river to bypass the dam site was excavated between 1966 and December 1973. The Corps opened bids for construction of the main dam on October 10, 1972. Melones Contractors (a consortium formed by Guy F. Atckinson Company, Gordon H. Ball, and Arundel Corp.) won the primary construction contract for $109.7 million, while
Allis-Chalmers Allis-Chalmers was a U.S. manufacturer of machinery for various industries. Its business lines included agricultural equipment, construction equipment, power generation and power transmission equipment, and machinery for use in industrial s ...
and
General Electric General Electric Company (GE) is an American multinational conglomerate founded in 1892, and incorporated in New York state and headquartered in Boston. The company operated in sectors including healthcare, aviation, power, renewable ene ...
took an $11.5 million contract to provide turbines and hydroelectric generating equipment. During reservoir clearing operations, the USACE spent about $28 million relocating roads and bridges in the future reservoir space. Foundation work for the dam itself began on March 6, 1974 with the first embankment material placed in January 1976. Much of the embankment fill came from an excavation shortly northwest of the dam, which would later serve as the dam's spillway. During the height of construction in the summer, the total workforce reached about 800, while averaging between 500–600 in the winter months. Although the 1964 floods had initially generated support for New Melones, a spirited opposition to the dam arose from both the river recreation industry and environmentalists who saw the Stanislaus River canyon as having greater value than a reservoir. River runners protested the threat to the Stanislaus River, which was becoming one of the most popular
whitewater Whitewater forms in a rapid context, in particular, when a river's gradient changes enough to generate so much turbulence that air is trapped within the water. This forms an unstable current that froths, making the water appear opaque and ...
runs in the United States, with the first commercial rafting company established in 1962
see images of the river, rafting, and the canyon at the Stanislaus River Archive
. The river flowed through the deepest limestone canyon in the US, with cliffs rising above the water in places. Other natural features of the area included extensive limestone caves, and endemic species such as '' Banksula melones'', the Melones cave
harvestman The Opiliones (formerly Phalangida) are an Order (biology), order of arachnids Common name, colloquially known as harvestmen, harvesters, harvest spiders, or daddy longlegs. , over 6,650 species of harvestmen have been discovered worldwide, alth ...
. In addition, more than one hundred archaeological and historical sites, left over from Native American inhabitation and the
Gold Rush A gold rush or gold fever is a discovery of gold—sometimes accompanied by other precious metals and rare-earth minerals—that brings an onrush of miners seeking their fortune. Major gold rushes took place in the 19th century in Australia, New ...
period, were all situated in the reservoir flood zone. The environmental group
Friends of the River Friends of the River was founded in 1973 by Mark Dubois and Jerry Meral during the struggle to save the Stanislaus River from New Melones Dam. Some believe that the campaign to save the Stanislaus River marked the end of massive dam building i ...
(FOR) was formed in the early 1970s to push a statewide ballot measure
Proposition 17
which would have designated of the Stanislaus River between Stanislaus Powerhouse and Parrott's Ferry as a
National Wild and Scenic River The National Wild and Scenic Rivers System was created by the Wild and Scenic Rivers Act of 1968 (Public Law 90-542), enacted by the U.S. Congress to preserve certain rivers with outstanding natural, cultural, and recreational values in a free- ...
and stopped the construction of New Melones Dam. Development-related interests such as
PG&E The Pacific Gas and Electric Company (PG&E) is an American investor-owned utility (IOU). The company is headquartered in the Pacific Gas & Electric Building, in San Francisco, California. PG&E provides natural gas and electricity to 5.2 millio ...
, the California Chamber of Commerce and the contractors working on the dam spent millions of dollars lobbying against Prop 17
see images on the Stanislaus River Archive
. One of their slogans, "Stop the 'Wild River' Hoax!" argued that this part of the Stanislaus River was not untouched wilderness (as dams already existed both upstream and downstream of the 9-mile segment) and therefore was ineligible for Wild and Scenic designation. This statement was misleading, since the language of the Wild and Scenic Rivers Act does not disqualify rivers with dams – only the portions already inundated by reservoirs. Dam supporters also argued that the Stanislaus River in its natural state was only accessible to a small group of people; that the rafting companies held a "monopoly" on river recreation and a reservoir would open up the area for far more tourists than would have visited otherwise, bringing more economic benefits to the area. After Prop 17 lost by a voter margin of 53–47, the project's opponents – which had grown to include other environmental groups, such as the
Friends of the River Friends of the River was founded in 1973 by Mark Dubois and Jerry Meral during the struggle to save the Stanislaus River from New Melones Dam. Some believe that the campaign to save the Stanislaus River marked the end of massive dam building i ...
and the
Sierra Club The Sierra Club is an environmental organization with chapters in all 50 United States, Washington D.C., and Puerto Rico. The club was founded on May 28, 1892, in San Francisco, California, by Scottish-American preservationist John Muir, who b ...
– shifted their focus on limiting the amount of water the reservoir could hold, rather than trying to stop the dam altogether. In the meantime, construction on the dam continued to progress. On April 1, 1978 the gates of the diversion tunnel were closed, and New Melones Lake began to fill, soon inundating the old Melones Dam. As the reservoir filled, work moved ahead on the power plant and generating units, which were all completed by the end of 1978. The main embankment of the dam was topped out on October 28, 1978.


Protests and filling of the lake

On May 22, 1979, Mark Dubois, one of the founders of FOR, hiked into the Stanislaus River Canyon and chained himself to a boulder, forcing the Corps to stop filling the lake or risk drowning him. Dubois hid in the canyon for five days while local authorities tried unsuccessfully to find him; he had written letters to the Corps and Governor
Jerry Brown Edmund Gerald Brown Jr. (born April 7, 1938) is an American lawyer, author, and politician who served as the 34th and 39th governor of California from 1975 to 1983 and 2011 to 2019. A member of the Democratic Party, he was elected Secretary of S ...
telling them of his plans in advance
see documents and images of this event on the Stanislaus River Archive
. Ultimately, dam operators opened the gates, halting the rising reservoir at an elevation of , or about below its maximum design level. The Corps was delayed in handing the project over to the Bureau of Reclamation, as testing could not be completed on the hydroelectric turbines until the water level increased further. On May 29, Governor Brown vetoed Assembly Bill 2164, which would have allowed filling New Melones Lake to its full capacity. In the meantime, environmental groups lobbied for a compromise to stay the lake level a
the old Parrott's Ferry Bridge
above sea level, corresponding to a storage capacity of : "We can have a working dam and a wild river." The irrigation districts, Reclamation officials, and local representatives including
John Garamendi John Raymond Garamendi (; born January 24, 1945) is an American businessman, politician, and member of the Democratic Party who has represented areas of Northern California between San Francisco and Sacramento, including the cities of Fairfiel ...
and Norman S. Waters, argued that to complete the dam only to not fill it was absurd. The state of California initially sided with the opposition. On November 20, 1980 the State Water Resources Control Board set the temporary upper limit for lake level at the old Parrott's Ferry Bridge. With that limit in place, operations of the dam and reservoir were handed to Reclamation. Over the next two years the state continued to delay allowing the reservoir to fill because the Bureau of Reclamation had not convincingly demonstrated that "the irrigation need will outweigh any damage that results to fish, wildlife and recreation in the watershed above New Melones Dam." Further studies by the
California Department of Fish and Wildlife The California Department of Fish and Wildlife (CDFW), formerly known as the California Department of Fish and Game (CDFG), is a state agency under the California Natural Resources Agency. The Department of Fish and Wildlife manages and protec ...
and the Bureau of Reclamation itself showed that completely filling New Melones Lake would, in fact, offset some of the benefits of the project. For example, if additional water were provided for farms, even more water would have to be released into the Stanislaus River to wash out polluted
return flow Return flow is surface and subsurface water that leaves the field following application of irrigation water. While irrigation return flows are point sources, in the United States they are expressly exempted from discharge permit requirements under ...
s from new irrigation. A larger reservoir would also halt the Stanislaus' spring flooding to such an extent that it would harm the salmon populations that the dam was intended to benefit. Also, a higher reservoir would allow for less flood control space in emergencies. The state determined that the optimal reservoir volume was , which would provide enough water to fulfill existing rights and fishery flows as well as provide a hedge against droughts and floods; although it would inundate about of the river above Parrott's Ferry, FOR agreed to this compromise. Ultimately, it was nature, not political maneuvering, that led t
the filling of New Melones Lake
The winter and spring rainy season of 1982 was one of the wettest recorded in the 20th century. The Stanislaus River swelled to such high levels that it exceeded what could be safely released through the dam's outlets, and the reservoir rapidly surpassed the temporary limit. The winter of 1983 was even wetter and pushed water so high that it reached the lip of the emergency spillway (but did not flow over it), a level that has not been surpassed since. With the lake full, the state of California lifted the temporary limit in March, 1983. A deciding factor in the rescinding of the water-level limit was the prevention of $50 million in damages by New Melones Dam in 1982 and 1983, which demonstrated the dam's value for flood control.


Water rights disputes

New Melones Dam has a very large storage capacity relative to the watershed that feeds it, as compared to other major reservoirs in California. The potential water yield, and thus the supply contracts, of the Melones Project were calculated based on stream flow data between 1922 and 1978; however, this period may have been somewhat wetter than the long-term average. The Bureau of Reclamation estimated the additional water yield per year as but the actual yield has been closer to . As a result, the reservoir is often at a low water level because in most years demand is greater than supply. In the 38 years between 1978 and 2016, New Melones has only reached capacity five times, and only once (in 1983) has it reached the level of the spillway. Between 1987 and 1992 Reclamation was forced to purchase water from other agencies to fulfill New Melones' water obligations. Even so, the reservoir fell to a record low level of , 3.5% of capacity, on October 1, 1992. Conversely, the great storage capacity also means that New Melones can capture more flood runoff while other major California reservoirs must release it to maintain flood control space. The original contracted water supply from New Melones Dam was , of which was allocated to the Oakdale and South San Joaquin Irrigation Districts (who owned the original Melones Dam and have the oldest water rights); for Stanislaus River water quality and fishery conservation; and for the Stockton East Water District. Originally, Reclamation had planned to extend the water supply to other users, but even from the start, the Melones Project was barely able to meet these existing targets. New Melones releases are important for regional
groundwater recharge Groundwater recharge or deep drainage or deep percolation is a hydrologic process, where water moves downward from surface water to groundwater. Recharge is the primary method through which water enters an aquifer. This process usually occurs ...
, a vital water source for farmers when surface water supplies are cut off due to drought, and to protect water quality in the Stanislaus and San Joaquin Rivers by diluting pollutants during the late summer and fall dry season.


Fishery flows

After the Central Valley Project Improvement Act in 1991 and the Bay-Delta Water Quality Control Plan in 1995, much more water was required to meet target environmental flows in the Stanislaus and San Joaquin Rivers and the Delta, which conflicts with the original language of the 1962 act authorizing the dam, which stated that only "excess water" could be appropriated for these uses. One of the new requirements was for spring and autumn "pulse flows" intended to help migration of
anadromous fish Fish migration is mass relocation by fish from one area or body of water to another. Many types of fish migrate on a regular basis, on time scales ranging from daily to annually or longer, and over distances ranging from a few metres to thousan ...
(
Chinook salmon The Chinook salmon (''Oncorhynchus tshawytscha'') is the largest and most valuable species of Pacific salmon in North America, as well as the largest in the genus '' Oncorhynchus''. Its common name is derived from the Chinookan peoples. Other ...
and
steelhead trout Steelhead, or occasionally steelhead trout, is the common name of the anadromous form of the coastal rainbow trout or redband trout (O. m. gairdneri). Steelhead are native to cold-water tributaries of the Pacific basin in Northeast Asia and ...
in particular). This policy has been criticized by local irrigation districts as a waste of water during dry years, as fish populations have continued to struggle despite the additional flows. Reclamation officials argue that the flows are needed to meet state and federal requirements, as well as the earlier
Endangered Species Act The Endangered Species Act of 1973 (ESA or "The Act"; 16 U.S.C. § 1531 et seq.) is the primary law in the United States for protecting imperiled species. Designed to protect critically imperiled species from extinction as a "consequence of ec ...
of 1972. As a result, the Melones Project is now only able to meet all its contracts in ''above average'' water years. Local water users have coined the somewhat derisive nickname of "green dam" because the policy has shifted to favor fish rather than farmers. A further constraint is that water released in autumn must be cold enough for anadromous fish to survive, and thus must be made from the lower level outlets at New Melones Dam. However, the old Melones Dam was not demolished during the construction of the new dam (the original dam remains submerged far below the reservoir surface, only rarely re-emerging when the water level is low). The old dam partially blocks the movement of cold water from the deepest parts of the reservoir, causing warmer surface water to be drawn out instead. As a result, in certain years the amount of irrigation water has been reduced in order to maintain enough depth in New Melones Lake in the fall to preserve the cold water pool. A 2016 study by independent environmental consulting group FishBio showed that the artificial spring pulse flows from New Melones Dam do fairly little to support salmon and steelhead out-migration in the Stanislaus River. Rather, the fish take their cues from increased water flow due to rainfall, as they naturally would have before the many dams on the Stanislaus River were built. In the spring of 2016 about 12,500 juvenile salmon migrated downriver to the sea during April and May, but less than 1 percent migrated during the pulse flow. In years of drought when the lake level is low, releasing water during the spring creates consequences later in the year – because there is not enough cold water left for the autumn spawning run. The state of California has further proposed that between 20 and 60 percent of the unimpaired, or natural flow of the Stanislaus River be allowed to run downstream during the spring to support ailing fish populations. In addition, the minimum level of New Melones Lake would be set at (29 percent capacity) at all times in order to preserve the cold water pool. This would essentially limit the usable storage in the reservoir to the between the cold water pool and the flood-control pool, further handicapping the ability of the reservoir to manage water. This plan has been met with outcry from local cities and irrigation districts, which contend that it would heavily damage the farming economy and cause thousands of seasonal jobs to disappear. Furthermore, it does not address other major problems including introduced
striped bass The striped bass (''Morone saxatilis''), also called the Atlantic striped bass, striper, linesider, rock, or rockfish, is an anadromous perciform fish of the family Moronidae found primarily along the Atlantic coast of North America. It has ...
in the San Joaquin River, which eat many if not most of the juvenile salmon and steelhead before they even reach the sea.


Conflict and compromise

In 2015, Congressman
Tom McClintock Thomas Miller McClintock II (; born July 10, 1956) is an American politician serving as the U.S. representative for since 2009. His district stretches from the Sacramento suburbs to the outer suburbs of Fresno; it includes Yosemite National ...
introduced HR 1668, the "Save Our Water Act", which "amends the Endangered Species Act of 1973 (ESA) to suspend during droughts the application of the ESA to water releases from water storage facilities by federal and state agencies in a navigable river basin." McClintock specifically cited the release of from New Melones Lake over several weeks in spring 2015, when New Melones Lake was approaching its lowest level on record since the 1992 drought. That year, very few fish had returned to the Stanislaus to spawn; in an editorial for ''MyMotherLode'', Mark Truppner wrote: "Biologists estimate that it will affect the offspring of about 29 steelhead trout in the Stanislaus River – a few hundred smolts icalmost all of which will be eaten by predators long before they reach the ocean. And that assumes they won't swim toward the ocean on their own – as they have been doing without our helpful assistance since time immemorial." However the bill did not pass. One potential solution has been outlined in a 2016 agreement between the Bureau of Reclamation, the local water districts and a number of other state and federal agencies. The local water districts would provide of water for fishery flows during the spring; this water would be sold to the San Luis & Delta-Mendota Water Authority. Instead of draining into the ocean, it would be captured by the large Central Valley Project and
State Water Project The California State Water Project, commonly known as the SWP, is a state water management project in the U.S. state of California under the supervision of the California Department of Water Resources. The SWP is one of the largest public wat ...
pumping stations in the Delta for eventual re-use on Authority lands. Previously, Reclamation had been taking the Stanislaus irrigation districts' water without paying for it. Essentially, the agreement allows for the water to be re-used for agriculture while still maintaining fishery flows in the Stanislaus River.


Legacy

The controversy over New Melones Dam was one of the most heated environmental disputes in the U.S. at the time. The dam was constructed at a time of growing public support for environmental preservation, as compared to development or utilitarian conservation of natural resources. Friends of the River describes the campaign against the dam as "probably the biggest citizen effort to save a river and stop a dam in American history." The Bureau of Reclamation itself has called New Melones "a case study of all that can go wrong with a project." Although opponents of the dam were ultimately unsuccessful, the campaign greatly strengthened the political power of the river conservation movement in California and the rest of the United States; in California, a number of later dam projects were defeated by citizen opposition, including a hydroelectric project on the nearby
Tuolumne River The Tuolumne River (Yokutsan: ''Tawalimnu'') flows for through Central California, from the high Sierra Nevada to join the San Joaquin River in the Central Valley. Originating at over above sea level in Yosemite National Park, the Tuolumne ...
which was canceled less than two years after New Melones Dam was completed. In ''Dam Politics: Restoring America's Rivers'', William R. Lowry writes: The New Melones debate influenced the eventual protection of a number of other northern California rivers (the Eel, Klamath and others) under the
National Wild and Scenic Rivers System The National Wild and Scenic Rivers System was created by the Wild and Scenic Rivers Act of 1968 (Public Law 90-542), enacted by the U.S. Congress to preserve certain rivers with outstanding natural, cultural, and recreational values in a free- ...
starting in 1980. It considerably changed the California state government's approach to water resources development, switching focus from massive dam projects to conservation and policy improvements. In 1982, the same year that New Melones Lake filled, the Reclamation Reform Act set more stringent standards for vetting federal Reclamation projects, essentially "distancing federal policy from the 'dams-everywhere' approach of the past." However, the relative lack of new storage has severely strained California's water system, which now serves 15 million more people than it did when New Melones Dam was completed in 1979.


See also

*
California State Water Project The California State Water Project, commonly known as the SWP, is a state water management project in the U.S. state of California under the supervision of the California Department of Water Resources. The SWP is one of the largest public wate ...
*
List of United States Bureau of Reclamation dams Following is a complete list of the approximately 340 dams owned by the United States Bureau of Reclamation as of 2008. The Bureau was established in July 1902 as the "United States Reclamation Service" and was renamed in 1923. The agency has ...
*
List of dams and reservoirs in California Following is a list of dams and reservoirs in California in a sortable table. There are over 1,400 named dams and 1,300 named reservoirs in the state of California. Dams in service :''Please add to this list from the below sources.'' Former ...
*
List of largest reservoirs of California This is a list of the largest reservoirs, or man-made lakes, in the U.S. state of California. All fifty-three reservoirs that contain over of water at maximum capacity are listed. This includes those formed by raising the level of natural lakes ...
*
List of power stations in California This is a list of power stations in the U.S. state of California that are used for utility-scale electricity generation. This includes baseload, peaking, and energy storage power stations, but does not include large backup generators. , Ca ...
*
List of the tallest dams in the United States This is a list of the tallest dams in the United States. The main list includes all U.S. dams over tall, and a second list gives the tallest dams in each state. Dimensions given are for foundation height, not hydraulic height or head. Structur ...
*
Tulloch Dam Tulloch Dam is a hydroelectric dam on the Stanislaus River in central California. The dam is part of the Stanislaus River Tri-Dam project cooperatively owned by the Oakdale and South San Joaquin Irrigation Districts, and was completed in 1958. ...


Notes


References


Works cited

* * * * * *


External links


New Melones DamNew Melones Power PlantPost-Audit of New Melones Dam, by Kimra Dawn McAfee (Master's Thesis, May 2000)Proposition 17Stanislaus River Before New Melones Dam
(1975 footage)
Station Meta Data: New Melones Dam (NML)
* *
Stanislaus River Archive
{{Generating stations in California Dams completed in 1979 Energy infrastructure completed in 1979 1979 establishments in California Buildings and structures in Calaveras County, California Dams in California Buildings and structures in Tuolumne County, California Hydroelectric power plants in California United States Bureau of Reclamation dams Embankment dams Dams on the Stanislaus River Central Valley Project