New Chain of Rocks Bridge
   HOME

TheInfoList



OR:

The New Chain of Rocks Bridge is a pair of
bridge A bridge is a structure built to span a physical obstacle (such as a body of water, valley, road, or rail) without blocking the way underneath. It is constructed for the purpose of providing passage over the obstacle, which is usually someth ...
s across the
Mississippi River The Mississippi River is the List of longest rivers of the United States (by main stem), second-longest river and chief river of the second-largest Drainage system (geomorphology), drainage system in North America, second only to the Hudson B ...
on the north edge of St. Louis, Missouri. It was constructed in 1966 to bypass the
Chain of Rocks Bridge The old Chain of Rocks Bridge spans the Mississippi River on the north edge of St. Louis, Missouri. The eastern end of the bridge is on Chouteau Island (part of Madison, Illinois), while the western end is on the Missouri shoreline. Its most ...
immediately to the south. It originally carried traffic for Bypass US 66 and currently carries traffic for Interstate 270. The bridge opened to traffic on September 2, 1966. The original Chain of Rocks Bridge was a narrow bridge with a 22 degree bend midway over the river. Reportedly, two tractor-trailers could not pass each other on that bridge. The
Illinois Illinois ( ) is a state in the Midwestern United States. Its largest metropolitan areas include the Chicago metropolitan area, and the Metro East section, of Greater St. Louis. Other smaller metropolitan areas include, Peoria and Rock ...
Department of Transportation (IDOT) marks Historic Route 66 over the New Chain of Rocks Bridge (with a "Spur historic route" to the original), but it is only considered a way to make the route continuous.


History

In 1959, proposals first surfaced of a new bridge just to the north of the existing bridge at Chain of Rocks. One of the major opponents to the proposal was
Madison Madison may refer to: People * Madison (name), a given name and a surname * James Madison (1751–1836), fourth president of the United States Place names * Madison, Wisconsin, the state capital of Wisconsin and the largest city known by this ...
mayor Stephen Maeras, as his city owned the existing Chain of Rocks Bridge that was a toll bridge. The proposed 21 feet above the 1844 high-water mark also brought opponents asking the Corps of Engineers to reject the application. The construction was riddled by various labor and political problems. A death threat to kill a construction supervisor surfaced in July 1965, and by November 1965 the contractor stopped work on the bridge due to the "many troubles". Meanwhile, as the rest of I-270 was open by then, the City of Madison continued to collect toll revenue from the old bridge, averaging $50,000 to $60,000 per month. The state of Missouri, which was overseeing the construction project, would soon start an investigation as the project was several months behind schedule. The state decided on legal action against the City of Madison in regards to tolls on the old bridge by July 1966, and Madison suspended the tolls on August 2, 1966. On September 2, 1966 at 1:45 PM (13:45), the bridge was opened to traffic. This moment marked the completion of I-270 in St. Louis (not counting the section that was still marked I-244), and was the first of three interstate highway bridges opened in the St. Louis area. This opening could not come at a better time for the people in the nearby Alton area, as they were dealing a narrow bridge of their own at the time that had numerous problems and was facing another major closure due to repairs. As a result, any construction work or major accident on either bridge almost always made the Alton Telegraph (with the biggest stories making front page). In 1975, the
Clark Bridge The Clark Bridge is a cable-stayed bridge across the Mississippi River between West Alton, Missouri and Alton, Illinois. Named after explorer William Clark like the bridge it replaced, the cable-stayed bridge opened in 1994. It carries U.S. ...
closed for major repairs for a six-month period, and traffic was detoured onto this bridge. Many locals refer to it as the I-270 Bridge, to differentiate it from the original Chain of Rocks Bridge, which still stands but is closed to vehicle traffic. As the truck traffic from the I-70 corridor increased (I-70 thru truckers preferred the I-270 routing through St. Louis due to lower congestion and shorter distances), the Alton area used the 1975 detour as a rallying point in getting the Clark Bridge replaced. Although planning work was being done, there was no funding for that replacement. Meanwhile, the truck traffic was taking a toll on the Chain of Rocks Bridge over both the Mississippi River and Chain of Rocks Canal. Lane restrictions for expansion joint and pavement repairs on both structures was common during the 1980s and 1990s. The river bridge would soon be rated structurally deficient by 1991. In 1993, the Mississippi River experienced major flooding during the
Great Flood of 1993 The Great Flood of 1993 (or Great Mississippi and Missouri Rivers Flood of 1993) was a flood that occurred in the Midwestern United States, along the Mississippi and Missouri rivers and their tributaries, from April to October 1993. The flood wa ...
. North of St. Louis, all bridges from the McKinley Bridge up to the Keokuk Bridge were shut down due to flooding at one point or another. The I-270 bridge, despite having lower than normal clearance over the Mississippi River, remained open. The majority of the other bridges that were closed had flooded approaches, however, all of the approaches on I-270 were built on high ground and remained above water. This led to some of the worst traffic delays on the bridge during this time, especially during peak periods at the height of the floods. On January 4, 1994, the
Clark Bridge The Clark Bridge is a cable-stayed bridge across the Mississippi River between West Alton, Missouri and Alton, Illinois. Named after explorer William Clark like the bridge it replaced, the cable-stayed bridge opened in 1994. It carries U.S. ...
opened to traffic, giving the Chain of Rocks Bridge much needed relief. During the night of August 10, 1994, two pins supporting an expansion joint failed and caused a section on the Illinois end of the bridge to sink nearly 4 inches, causing 3 of the 4 lanes to close for emergency repairs. For the remainder of that month, various lanes would close due to emergency repairs and inspections and news regarding the emergency repairs frequently made headlines in the ''Alton Telegraph''. From June 1996 through December 1998, IDOT conducted a major bridge resurfacing project on both the river and canal bridges, with various expansion joints being replaced during this time. IDOT put an 8-6 width and legal weight restriction on the bridge, which forced the majority of trucks to take alternate routes during this time. Traffic would often clog during Friday afternoons while the construction went on. The weight and width restrictions would be lifted after the project concluded. As traffic demands continue to increase, the lack of shoulders on both the canal and river bridges is starting to prove a safety hazard. The canal bridge would receive a functionally obsolete rating. In addition, with the bridge still being at 4 lanes of traffic, any issue that occurs can cause big problems. On December 8, 2010, a major tractor-trailer accident would close the bridge for 10 hours and paralyze traffic in the Metro-East during the morning peak periods.


Replacement bridge

On August 23rd, 2022, the Missouri and Illinois departments of transportation awarded contracts to begin construction on a replacement for the "New" Chain of Rocks Bridge and interchange at Riverview Drive. Construction is expected to begin in the fall of 2022. The replacement bridge will include space for six 12-foot lanes and 10-foot shoulders.


Notes

* Until 1994, locals heavily used this crossing due to the constant problems of the
Old Clark Bridge The Old Clark Bridge was a bridge that carried U.S. Route 67 across the Mississippi River between West Alton, Missouri and Alton, Illinois. It was constructed beginning in 1927, was replaced by the Clark Bridge and was demolished in 1994. The brid ...
. * On August 10, 1994, a broken beam caused the closure of 3 of the 4 lanes on the bridge for a few days. The lanes were reopened on August 14, 1994. * The nearby Canal Bridges were replaced in the middle of 2014 after a nearly three-year-long construction project. The green truss bridges were imploded in phases on January 20, February 3, and February 19, 2015. * The I-70 Corridor of the Future by FHWA is favoring the I-270 corridor in St. Louis, which includes this bridge.


See also

* * * * *
List of crossings of the Upper Mississippi River This is a list of all current and notable former bridges or other crossings of the Upper Mississippi River which begins at the Mississippi River's source and extends to its confluence with the Ohio River at Cairo, Illinois. Crossings Minnesot ...


References


External links


1965 Construction PictureI-270 Chain of Rocks Complex
{{Structures in Greater St. Louis Bridges over the Mississippi River Road bridges in Illinois Bridges completed in 1966 Bridges in Greater St. Louis Bridges on the Interstate Highway System Bridges on U.S. Route 66 Metro East Bridges in St. Louis Road bridges in Missouri Interstate 70 Girder bridges in the United States Bridges in Madison County, Illinois 1966 establishments in Missouri 1966 establishments in Illinois Interstate vehicle bridges in the United States