Nzizi Power Station is a planned
natural gas Natural gas (also called fossil gas or simply gas) is a naturally occurring mixture of gaseous hydrocarbons consisting primarily of methane in addition to various smaller amounts of other higher alkanes. Low levels of trace gases like carbo ...
-fired thermal power plant in
Uganda }), is a landlocked country in East Africa East Africa, Eastern Africa, or East of Africa, is the eastern subregion of the African continent. In the United Nations Statistics Division scheme of geographic regions, 10-11-(16*) territor ...
.


Location

The power plant is planned to be constructed in Nzizi, near the Nzizi Natural Gas & Oil Field, in the Kaiso-Tonya Area in
Hoima District Hoima District is a district in Western Uganda. Like most other Ugandan districts, it is named after its main municipal centre, Hoima. Location Hoima District is bordered by Buliisa District to the north, Masindi District to the northeast, Kyan ...
in the Western Region of Uganda. Kaiso and Tonya are small settlements, about apart, on the eastern shores of Lake Albert. This is approximately by road, west of
Hoima Hoima is a city in the Western Region of Uganda. It is the main municipal, administrative, and commercial center of Hoima District. It is also the location of the palace of the Omukama of Bunyoro. Location Hoima is approximately , by road, nort ...
, the nearest large town and the location of the district headquarters. The approximate coordinates of the power station are 1°31'16.0"N, 30°58'05.0"E (Latitude:1.521104; Longitude:30.968047). The coordinates are approximate because the power station has not been built yet.


Overview

The power station is a planned joint project by Tullow Oil Uganda Limited, who will supply the fuel, and Jacobsen Electricity Company (Uganda) Limited, a wholly owned subsidiary o
Jacobsen Elektro AS
an independent Norwegian power production company, who will construct and operate the plant. The plant will primarily use natural gas to heat water and produce steam that will turn the turbines to produce electricity. If need be, the plant will also be designed to use
heavy fuel oil Heavy Fuel Oil (HFO) is a category of fuel oils of a tar-like consistency. Also known as bunker fuel, or residual fuel oil, HFO is the result or remnant from the distillation and cracking process of petroleum. For this reason, HFO is contaminate ...
, a byproduct of petroleum distillation, as an alternative fuel. The Nzizi Natural Gas & Oil Field, from which the power station will draw its fuel, has confirmed natural gas reserves of at least . The power generated will be evacuated along a 132 kilovolt transmission line to a substation in
Hoima Hoima is a city in the Western Region of Uganda. It is the main municipal, administrative, and commercial center of Hoima District. It is also the location of the palace of the Omukama of Bunyoro. Location Hoima is approximately , by road, nort ...
, where the power will be integrated into the national power grid. According to Uganda's government officials, construction is expected to commence in 2016 and last 10 months, with commissioning in 2017.


Construction costs

The total cost for the power plant is estimated at US$170 million (UGX:436.9 billion). Of that, US$25.5 million (UGX:65.5 billion) representing 15 percent of the total, will be contributed by the
Ugandan government Uganda is a presidential republic in which the President of Uganda is the head of state and the prime minister is the head of government business. There is a multi-party system. Executive power is exercised by the government. Legislative power is ...
.


See also

*
Uganda Oil Refinery The Uganda Oil Refinery is a planned crude oil refinery in Uganda. Location The refinery will be built on a piece of land in Kabaale Township, Buseruka Sub-county, Hoima District, Western Region, near the international border with the Democrat ...
*
Uganda National Oil Company The Uganda National Oil Company (UNOC), also known as the National Oil Company of Uganda, is a limited liability petroleum company in Uganda owned by the Ugandan government. The 2013 Petroleum (Exploration, Development and Production) Act of Uga ...
*
List of power stations in Uganda This article lists all power stations in Uganda. As of April 2019, national generation capacity was 1,177 megawatts of electricity. By January 2021, Uganda's generating capacity had increased to 1,268.9 megawatts. Hydroelectric Completed U ...
*
Hoima–Kampala Petroleum Products Pipeline The Hoima–Kampala Petroleum Products Pipeline (HKPPP) is a proposed pipeline to transport refined oil products from the Uganda Oil Refinery in Hoima to a distribution terminal near Buloba in Wakiso District, approximately , by road, west of Ka ...


References


External links


Approximate Location of Nzizi Power Station
{{Hoima District Natural gas-fired power stations in Uganda Proposed power stations in Uganda Hoima District