New Exchequer Dam is a concrete–faced, rock-fill dam on the
Merced River The Merced River (), in the central part of the U.S. state of California, is a -long tributary of the San Joaquin River flowing from the Sierra Nevada into the San Joaquin Valley. It is most well known for its swift and steep course through th ...
in central
California California is a state in the Western United States, located along the Pacific Coast. With nearly 39.2million residents across a total area of approximately , it is the most populous U.S. state and the 3rd largest by area. It is also the m ...
in the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country primarily located in North America. It consists of 50 states, a federal district, five major unincorporated territori ...
. It forms
Lake McClure Lake McClure is a reservoir in the Sierra Nevada foothills of western Mariposa County, California. It is formed by the New Exchequer Dam impounding the Merced River, which is a tributary of the San Joaquin River. It is about east of Modesto. ...
, which impounds the river for irrigation and hydroelectric power production and has a capacity of more than . The Merced Irrigation District (MID) operates the dam and was also responsible for its construction. Built between 1964 and 1967, the dam replaced the old arch type Exchequer Dam and stands high. At the time of completion, it was the largest dam of its kind in the world. The dam is named for the town of Exchequer which now lies under the reservoir, while the reservoir is named for Wilbur F. McClure, the State Engineer of California during construction.


History

In 1926, after five years of planning and construction, MID completed the Exchequer or "Great Exchequer" Dam across the Merced River six miles (9.7 km) above the town of Merced Falls. The dam was a concrete gravity–arch structure high, holding a lake with a capacity of of water. Although the dam was to serve primarily for irrigation, power production began ceremoniously on June 23, 1926 with a press of a telegraph key by President Calvin Coolidge, starting the turbines at a 31
megawatt The watt (symbol: W) is the unit of power or radiant flux in the International System of Units (SI), equal to 1 joule per second or 1 kg⋅m2⋅s−3. It is used to quantify the rate of energy transfer. The watt is named after James ...
hydroelectric plant. By the 1950s, it became apparent that the limited storage capacity at Exchequer was no longer enough to serve the needs of farmers in the Merced River valley. A high dam was proposed to be built just downstream, creating a reservoir nearly four times the size of Exchequer. Construction of New Exchequer Dam began on July 8, 1964, directly downstream from the old concrete arch dam. Tudor Engineering Company of
San Francisco San Francisco (; Spanish for " Saint Francis"), officially the City and County of San Francisco, is the commercial, financial, and cultural center of Northern California. The city proper is the fourth most populous in California and 17th ...
was responsible for the design of the new dam. The dam wall was constructed in vertical zones, which consisted of compacted, alternating layers of coarse and fine material ranging in thickness from . The old Exchequer Dam was incorporated as an upstream toe to help support the rock-fill embankment, which was then armored with a layer of reinforced concrete. The dam was topped out in early 1967 and the power plant went into commercial operation by July. As the new reservoir filled, it inundated an additional of the Merced River canyon and buried sections of the historic
Yosemite Valley Railroad The Yosemite Valley Railroad (YVRR) was a short-line railroad operating from 1907 to 1945 in the state of California, mostly following the Merced River from Merced to Yosemite National Park, carrying a mixture of passenger and freight traffic. ...
and the mining town of Bagby under of water. New Exchequer was among the first high concrete–faced rock-fill dams in the world, and its untested design resulted in significant leakage, sometimes up to . MID began to repair the leaks in the fall of 1985 under orders from the California Division of Safety of Dams. The dam has been able to halt major floods in many instances, such as the New Year's Day Flood of 1997. However, it has not always been able to weather the worst droughts – such as in 1977, when the reservoir fell to just , a fourteenth of capacity, and in 1991, which saw historic low water levels of . In February 2015, the reservoir reached its lowest level on record, at or less than 7 percent of total capacity, due to three years of persistent drought.


Dimensions and usage

New Exchequer Dam stands high from the foundations and above the Merced River. The dam is long, wide at the crest, wide at the base and is composed of of fill. High water releases are controlled by an ogee-type, gated overflow spillway located about north of the dam. The dam's power station has a capacity of 94.5 megawatts and generates about 316 million kilowatt hours annually. The reservoir has a storage capacity of , of which is reserved for flood control. At full pool, the reservoir has an elevation of , with of water and of shoreline. To fulfill downstream flood control requirements, the reservoir will only be allowed to rise into the flood-control pool if the flow downstream at Stevinson is forecast to exceed . MID has proposed raising the spillway gates of the dam, which would provide up to of additional storage. However, this has met with controversy because it would result in part-time flooding of a portion of the Merced River designated
Wild and Scenic The National Wild and Scenic Rivers System was created by the Wild and Scenic Rivers Act of 1968 (Public Law 90-542), enacted by the U.S. Congress to preserve certain rivers with outstanding natural, cultural, and recreational values in a free- ...
. Opponents also point out that the raise is unnecessary, since the reservoir has never overflowed due to flooding since its completion in the mid-1960s. Lake McClure is also extensively developed for recreational activities, with 515 campsites, four boat ramps and two marinas. In 1992, the lake received 606,000 visitor-days, mostly from May to September.


See also

* List of dams and reservoirs in California *
List of largest reservoirs of California This is a list of the largest reservoirs, or man-made lakes, in the U.S. state of California. All fifty-three reservoirs that contain over of water at maximum capacity are listed. This includes those formed by raising the level of natural lakes ...
*
List of power stations in California This is a list of power stations in the U.S. state of California that are used for utility-scale electricity generation. This includes baseload, peaking, and energy storage power stations, but does not include large backup generators. , Calif ...
*
List of reservoirs and dams in California Following is a list of dams and reservoirs in California in a sortable table. There are over 1,400 named dams and 1,300 named reservoirs in the state of California. Dams in service :''Please add to this list from the below sources.'' Former ...
*
List of the tallest dams in the United States This is a list of the tallest dams in the United States. The main list includes all U.S. dams over tall, and a second list gives the tallest dams in each state. Dimensions given are for foundation height, not hydraulic height or head. Structu ...
*
Water in California California's interconnected water system serves over 30 million people and irrigates over of farmland. As the world's largest, most productive, and potentially most controversial water system, it manages over of water per year. Water and wate ...


References


External links


Photos of original Exchequer Dam
{{Generating stations in California, state=autocollapse Dams in California Dams in the San Joaquin River basin Merced River Buildings and structures in Mariposa County, California United States local public utility dams Concrete-face rock-fill dams Dams completed in 1967 1967 establishments in California Hydroelectric power plants in California