Bongaigaon Thermal Power Station is an under construction power project located at Salakati near
Bongaigaon Bongaigaon () is a major city in the Indian state of Assam. Its urban area spans across Bongaigaon and Chirang district. The city also serves as the gateway of the North-East Frontier Railway Zone with its New Bongaigaon Junction railway sta ...
in
Kokrajhar district Kokrajhar district is an administrative district in Bodoland Territorial Region of Assam. It is predominantly inhabited by the Boro tribe. The district has its headquarters located at Kokrajhar Town and occupies an area of . It has two civil ...
in Indian state of
Assam Assam (; ) is a state in northeastern India, south of the eastern Himalayas along the Brahmaputra and Barak River valleys. Assam covers an area of . The state is bordered by Bhutan and Arunachal Pradesh to the north; Nagaland and Manipur ...
. The power plant is one of the
coal Coal is a combustible black or brownish-black sedimentary rock, formed as rock strata called coal seams. Coal is mostly carbon with variable amounts of other elements, chiefly hydrogen, sulfur, oxygen, and nitrogen. Coal is formed when dea ...
based power plants of NTPC. The
coal Coal is a combustible black or brownish-black sedimentary rock, formed as rock strata called coal seams. Coal is mostly carbon with variable amounts of other elements, chiefly hydrogen, sulfur, oxygen, and nitrogen. Coal is formed when dea ...
for the plant will be derived from Makum coal mines at
Margherita, Assam Margherita (IPA: ˌmɑːgəˈrɪtə) is a census town in Tinsukia district in the Indian state of Assam. The small sub-divisional town has scenic beauty and is surrounded by hills, tea gardens, forests and the Dihing River. It has a beautiful gol ...
and also from Eastern Coalfields Limited (ECL).


History

Kokrajhar Thermal Power Station is a coal based power plant situated in Salakati in the district of Kokrajhar in Assam. It consists of three coal-fired units of 250MW each. These units came into operation during the year 1981 to 1986 in two stages. In the first stage, two units (Unit I & II) were commissioned in 1981 and 1982 respectively. In the second stage, two units (Unit-III & IV) were commissioned in 1985 and 1986 respectively. Major equipment like boiler, turbine, auxiliaries like BFP, CEP, PA fans, bowl mills etc. were supplied by BHEL. In coal handling plant, major equipment like primary and secondary crusher were supplied by TRF and wagon tippler was supplied by Heavy Engineering Corporation (HEC). Since commissioning none of the units could deliver the desired level of generation for various reasons. Some of the main reasons were problems in the boiler, turbine, mill and other unit auxiliaries and also in the coal handling plant. During July 2002, the plant was running at a very low PLF of 4.6%, very high auxiliary power consumption of 22.68% very high specific oil consumption of 59.12 ml/kwhr and height specific coal consumption of 0.85 kg/kwhr with a coal of GCV 3500 Kcal/kg. None of the units could deliver the required level of generation and the maximum PLF of the plant in the last twenty years of operation has been only 24.23%. As a result, the station had to be shut down. It had been found that although it was technically feasible to renovate the existing units of NTPC, Salakati, it would not have been economically viable as the tariff works out to about Rs 3.16 per unit after carrying out R&M at an estimated cost of about Rs 7 billion. Hence, capital grant/viability gap funding of Rs 3.5 billion would have to be provided to bring down the tariff to an acceptable level of Rs 2.50 per unit. The alternative is NTPC's proposal to set up a new 750 MW (3 X 250 MW) Thermal Power Station at the same location, at a total project cost of approximately Rs Rs 44.9624 billion based on third quarter 2006 price level. The power station would be based on Fuel Gas Desulphurization (FGD) technology due to high sulphur content of Assam coal, involving an additional cost of Rs 0.5 crores/MW approximately.


Capacity

Its planned capacity of 750 MW (3x250 MW).


References

{{NTPC Power Stations Coal-fired power stations in Assam Kokrajhar district 2015 establishments in Assam Energy infrastructure completed in 2015