The MRT Putrajaya Line is the second Mass Rapid Transit (MRT) line in
Klang Valley Klang Valley ( ms, Lembah Klang; zh, 巴生谷; ) is an urban conglomeration in Malaysia that is centered in the federal territories of Kuala Lumpur and Putrajaya, and includes its adjoining cities and towns in the state of Selangor. It is co ...
,
Malaysia Malaysia ( ; ) is a country in Southeast Asia. The federal constitutional monarchy consists of thirteen states and three federal territories, separated by the South China Sea into two regions: Peninsular Malaysia and Borneo's East Mal ...
, and the third fully automated and driverless rail system in region. The line stretches from to
Putrajaya Putrajaya (), officially the Federal Territory of Putrajaya ( ms, Wilayah Persekutuan Putrajaya), is a planned capital city which functions as the administrative capital and the judicial capital of Malaysia. The seat of the federal governm ...
and runs through densely populated areas such as Sri Damansara, Kepong, Batu, Jalan Ipoh, Sentul, Kampung Baru, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama,
Seri Kembangan Seri Kembangan, formerly known as Serdang New Village, is a town located in Petaling District, Selangor, Malaysia. The town is now a considerable city in size. It is located near the northern end of the PLUS Expressway Southern Route . Histor ...
and Cyberjaya. Phase 1 operations of the line between and commenced on 16 June 2022. Phase 2 which will cover the remaining line is expected to be operational in March 2023. The line is numbered and coloured yellow on official transit maps. The line was developed and is owned by
MRT Corp Mass Rapid Transit Corporation Sdn Bhd (abbreviated as MRT Corp or MRTC) is a Malaysian state-owned company and a corporate body established under the Ministry of Finance (Incorporation) Act 1957. MRT Corp is fully owned by the Minister of Finan ...
but operated as part of the
Rapid KL Rapid KL (styled as ''rapidKL'') is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. With its coverage throughout Kuala Lumpur and Klang Valley areas, it was followed by ...
network by
Rapid Rail Rapid Rail Sdn Bhd is the operator of the rapid transit (metro) system serving Kuala Lumpur and the Klang Valley area in Malaysia. A subsidiary of Prasarana Malaysia, it is the sole operator of five rapid transit lines which collectively form t ...
. It also forms part of the Klang Valley Integrated Transit System. The newly built length of the line 52.2 km in length but includes 5.5 km of the MRT Kajang Line which was transferred to the MRT Putrajaya Line. The line includes a 13.5 km underground section. A total of 37 stations, 11 of them underground, will be built.


Route

The MRT starts in where it took over the section from here to Sungai Buloh from the MRT Kajang Line. From Sungai Buloh, the line parallels with the KTM Komuter line to Kepong Sentral/Sri Damansara Timur. However, there are a few stations the MRT line between the two which is not served by the KTM. The MRT then continues towards the towns of Kepong and Jinjang. As of the first phase, the Putrajaya line currently ends at Kampung Batu. At Jalan Ipoh, the line starts going underground while Jalan Ipoh itself being the only station on the network to be half-sunken/sub-surface. The line carries under the Ipoh Road to Titiwangsa which will interchange with the LRT Ampang/Sri Petaling Line and
KL Monorail The KL Monorail Line is one of the operational monorail systems in Malaysia. Operated as part of the RapidKL system by Rapid Rail, a subsidiary of Prasarana Malaysia, it is one of the components of the Klang Valley Integrated Transit System. Th ...
. The MRT will pass under the Kuala Lumpur Hospital and interchange with the
LRT Kelana Jaya line The LRT Kelana Jaya Line is a medium-capacity light rapid transit (LRT) line and the first fully automated and driverless rail system in the Klang Valley, Malaysia. It forms a part of the Klang Valley Integrated Transit System in and around K ...
at Ampang Park. At KLCC, Persiaran KLCC serves as another station at the KLCC area. The line continues to Tun Razak Exhange, interchanging with the Kajang line. The Putrajaya Line reunites with the Ampang/Sri Petaling line at Chan Sow Lin station. After the cancelled Bandar Malaysia stations, the MRT Putrajaya line resurfaces at Kuchai. Once again, the line meets with the LRT Sri Petaling line at Sungai Besi station, then continuing to serve Serdang. Following this, the line parallels the ERL KLIA Transit until Putrajaya, but the Putrajaya line has station in between. The University of Putra Malaysia is served by the UPM MRT station. It continues to serve small suburbs and towns along the way such as Taman Equine and
16 Sierra Sixteen or 16 may refer to: *16 (number), the natural number following 15 and preceding 17 *one of the years 16 BC, AD 16, 1916, 2016 Films * ''Pathinaaru'' or ''Sixteen'', a 2010 Tamil film * ''Sixteen'' (1943 film), a 1943 Argentine film dir ...
. Before the MRT meets the ERL, the line has two stations in Cyberjaya. Finally, the MRT line meets the ERL at
Putrajaya Sentral ta, புத்ராஜெயா செண்ட்ரல் , address = Presint 7, Putrajaya , borough = , country = Malaysia , coordinates = , grid_name = , grid_position ...
, terminating at this station. The station may be integrated with the proposed
Putrajaya Monorail The Putrajaya Monorail is an incomplete monorail system in Putrajaya, Malaysia. Construction has been stalled since 2004, but in 2020, it was stated that the system would be completed by 2025. Putrajaya was originally planned to include a light ...
in the future. Putrajaya Sentral will also be the southernmost station under the Rapid KL rail network.


Chronology

*13 October 2014 – The 2nd MRT line is now planned to be from Sungai Buloh, Selayang to Pandan; instead of from Kuala Lumpur to Port Klang. *3 December 2014 – During a briefing of the 1st MRT line, the MRT CEO revealed more details about the 2nd line. He had said that the line will be 59.5 km long with 49.3 km will be elevated and 10.2 km will be underground. There will be 40 stations where 31 will be elevated and 9 will be underground. Construction is expected to begin by November 2015 will approval and public discussion starts in early 2015. *12 February 2015 – MRT Corp prepares tender for MRT2, project display in Q2. *16 March 2015 – MRT2 from Sungai Buloh to Putrajaya has been approved by the Federal government. The project was allocated RM23 billion in the Budget 2015. *2 April 2015 – New alignment for MRT2 proposed. The alignment south of Tun Razak Exchange was then altered drastically to provide connectivity with the proposed High Speed Rail project. With this revision, the line stands at 52.2 km long with a total of 36 stations. Of these, 11 are underground while 25 are elevated. *22 April 2015 – Department of Environment (DOE)'s Detailed Environment Impact Assessment (DEIA) for the MRT2 is available for download from their website. *14 May 2015 – Details of MRT2 project on public display start on 15 May 2015. The public can visit the SPAD office, MRT Corp offices,
Kuala Lumpur , anthem = ''Maju dan Sejahtera'' , image_map = , map_caption = , pushpin_map = Malaysia#Southeast Asia#Asia , pushpin_map_caption = , coordinates = , sub ...
City Hall, Selayang Municipal Council and
Petaling Jaya ) , website = , image_skyline = , image_caption = ''From top, left to right:Skyline of Petaling Jaya, the 1 Utama Mall integrated with Bandar Utama Station, the Kota Darul Ehsan arch, the Petaling ...
City Council, with roadshows, primarily at shopping malls near the MRT2 alignment. *12 August 2016 – On the MRT2 project, the groundbreaking ceremony was expected to be held at end of the month of August 2016 or early September 2016. *15 September 2016 – Construction on the MRT line launched with a groundbreaking ceremony at the site of the future
Putrajaya Sentral ta, புத்ராஜெயா செண்ட்ரல் , address = Presint 7, Putrajaya , borough = , country = Malaysia , coordinates = , grid_name = , grid_position ...
MRT station by former Prime Minister Dato' Seri Najib Tun Razak. *31 March 2017 – The line is 5.3% completed. *24 May 2017 – 7.5% of the line was completed. For the elevated section, progress of the first and second packages are at 20.9% and 10.3% respectively with increased works being seen from Jalan Kuala Selangor to Jalan Kepong. Whereas for underground works, the work progress was at 8.7%. *June 2017 – The line is 10.25% completed, based on the video released by MRT Corp on 18 December 2017. *5 September 2017 – The line has reached the completion of 12.05% and expected to reach 19% by the end of 2017. The underground works will commence by the first quarter of 2018 with the arrival of 2 Tunnel Boring Machine (TBMs) within 2–3 weeks and another 2 of them by early next year. *26 September 2017 – The project director Datuk Amiruddin Ma’aris mentioned the line is currently achieved completion of 13.70%. *28 September 2017 – According to the MRT Corp director of underground works for the MRT line, Blaise Mark Pearce, 23% of the underground works for the MRT line were expected to be completed by the end of 2017. *10 October 2017 – An explosion has occurred at the Mass Rapid Transit (MRT) station construction site in Bandar Malaysia. According to the police, it was believed that the explosion happened because of an old unexploded bomb from the Second World War through the initial investigation. Three Bangladesh workers were seriously injured and two of them lost their legs while another suffered injuries on the hands and legs. *13 October 2017 – Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) has won the prestigious “Be Inspired Awards 2017” for its use of Building Information Modelling (BIM) in the construction of the MRT line. *13 November 2017 – The first Tunnel Boring Machine arrived in Port Klang and delivered to site. The rest are expected to arrive in coming weeks. *18 December 2017 – MRT Corp released a video describing the progress of the MRT line from 2016 to 2017 in YouTube. The progress is described in packages. The progress statistics are: 23.68%, 15.43%, 9.05%, 10.32%, 35.31% and 11.51% respectively for packages V201, V202, V203, V210, Serdang Depot and underground. *1 January 2018 – Malaysia's 1st shopping mall, Ampang Park, is officially ceased its operation in order to make way to the construction of the Ampang Park station under such line. *18 February 2018 – The line has achieved 21% completion. The final Tunnel Boring Machine for the MRT line is expected to be launched by mid-2019. *1 March 2018 – Underground works commenced with the first Tunnel Boring Machine. The launching is done at the shaft located at the Bandar Malaysia North MRT station. The line has achieved 22% completion according to the CEO of the MRT Corp, Datuk Seri Shahril Mokhtar. *3 March 2018 – A construction worker died while two others survived when a launching gantry at an MRT construction site in Jalan Jinjang (Work Package V203), collapsed at around 11:40pm. *23 April 2018 – The Director of Strategic Communications and Stakeholder Relations from MRT Corp, Dato' Najmuddin Abdullah, says the line is now completed at the progress of more than 24%. *June 2018 – The line is 30% completed, based on the video released by MRT Corp on 9 December 2018. *11 July 2018 – The line was close to 30% complete as at early July, according to the project director Datuk Amiruddin Ma’aris. *8 October 2018 – The Finance Minister, Lim Guan Eng announced the decision to change the project structure as well as terminate the contract from MMC-Gamuda and re-tender the unfinished underground portion of the project by an open tender process, due to the fact the Federal Government and MMC-Gamuda have failed to reach an agreement relating to the underground portion of the construction project. This decision had caused a lot of protests from MMC-Gamuda and workers due to the fact that some 20,000 workers tend to lose their job. *9 October 2018 – The shares of MMC and Gamuda fell due to the government's decision to terminate the underground section project. *10 October 2018 – The Prime Minister, Tun Dr. Mahathir Mohamad told the press that the decision to cancel the contract from MMC-Gamuda for the underground portion will be reconsidered. *11 October 2018 – The Economic Affairs' Minister, Dato' Seri Azmin Ali confirmed that the Cabinet has set up a committee to review the underground contract that was awarded to MMC-Gamuda for the project. According to the source, the four members of the committee are Minister of Finance Lim Guan Eng, Minister of Works Baru Bian, Transport Minister Anthony Loke and Economic Affairs Minister Azmin Ali. *17 October 2018 – The Finance Minister, Lim Guan Eng said the decision to terminate the contract was Cabinet's decision. *26 October 2018 – Due to budget concerns, and a re-tender, construction costs proposed by MMC-Gamuda is about half what it was previously. The two Bandar Malaysia Stations have also been cancelled. The cost for construction of the underground portion is now RM13.11 billion. This brought to the entire cost for this project to be RM30.53 billion from the RM39.35 billion previously. This means MMC-Gamuda now secured the contract of the underground section and allowed to continue the construction. *13 November 2018 – Three MRT stations from the MRT Kajang Line ( Sungai Buloh, Kampung Selamat and
Kwasa Damansara Kwasa Damansara is a new township located in the Sungai Buloh constituency of Selangor, Malaysia. Located 14 km northwest of Kuala Lumpur's central business district, it borders Kota Damansara to the south and Sungai Buloh to the north. Currently ...
) closed for two days to accommodate the first migration system works of the line. *9 December 2018 – MRT Corp released another video describing the progress of the MRT line from 2017 to 2018 in YouTube. The progress is described in packages. The progress for all packages have been mentioned. Package V201 achieved the highest progress with 45.7% whilst package V206 achieve the lowest progress with 13.1%. Underground section had the progress with 33.3%. *24 January 2019 – The first batch of carriages for the two sets of trains have arrived at Westport, Port Klang. *29 January 2019 – First TBM breakthrough happened at Chan Sow Lin station. The TBM was bored between Bandar Malaysia North and Chan Sow Lin. MRT Corp Sdn Bhd strategic communications and stakeholder relations director, Datuk Najmuddin Abdullah said the overall construction was on track with a 41% completion rate as of December 2018. *9 March 2019 – Three MRT stations from the MRT Kajang Line ( Sungai Buloh, Kampung Selamat and
Kwasa Damansara Kwasa Damansara is a new township located in the Sungai Buloh constituency of Selangor, Malaysia. Located 14 km northwest of Kuala Lumpur's central business district, it borders Kota Damansara to the south and Sungai Buloh to the north. Currently ...
) closed again for two days to accommodate the second migration system works of the line. *15 March 2019 – Second TBM breakthrough at Chan Sow Lin station based on the Instagram source from Datuk Najmuddin Abdullah. *15 March 2019 – Ninth and final TBM breakthrough of the year at Ampang Park station. *17 January 2020 – MRT is 70% completed with expected completion date for Phase 2 delayed to January 2023. *31 October 2020 – MRT Putrajaya Line construction is 82.51% completed. Phase One from the
Kwasa Damansara Kwasa Damansara is a new township located in the Sungai Buloh constituency of Selangor, Malaysia. Located 14 km northwest of Kuala Lumpur's central business district, it borders Kota Damansara to the south and Sungai Buloh to the north. Currently ...
to the Kampung Batu will begin operations in July 2021, while the rest of the line from the Kampung Batu Station to the
Putrajaya Sentral ta, புத்ராஜெயா செண்ட்ரல் , address = Presint 7, Putrajaya , borough = , country = Malaysia , coordinates = , grid_name = , grid_position ...
will be operational under Phase Two in January 2023. *3 April 2021 – The Construction progress of Phase One section of the MRT Putrajaya Line (
Kwasa Damansara Kwasa Damansara is a new township located in the Sungai Buloh constituency of Selangor, Malaysia. Located 14 km northwest of Kuala Lumpur's central business district, it borders Kota Damansara to the south and Sungai Buloh to the north. Currently ...
Kampung Batu) is at 97% and will begin operations in August 2021. *7 July 2021 - MRT Corp decided to postpone the opening of phase 1 from August to mid-November 2021 due to the COVID-19 movement control order in Malaysia. *16 November 2021 - MRT Corp announced that Phase 1 opening will be delayed again to the second quarter of 2022 as further tests are required. No exact date was provided. *2 December 2021 - MMC-Gamuda won Major Project of the Year award from International Tunnelling and Underground Space Association (ITA) for projects above 500 million euros. They managed to beat out the Ismailia Tunnels project under the
Suez Canal The Suez Canal ( arz, قَنَاةُ ٱلسُّوَيْسِ, ') is an artificial sea-level waterway in Egypt, connecting the Mediterranean Sea to the Red Sea through the Isthmus of Suez and dividing Africa and Asia. The long canal is a popula ...
,
Egypt Egypt ( ar, مصر , ), officially the Arab Republic of Egypt, is a List of transcontinental countries, transcontinental country spanning the North Africa, northeast corner of Africa and Western Asia, southwest corner of Asia via a land bridg ...
and Shantou Bay Tunnel project from
China China, officially the People's Republic of China (PRC), is a country in East Asia. It is the world's List of countries and dependencies by population, most populous country, with a Population of China, population exceeding 1.4 billion, slig ...
. *6 December 2021 - MMC Gamuda also bagged the International Project of the Year at the Ground Engineering Awards 2021 in
London London is the capital and List of urban areas in the United Kingdom, largest city of England and the United Kingdom, with a population of just under 9 million. It stands on the River Thames in south-east England at the head of a estuary dow ...
. *20 March 2022 - MRT Corp is currently looking at June 2022 as the possible opening date of Phase 1 operations. It has also said that the opening date depends on the results from the test runs. *21 May 2022 - MRT Corp confirms that Phase 1 operation will start at 3pm on June 16, 2022. *16 June 2022 - Launch of the MRT Putrajaya Line Phase 1 operations by Prime Minister
Ismail Sabri Yaakob Malay styles and titles#State titles, Dato' Sri Ismail Sabri bin Yaakob ( ms, اسماعيل صبري بن يعقوب, label=Jawi alphabet, Jawi, script=arab, italic=unset; born 18 January 1960) is a Malaysian people, Malaysian lawyer and poli ...
, along with 1 month of free rides for all public transportation services under RapidKL including the MRTs. *23 December 2022 - The construction works of MRT Putrajaya Line Phase 2 were completed and the operational readiness phase is in progress. Because the tests may take longer period than usual to pass, the opening date of Phase 2 will be postponed to March 2023.


Station designs


Elevated station concepts

The proposed design for the elevated stations is based on the “Serambi” concept. This concept is focused on the inspiring interaction and communication at a foyer or entrance space of a house such as the entrance space at a traditional “rumah kampung” or “rumah panjang”. The design opted is a simple and timeless design, which is derived from various design concepts, including that of the Japanese “Zen” concept. Other aspects include open space, natural lighting and ventilation, and natural visual effects via play of lighting and shadows. Compared to the Kajang Line's elevated station design, the columns have been pushed to the sides of the station, giving the stations an open and airy feel.


Underground station concepts

Each of the underground stations will carry its own individual theme, similar to that of the Kajang Line stations. The proposed designs range from preserving the rustic, reflecting tidal rhythm, promoting well-being, vibrancy, pulse of life, discovering culture, molding forms, inspired by nature to streamlined flow.


List of stations

28 (23 elevated + 1 half-sunken + 4 underground) out of 35 stations (excluding the ones on the MRT Kajang Line) are expected to have feeder bus services. Kwasa Damansara station, along with the adjoining Sungai Buloh and Kampung Selamat stations were previously built as part of the MRT Kajang Line. These three stations are currently annexed by the Putrajaya Line, thus making
Kwasa Damansara Kwasa Damansara is a new township located in the Sungai Buloh constituency of Selangor, Malaysia. Located 14 km northwest of Kuala Lumpur's central business district, it borders Kota Damansara to the south and Sungai Buloh to the north. Currently ...
the interchange station between the two MRT lines.


Rolling stock

The rolling stock will be provided by HAP Consortium which consists of
Hyundai Rotem Hyundai Rotem (founded in 1977) is a South Korean company that manufactures rolling stock, defense products and plant equipment. It is a part of the Hyundai Motor Group. Its name was changed from Rotem to Hyundai Rotem in December 2007 to refl ...
, Apex Communications and
POSCO POSCO (formerly Pohang Iron and Steel Company) is a South Korean steel-making company headquartered in Pohang, South Korea. It had an output of of crude steel in 2015, making it the world's fourth-largest steelmaker by this measure. In 2010, i ...
Engineering. The trains are assumed to be driverless with a capacity of 1,200 passengers in a 4-car trainsets formation. The 4-car trainsets will be maintained at 2 purpose-built facilities, Sungai Buloh and Serdang depots, located nearby Kwasa Damansara and the proposed Taman Universiti stations respectively.


Formation

The train consists of four cars, with car 1 facing towards Kwasa Damansara and car 4 facing towards Putrajaya Sentral.


References


Notes


External links


Mass Rapid Transit Corporation (MRT Corp)



Prasarana Malaysia Berhad (Prasarana)

Suruhanjaya Pengangkutan Awam Darat (SPAD)
{{DEFAULTSORT:Sungai Buloh-Serdang-Putrajaya MRT line Proposed rail infrastructure in Malaysia Klang Valley Railway lines opened in 2022