Meander Dam
   HOME

TheInfoList



OR:

The Meander Dam is a concrete gravity dam across the Upper Meander River, located in northern Tasmania, Australia. The impounded reservoir is called
Lake Huntsman Lake Huntsman is an artificial lake created in 2007 in Tasmania, Australia, with the construction of the Meander Dam, which backed up the waters of the Upper Meander River and the various creeks and rivulets that flowed into it from the Great We ...
. The dam was constructed in 2006 by the Tasmanian Rivers & Water Supply Commission for the principal purpose of delivering a reliable supply of irrigation water to the
Meander Valley Meander Valley Council is a local government body in northern Tasmania. It covers the western outskirts of Launceston, and further westward along the Meander River. Meander Valley Council is classified as a rural local government area and h ...
, estimated at . Adjacent to the dam is a small conventional
hydroelectric Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and ...
power station.


Features and location

Proposals to build a dam on the Meander River below Warners Creek date back to at least 1968. The site was cleared in preparation for dam construction during the last 1980s. In 1995 a report by engineering consultants, GHD Group, stated that the lack of a reliable water supply for irrigation in the Meander Catchment is seen as a key factor limiting potential future expansion of agricultural enterprises. The pressure on water resources in the Meander Catchment resulted in the need to limit and sometimes prohibit the extraction of water from the river during the irrigation season. In 2002, a water management plan for the catchment was under development and was expected to address environmental flow concerns through the implementation of higher minimum river flows. This increase in minimum flows would result in the need to reduce the irrigation water currently extracted from the river, which would reduce agricultural production and prevent the development of water dependent agricultural enterprises. However, the dam faced considerable opposition. Despite being passed by two other statutory committees of the
Tasmanian Parliament The Parliament of Tasmania is the bicameral legislature of the Australian state of Tasmania. It follows a Westminster-derived parliamentary system and consists of the Governor of Tasmania, the Tasmanian House of Assembly (the lower house), and T ...
, the Resource Management and Planning Appeal Tribunal knocked it back on economic and environmental grounds. The Tribunal vetoed the construction of the dam because it could not determine its economic value - as estimates ranged from a loss of 600,000 to nearly 40 million - and because it would affect two threatened species the ''epacris'' plant and the spotted tail quoll. In September 2003, following intervention by the Australian Government, the project was approved. The Meander Dam wall, constructed with of concrete, the gravity dam is high and long. At 100% capacity the dam wall holds back of water. The surface area of Lake Huntsman is and the catchment area is . The single uncontrolled centrally located conventional spillway is wide with four off Flowgate spillway gates. Since completing the construction of the Meander Dam a further four pump and pipeline schemes have been built to expand the reach of the water available from the dam and deliver irrigation water to the adjoining farming districts of Caveside-Dairy Plains, Rubicon River, Quamby Brook and Hagley. In 2008, Irrigation Tasmania installed a 215m long floating safety barrier, to protect recreational users from the hazards of the overflow spillway.


Power plant

The Lake Huntsman Power Station has one unique double Francis-type turbine, with a generating capacity of of electricity. The Meander Dam, which creates Huntsman Lake and supplies the power station with water was completed in November 2007. The power station was commissioned in February 2008 by Tyco Tamar. Electric power generation is a by-product of water released to primarily satisfy irrigation purposes.


See also

*
List of power stations in Tasmania This is a list of active power stations in Tasmania, Australia. Candidates for this list must already be commissioned and capable of generating or more of electricity. Gas Thermal gas These power stations use gas combustion to power steam ...


References


External links

* *Huntsman Lake page o
Tas Fish
{{EnergyTasmania Dams completed in 2007 Energy infrastructure completed in 2008 Hydroelectric power stations in Tasmania Dams in Tasmania Gravity dams Roller-compacted concrete dams Meander Valley Council