The Markbygden Wind Farm is a series of interconnected
wind farm A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used Wind power, to produce electricity. Wind farms vary in size from a small number of turbines to several hundre ...
s in the Markbygden area west of
Piteå Piteå () is a locality and the seat of Piteå Municipality in Norrbotten County, Sweden. Piteå is Sweden's 58th largest city, with a population of 23,326. Geography Piteå is located at the mouth of the Pite River ( sv, Piteälven), at th ...
, Norrbotten county in northern Sweden. The project is expected to be completed by 2025 and might have a capacity of up to 4,000
megawatts The watt (symbol: W) is the unit of power or radiant flux in the International System of Units (SI), equal to 1 joule per second or 1 kg⋅m2⋅s−3. It is used to quantify the rate of energy transfer. The watt is named after James Watt ...
(MW), comprising up to 1,101 wind turbines. The project was initially co-developed by Svevind AB and wind turbine manufacturer
Enercon Enercon GmbH is a wind turbine manufacturer based in Aurich, Lower Saxony, Germany. It has been the market leader in Germany since the mid-1990s. Enercon has production facilities in Germany (Aurich, Emden and Magdeburg), Brazil, India, Canada, ...
. Combined the Markbygden Wind Farm is already the biggest wind farm in Europe, on track to be one of the biggest onshore windfarms in the world.


Layout

The project is divided into three larger phases plus two pilot projects, subdivided as follows:


History

The original plan was forged amongst Svevind and Enercon. If fully constructed, the 55 billion kronor (€5.1 billion, US$6.9 billion) project would be the largest onshore wind farm in Europe and one of the biggest in the world. The wind farm will cover some 450 square kilometers, comprising up to 1 101 wind turbines and is expected to produce up to 12 TWh/year of electricity. The project received the approval by the Norrbotten County authorities in April 2009. On 4 March 2010 the Swedish Government decided to permit Markbygden Vind AB to build and run up to 1 101 wind turbines with a maximum height of in the Markbygden area of Piteå Municipality. Status as of October 2021


Phase 1

Phase 1 consists of three wind farms or projects; 101,1 MW Ersträsk, 644,4 MW Markbygden ETT, and 84,6 MW Skogberget,. Markbygden ETT was sold by Svevind to others. Ersträsk is developed by wind turbine manufacturer Enercon. The first wind farm in Markbygden's phase 1 project was commissioned in 2014 and consists of 36 turbines, Enercon E-92 with 138m hub height. From December 2015, Svevind and Enercon set up a new structure. With that Enercon was taking over Svevind's shares of the operational Skogberget and Ersträsk wind farms. Markbygden ETT ("ETT" means one in Swedish language) and is with its 179 wind turbines alone one of the largest single onshore wind farms in Europe. All power generated by the entire Markbygden phase 1 wind farms is transferred via the Råbäcken transformer station to the Swedish 400kV national grid.


Phase 2

Markbygden phase 2 is the westernmost part of the wind power project in Markbygden with an area that covers about . On December 10, 2015, the Environmental Court ruled on this second phase of the Markbygden project. The decision has gained legal force. This second phase will be connected to a new 400kV transformer station called Trolltjärn. The Markbygden phase 2 project is developed by Enercon since December 2015. The installed capacity may be as large as 844 MW. As of October 2021 63 Enercon E-138 turbines with a total installed power of 252,7 MW are operational.
Credit Suisse Credit Suisse Group AG is a global investment bank and financial services firm founded and based in Switzerland. Headquartered in Zürich, it maintains offices in all major financial centers around the world and is one of the nine global " ...
acquired 85% of the 63-turbine northern project in 2020. Plans for about 100 more turbines still exist.


Phase 3

Markbygden phase 3 is the third, last and potentially the largest part of the overall wind power project in Markbygden. It is located between the villages of Koler and Långträsk in the western part of the project and Blåsmark to the east, entirely within Piteå municipality. The area of Markbygden phase 3 is approximately long and wide. The area is about in total. The wind farm of Markbygden phase 3 will consist of up to 442 wind turbines. The permit was granted on March 17, 2016. The decision of the Environmental impact assessment committee was appealed, after which the Land and Environmental Court announced a decision on the case on June 16, 2017. The decision of the Land and Environmental Court has thereafter been appealed to the Land and Environmental Superior Court, which approved it in 2018. The Markbygden phase 3 wind farms are planned to be connected to the existing 400kV transformer station Råbäcken as well the transformer station Trolltjärn. The Önusberget 750 MW share of phase three was acquired by German asset manager Luxcara in April 2019, powered by 137 GE Cypress 5.5MW turbines for 25 years.


See also

*
Wind power in Sweden Sweden consumes about 150 terawatt hours of electricity per year, of which about 19.8 TW·h (14.2%) was generated from domestic wind power resources in 2019, up from 2.4% in 2010 and 0.3% in 2000. In its official forecast , the Swedish Win ...
*
Renewable energy in Sweden Energy in Sweden describes energy and electricity production, consumption and import in Sweden. Electricity sector in Sweden is the main article of electricity in Sweden. The Swedish climate bill of February 2017 aims to make Sweden carbon neut ...


References


External links

*{{cite web, url=https://svevind.se/en/13290-2/, title=The Journey of 1101*, publisher=Svevind AB, access-date=9 September 2020 Proposed wind farms in Sweden