History
Majalgaon dam and Majalgaon Right Bank Canal are components of the Jaikwadi Project Stage II. A dam has been constructed across the Sindhaphana river, which is a major tributary of the Godawari river, also known as Dakshin Ganga. The project was approved by the government of Maharashtra in 1976 for an estimated cost of Rs 5433 lakhs. Majalgon Dam is to be built from earth berms on either side of a gated concrete spillway. The spillway will be approximately 2 kilometers upstream from the town of Majalgaon. The dam will have three hydroelectric generators, each capable of generating 750 kilowatts. In addition, a canal 165 kilometers long was constructed to irrigate 93885 hectares (ICA) of land in Beed, Parbhani & Nanded districts.Land acquisition and Rehabilitation
34 Villages were affected by construction of the dam. Out of these 34, 18 are submerged and two are partly under water. The total area of land covered by water is 7813 ha. No forest land was flooded, and affected villages are relocated in 26 new gawthans. The height of the dam from its foundation is while the length is . The volume content of dam is 5.759 million cubic meters and gross water storage capacity behind the dam is .Purpose
*Specifications
*River : Sindhfana river, Kundlika river, feeding from Nathsagar through P.R.B. Canal *Location of Dam: 2 km upstream of Majalgaon *Taluka : Majalgaon *District: BeedYield and Utilization
*catchment area : 3840 km2 *average annual yield : 3888.42 m.cum *75% dependable yield:2833.83 m.cum *gross average annual Utilization : 1185.75 m.cum *% of annual utilization : 72.8%Dam and reservoir
*gross storage: 453.64 m.cum *dead storage: 142.30 m.cum *live storage: 311.34 m.cum *minimum draw down level (MDDL) : 426.11 m. for irrigation 428.35 m. for hydro *M.W.L: 434.8 m *F.R.L: 431.8 m *T.B.L : 435.6 m *River Bed : 405.4 m *Crest (क्रेस्ट) Level : 423.8 m *Canal Sill Level : 424.7 mOutlet details
*Irrigation outlet: 4950 m on right flank *Power outlet: 4975.25 m on right flank type Conduct Conduct F.S Discharge 83.8 Cumecs 20 Cumeecs * M.R.B.C **Full supply 83.6 Cumecs **discharge at head **Length 165 km **type Lined *Command Area **Grass Command area 131520 ha **Cultivable Command Area 119400 ha **Net irrigation Area 93885 ha **Annual Cropped Area 96225 haCrops in irrigation area
*Sugar cane 3% *Other perennials 1.5% *Rice 10% *L.S.Cotton 25% *Two Seasonal 3% *Rabi Seasonal Jawar 15% *Wheat 25% *Hot weather 3% *Kharif Jawar 12% *gram 5% District wise Benefited area (I.C.A. in ha) *Beed 28300 *Parbhani 58385 *Nanded 7200 *Total 93885Power generation
*F.R.L:431.80 m *M.W.L. (PRESENT): 434.80 m *T.B.L. :435.60 m *area of submergence: 7813 ha. *no. of villages affected due to submergence: 20Dimensions
Height *above river bed: 31.0 m *above the foundation: 35.60 m *RIVER BED : 405.4 m *Canal sill level : 424.70 m *Crest level :423.80 m *free board (present): 00.80 m QUANTITY: *earthwork: 5600 T.cum *masonry: 116 T.cum *concrete : 43 T.cum *total length :6488 m *earth dam : 6143.5 m *masonry dam : 344.5 mSpillway
*type : gated ogee spillway *inflow: 19718 cumecs *outflow: 14500 cumecs *length of spillway : 239 m *size of gate : 12 x 8 m *no.of gates : 16See also
*References
{{reflist Dams in Beed district Dams completed in 1987 1987 establishments in Maharashtra