HOME

TheInfoList



OR:

Line 1 is a north-south line of the
Shanghai Metro The Shanghai Metro (; Shanghainese: ''Zaon6he5 Di6thiq7'') is a rapid transit system in Shanghai, operating urban and suburban transit services to 14 of its 16 municipal districts and to Kunshan, Jiangsu Province. Served as a part of Shang ...
. It runs from in the north, via to in the south. The first line to open in the Shanghai Metro system, line 1 serves many important points in Shanghai, including and Xujiahui. Due to the large number of important locations served, this line is extremely busy, with a daily ridership of over 1,000,000 passengers. Generally, the line runs at grade beside the
Shanghai–Hangzhou railway The Shanghai–Hangzhou railway, also known as the Huhang railway (), is a double-track railroad in eastern China between Shanghai and Hangzhou in Zhejiang Province. Its name in Chinese, the Huhang Line, is named after the railway's two terminal ...
in the south, underground in the city center and elevated on the second deck of the North–South Elevated Road in the North. The line is colored red on system maps.


History

The required investment for the project was US$620 million (including domestic supporting RMB investment). In August 1988 and May 1989, the program of loans to the Federal Republic of Germany, France and the United States was approved by the State Planning Commission. * The Federal Government of Germany has a loan of 460 million marks, an annual interest rate of 0.75%, a committed rate of 0.25%, a repayment period of 30 years, and a grace period of 10 years. * French mixed loan of 132 million francs, of which 54% of government soft loans, annual interest rate of 2%, loan repayment period of 19 years, grace period of 11 years; export credit 46%, annual interest rate of 8.3%, loan repayment period of 10 years, grace period of 22 month. * The US loaned USD 23.18 million, of which 45% were government grants and 55% were commercial loans. The annual interest rate fluctuates, the loan repayment period is 10 years, and the grace period is 5 years. With the start of construction of the project, the cost has also increased. In August 1993, the budgetary estimate was adjusted to 3.974 billion yuan, of which domestic supporting funds increased by 1.086 billion yuan. In January 1995, the total budget was adjusted for the second time to 5.39 billion yuan, of which 3.961 billion yuan was domestic supporting funds. * May 28, 1993 - The first long section of the line, from Xujiahui to Shanghai South Railway Station (formerly known as Xinlonghua), opens. * April 10, 1995 - The entire long original line, from Shanghai Railway Station to Jinjiang Park, opens. * December 28, 1996 - Separate southern section from Jinjiang Park (formerly known as Hongmei Road South) to Xinzhuang opens. Northern extension continues to operate to Shanghai Railway Station. * July 1, 1997 - The northern and southern sections are connected, forming one complete line from Shanghai Railway Station - Xinzhuang. * December 28, 2004 - Line runs from Gongfu Xincun - Xinzhuang after northern extension opens. * December 29, 2007 - Second northern extension opens; full line runs from Fujin Road - Xinzhuang.


Stations


Service routes


Important stations

* - Connects the metro with the main railway station in the city, allowing rail transport to and from other provinces. '' Virtual Interchange'' with lines 3 and 4. * - This station serves a business and shopping area, and is also close to multiple tourist attractions making the station busy all day long. Interchange with lines 2 and 8. * - This is a business and commercial area, also with tourist attractions such as the Xujiahui Cathedral. Interchange with lines 9 and 11. * - This station is located at the sports stadium of the same name and the biggest regional and long distance bus station in the city. Interchange with line 4. * - This station serves the second railway station of the city, which accommodates trains serving cities mainly to the south. Interchange with lines 3 and 15. * - The southern terminus of line 1; interchange with line 5.


Future expansion


West extension of line 1

A 1.2 km extension to Humin road (North Xinzhuang Station) has been approved as part of the National Development and Reform Commission has approved the 2018-2023 construction planning of the city's Metro network. Work is expected to begin before 2023 and will take 4 years at acost of US$518. The extension will connect to the under construction Jiamin line.


South extension of line 1

There were plans to extend line 1 south to Jinshan to connect to Jinshan line. The route would include on line 5 and and on the Jinshan line.Picture of 2020 planned metro map for 2020
/ref>


North extension of line 1

There were plans to extend line 1 north to Chongming Island to connect Chengqiao town. The line would connect to the
Chongming line The Chongming line () is a rapid transit line on the Shanghai Metro that is part of the 2018–2023 Shanghai Metro plan. The Chongming line was previously treated as the last phase of Line 9, and was Line 19 until 2016, when it was renamed the ...
which would further extend east to connect with line 1. Currently, there is no plan to extend it northwards.


Headways


Technology


Signalling

As the first line in the system, Shanghai Metro was conceived and designed during 1980s, when fixed block signalling and
track circuit A track circuit is an electrical device used to prove the absence of a train on rail tracks to signallers and control relevant signals. An alternative to track circuits are axle counters. Principles and operation The basic principle behind ...
based train control (TBTC) was still considered a state-of-art approach to automatic train operation. The signalling system was designed by CASCO, a signalling manufacturer owned jointly by China Railway Signal & Communication Group Corporation (CRSC) and
General Railway Signal General Railway Signal Company (GRS) was an American manufacturing company located in the Rochester, New York area. GRS was focused on railway signaling equipment, systems and services. The company was established in 1904 and became part of Alsto ...
(GRS), and was largely based on the
system A system is a group of interacting or interrelated elements that act according to a set of rules to form a unified whole. A system, surrounded and influenced by its environment, is described by its boundaries, structure and purpose and express ...
designed by GRS for the
Washington Metro The Washington Metro (or simply Metro), formally the Metrorail,Google Books search/preview
. Coded audio-frequency (AF) track circuits are used for both train detection and transmission of speed commands, as well as limited train-to-wayside communication (TWC) for automatic train supervision (ATS). Train operation between stations and station stop can be automatic, while doors are controlled manually by train operators. From 2013 to 2019, the system was completely renewed, with obsolete components such as relay interlockings replaced by modern microprocessor-based ones, but the general operation of the signaling system remained unchanged. As of 2020, the original design is expected to serve two additional decades.


Rolling Stock

In the summer of 2006 after poor cooling effect of the 16 subway DC trains on Line 1 in summer and the high temperature of the carriages had long been a problem, 96 ice cubes have been put into a one-meter-high waste container to alleviate the high temperature of the 16 subway DC trains on Line 1. In order to make up for the defects in the refrigeration power and design of the 16 DC trains, emergency measures must be taken whenever the temperature reaches 33 °C or more. With the transformation between 2006 and 2008 from 6 carriages to 8 carriages the of the air-conditioning system was improvement, making the ice waste containers something of the past. The line was initially operated by trains built by the German Shanghai Metro Group which included Adtranz (now Bombardier) and Siemens together with AEG Westinghouse and Düwag.


Former Rolling Stock

File:106 entering Lianhua Road Station (20180211163310).jpg, 01A01 train File:111 entering Lianhua Road Station (20180101163416).jpg, 01A02 train File:120 exiting Xinzhuang (20180101161250).jpg, 01A03 train File:128 exiting Xinzhuang (20180101161750).jpg, 01A04 train File:0152 leaving Lianhua Road Station (20180211155205).jpg, 01A05 train File:0159 entering Lianhua Road Station (20180211163424).jpg, 01A06 train


References

{{DEFAULTSORT:Shanghai Metro, Line 1 Shanghai Metro lines Railway lines opened in 1993 1993 establishments in China