The Light Rail Transit Line 1, commonly referred to as LRT Line 1 or LRT-1, is a light rapid transit system line in Metro Manila, Philippines, operated by Light Rail Manila Corporation (LRMC) and owned by the Light Rail Transit Authority (LRTA) as part of the Manila Light Rail Transit System. Originally referred to as Metrorail and the Yellow Line, LRT Line 1 was reclassified to be the Green Line in 2012. It travels in a general north–south direction from to , and then east–west from Monumento to . Currently, the line consists of 20 stations and runs on of fully elevated route. Although it has the characteristics of light rail, such as with the type of rolling stock used, it is more akin to a rapid transit system owing to its total grade separation and high passenger throughput. A 1977 study conducted by Freeman Fox and Associates suggested a street-level railway in Manila but the government revised this recommendation to an elevated system. In 1980, President Ferdinand Marcos created the LRTA and construction of the line began the following year. With the opening of its first segment in 1984, it became the first rapid transit service in Southeast Asia. From 2016 to 2020, the line was the busiest among Metro Manila's three rapid transit lines. It became the busiest when the MRT Line 3, which was the busiest line prior to 2014, experienced daily incidents and breakdowns attributed to poor maintenance, causing a decline in ridership. Serving an average ridership of 124,940 passengers daily in 2021, the LRT Line 1 became the second busiest among the three lines after the MRT Line 3 regained its position as the busiest line in the metro due to the increase in ridership after a comprehensive rehabilitation. The line is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses and jeepneys, to and from a station to reach their intended destination. Although the line aimed to reduce traffic congestion and travel times in Metro Manila, the transportation system has only been partially successful due to the rising number of motor vehicles and rapid urbanization. Expanding the network's revenue line to accommodate more passengers is set on tackling this problem. Future plans include an eight-station southbound extension into the province of Cavite by 2027 (with partial operations by late 2024 or early 2025) and an eventual extension to the North Triangle Common Station which will provide additional connections to MRT Line 3, MRT Line 7 and the Metro Manila Subway.


Route

The line is predominantly aligned to the path of Taft Avenue (
Radial Road 2 Radial Road 2 (R-2), informally known as the R-2 Road, is a network of roads and bridges that all together form the second arterial road of Metro Manila in the Philippines. Spanning some , it connects the cities and municipalities of Bacoor, Dasm ...
) which was chosen largely due to its straight course. Later on, as Taft Avenue ends, it shifts to Rizal Avenue and Rizal Avenue Extension ( Radial Road 9) then turning right on
EDSA Epifanio de los Santos Avenue, commonly referred to by its acronym EDSA, is a limited-access circumferential highway around Manila, the capital city of the Philippines. It passes through 6 of Metro Manila's 17 local government units or cities, ...
before ending at the corner of North and West Avenues and
EDSA Epifanio de los Santos Avenue, commonly referred to by its acronym EDSA, is a limited-access circumferential highway around Manila, the capital city of the Philippines. It passes through 6 of Metro Manila's 17 local government units or cities, ...
. The line links the cities of Quezon City, Caloocan,
Manila Manila ( , ; fil, Maynila, ), officially the City of Manila ( fil, Lungsod ng Maynila, ), is the capital of the Philippines, and its second-most populous city. It is highly urbanized and, as of 2019, was the world's most densely populated ...
, Pasay, and Parañaque.


Stations

The line serves 20 stations along its route. A twenty-first station is yet to be constructed. Eight stations which are part of the south extension are also set to be constructed south of Baclaran. station in Caloocan was previously proposed during the construction of the northern extension located between and , becoming a bargaining object during the entire extension line's construction in the jurisdiction of Caloocan. However, the planned Malvar station was completely shelved by the Aquino administration. Three stations serve as connecting stations between other lines in the metro. is indirectly connected to the of the LRT Line 2 through a covered walkway; is immediately above its PNR Metro Commuter Line counterpart; and is connected to the station via a covered walkway. No stations are connected to other rapid transit lines within the paid areas, though that is set to change when the North Triangle Common Station, which has interchanges to MRT Line 3 and MRT Line 7, opens in 2023.


Operations and services

The line operates from 4:30 a.m. PST ( UTC+8) until 10:15 p.m. on weekdays, and 4:30 a.m. until 9:45 p.m on weekends and holidays. It operates almost every day of the year unless otherwise announced. Special schedules are announced via the PA system in every station and also in newspapers and other mass media. During Holy Week, a public holiday in the Philippines, the rail line is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes after Easter Sunday. During the Christmas and year-end holidays, the operating hours of the line are shortened due to the low ridership of the line during the holidays.


History


Planning and funding

The 1977 Metro Manila Transport, Land Use and Development Planning Project (MMETROPLAN), a fourteen-month study conducted by Freeman Fox and Associates and funded by the World Bank, recommended the construction of a street-level light rail line in Manila. Following a review by the Ministry of Transportation and Communications, later the Department of Transportation (DOTr), the proposal was revised to an elevated railway in order to avoid building over the city's many intersections, while the option of constructing the line underground was also rejected due to the high water table in Manila. This raised the project's cost from ₱1.5 billion to ₱2 billion. An alignment along Rizal and Taft avenues, which spanned from Monumento, Caloocan in the north to Baclaran, Pasay in the south, was selected because it followed a relatively straight path for most of its route. On July 12, 1980, President Ferdinand Marcos created the Light Rail Transit Authority (LRTA) and assigned First Lady and Governor of Metro Manila Imelda Marcos as its chairman. While the LRTA confined its roles to policy making, fare regulation, and future planning, the line's operations were assigned to Metro, Inc., a sister company of Meralco. The line came to be referred to as Metrorail. The Belgian Government granted a ₱300 million soft and interest-free loan for the project's construction, with a repayment period of 30 years. Additional funding was later sourced from a ₱700 million loan, provided by a Belgian consortium consisting of ACEC, La Brugeoise et Nivelles, Tractionnel Engineering International, and Transurb Consult. The consortium also supplied the line's first light rail vehicles, power control, signalling, and telecommunications, as well as provided training and technical assistance. Designed as a public utility rather than a
profit center A profit center is a part of a business which is expected to make an identifiable contribution to the organization's profits. Overview A profit center is a section of a company treated as a separate business. Thus profits or losses for a pro ...
, the line was expected to incur a deficit through 1993, but complete its repayments within a period of 20 years.


Construction

The government-owned Construction Development Corporation of the Philippines was the project's sole contractor. Single column cast-in-place concrete piers carrying
precast concrete Precast concrete is a construction product produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and maneuvered into place; examples include precast b ...
T-girders and a concrete deck slab were used for the original line from Monumento to Baclaran. The columns are spaced apart by rising from a cap on top of bored or driven concrete piles. Four of the wide girders are side by side in each span to accommodate bidirectional standard-gauge railway tracks located above the street level. Driven piles were originally used for 80 percent of the project, with spread footings being used for the remaining portion. However, during construction, it was determined that bored piles should be utilized in some areas to mitigate noise and avoid potential damage to nearby buildings. Additionally, the original use of stockpiled precast piles caused clutter on the streets during construction. In 1981, an economic recession and the government's inability to provide counterpart funds for civil works and right-of-way acquisition, which amounted to 60 percent of the project's total cost, led to a delay in construction. Work finally began in September of that year along Taft Avenue, between
Epifanio de los Santos Avenue Epifanio de los Santos Avenue, commonly referred to by its acronym EDSA, is a limited-access circumferential highway around Manila, the capital city of the Philippines. It passes through 6 of Metro Manila's 17 local government units or cities, ...
(EDSA) and Libertad Street. In order to make way for Carriedo station and a segment of tracks approaching the Pasig River, a department store and a classroom building owned by FEATI University were demolished.


Opening

The southern section, between the Baclaran to United Nations stations, was inaugurated on September 11, 1984, and commercial operation along this section commenced on December 1. The line became fully operational on May 12, 1985, when the northern section between Central Terminal and Monumento opened. During the first several years, two-car trains that could accommodate up to 748 passengers were utilized. This amounted to a capacity of 20,000 passengers per direction.


Capacity expansions


First phase

During the 1990s, the Line 1 reached its capacity due to traffic congestion and air pollution. In 1990, the Line 1 fell so far into disrepair due to premature wear and tear that trains headed to Central Terminal station had to slow to a crawl to avoid further damage to the support beams below as cracks reportedly began to appear. The premature aging of Line 1 led to an extensive refurbishing and structural capacity expansion program with a help of Japan's official development assistance. The capacity expansion project was one of the flagship projects of the administration of President Fidel V. Ramos. A loan agreement for the first phase of the capacity expansion project was signed in 1994. In August 1996, a consortium of Marubeni Corporation, Adtranz, and ABB was awarded the contract and was signed the following September. The project, undertaken at a cost of , involves the procurement of seven four-car trains that were ordered from Hyundai Precision, and the refurbishment and conversion of the original two-car trains into three-car trains in 1999. In line with the introduction of the four-car trains, the station platforms were also extended. The project was completed in 2002. During the first phase of the capacity expansion, a labor strike was launched by employees of Meralco Transit Organization (METRO, Inc.) in July 2000 as their operations and maintenance contract was about to expire. It paralyzed the operations of the line for a week. The Light Rail Transit Authority decided not to renew its contract with METRO, Inc. that expired on July 31, 2000, and the former assumed operational responsibility.


Second phase

Another capacity expansion project was initiated in April 2000 during the administration of President Joseph Estrada due to the high demand of passengers in line with the completion of the MRT Line 3 (and eventually, LRT Line 2). Funded through an ₱8.893-billion loan from the Japan Bank for International Cooperation, the second phase of the capacity expansion project is divided into two packages. Package A involves the procurement of twelve four-car trains, upgrades to the signalling and communications equipment, and upgrades to the stations and depot. Package B, on the other hand, involves the procurement and installation of air conditioning units for the 1000 class trains, replacement of faulty air conditioning units of the 1100 class trains, renovation of of railway track and railway sleepers, and procurement of equipment and spare parts used for track works. The installation of equipment for the automatic fare collection system was also included in the capacity expansion project.


North extension

With the completion of the first phase of the MRT Line 3 in 1999, there were plans to extend Line 3 towards station (Phase 2) to create a seamless rail loop around Metro Manila. However, the extension was shelved by then-President Gloria Macapagal Arroyo in favor of a extension of the LRT-1 to the
MRT-3 , locale = Metro Manila, Philippines , start = , end = , type = Light rapid transit , system = Manila Metro ...
station. The project involved the construction of three stations: , , and a common station at North Avenue. However, due to disputes in the common station's location, the station would only begin construction on September 29, 2017. The extension was part of the MRT-LRT Closing the Loop project under the Arroyo administration. In September 2008, during construction, station was proposed and was met with controversies between the Caloocan local government, the general public, and the Light Rail Transit Authority. The station was approved in July 2009. Though it was reported that the feasibility study for the station was completed, construction has yet to start. The project was originally divided into three packages. Package A covered the construction of the viaduct while Package B covered the construction of the stations. Package C would cover the electro-mechanical systems in which includes the power supply, signalling and telecommunication systems, and railway track works. Several modifications were made in Packages A and C. Package A would be divided into two packages: Package A1, which covers the construction of the viaduct from Monumento to Balintawak, while Package A2 covered the construction of the viaduct from Balintawak to North Avenue. The joint venture of First Balfour and DMCI was awarded the contract for the viaduct and stations for the north extension project. Package C, on the other hand, would cover the power supply system,
overhead catenary An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, trolleybuses or trams. It is known variously as: * Overhead catenary * Overhead contact system (OCS) * Overhead equipm ...
system, and station equipment. Package C was awarded to the joint venture of Miescor and GTC. Its sub-components, the signalling system, telecommunication systems, fare systems, and railway track works were contracted as four separate contracts. The signalling contract was awarded to the joint venture of DMCI, Beta Electric, and Tewet. The communications contract, on the other hand, was awarded to the Philippine subsidiary of Alcatel-Lucent. The fare systems contract was awarded to AP Trans SA, and the track works contract was awarded to the joint venture of Daxi and Frateur-De Pourcq. The project was intended to integrate the LRT Line 1 and MRT Line 3 operations. Structure gauge tests were conducted in the extension by February 2010. The project's consultant, MetroLink Joint Venture, found that the LRT Line 1 trains can run on MRT Line 3 tracks. On February 25, 2010, as part of the 24th anniversary of the People Power Revolution, President Gloria Macapagal Arroyo and Vice President Noli de Castro rode an MRT-3 train from to before transferring to an LRT-1 train that passed along the extension until station. Balintawak station opened on March 22, 2010, while Roosevelt station opened seven months later, on October 22. The Tewet Group of
Germany Germany,, officially the Federal Republic of Germany, is a country in Central Europe. It is the second most populous country in Europe after Russia, and the most populous member state of the European Union. Germany is situated betwee ...
, together with its signalling partner BBR Verkehrstechnik, conducted the signalling integration of the original line and north extension. Integration works were completed in May 2011, while the integration works passed inspection tests by TÜV Rheinland in June 2011. To integrate the operations of the LRT Line 1 and MRT Line 3, the then-
Department of Transportation and Communications The Department of Transportation (DOTr; fil, Kagawaran ng Transportasyon) is the executive department of the Philippine government responsible for the maintenance and expansion of viable, efficient, and dependable transportation systems as effe ...
, under Secretary
Jose de Jesus Jose de Jesus is a former Philippine Secretary of the Department of Transportation and Communications.
, launched an auction for a temporary five-year operations and maintenance contract for the two lines. The bidding was set by July 2011. Over 21 companies from around the world expressed interest to bid which included
Metro Pacific Investments Metro Pacific Investments Corporation (MPIC) is a Philippine-based unit investment holding company of First Pacific Company Limited through Metro Pacific Holdings, Inc. MPIC through its subsidiaries, provides water, sanitation, and sewerage se ...
, Sumitomo Corporation, Siemens, DMCI Holdings,
San Miguel Corporation San Miguel Corporation, abbreviated as SMC, is a Philippine multinational conglomerate headquartered in Mandaluyong, Metro Manila. The company is one of the largest and most diversified conglomerates in the Philippines. Originally founded ...
, and others. After de Jesus resigned from the DOTC, his successor, Mar Roxas, halted the auction process and was later shelved.


Privatization

A plan to privatize the line was pursued as part of the south extension project. The bidding was set for August 2013, but failed. The project was rebidded, and on September 12, 2014, the operation and maintenance of LRT Line 1 and the construction of a extension project to Bacoor, Cavite was awarded to the Light Rail Manila Corporation (LRMC), a joint venture company of Metro Pacific's Metro Pacific Light Rail Corporation (MPLRC), Ayala Corporation's AC Infrastructure Holdings Corporation (AC Infra), and the Philippine Investment Alliance for Infrastructure's Macquarie Infrastructure Holdings (Philippines) PTE Ltd. (MIHPL) (with Sumitomo Corporation following in May 2020). The consortium signed a concession agreement with the DOTr and LRTA on October 2, 2014. LRMC contracted the operation and maintenance of the line for 20 years to
RATP Dev RATP may refer to: Transportation: * RATP Group, or ', a public transport operator based in Paris, France * RATP Iași (), a transit operator responsible for public transportation in Iași, Romania * RATP Ploiești (), a transit operator respons ...
under its subsidiary
RATP Dev Transdev Asia RATP Dev Asia is a subsidiary of RATP Dev that operates public transport services in Asia. It was previously the RATP Dev Transdev Asia (RDTA), a 50/50 joint venture owned by RATP Dev and Transdev until October 2020. It was originally Veolia T ...
, a joint venture between Transdev and RATP Dev on December 8, 2014. The 32-year concession started on September 12, 2015.


Rehabilitation

A rail replacement program commenced in 2016, as a continuation of the previous rail replacement program completed by the Light Rail Transit Authority. LRMC signed a contract with First Balfour for the structural restoration project of Line 1 on April 19, 2017, and in November 2018, LRMC tapped First Balfour and MRail, a subsidiary of Meralco for the rehabilitation of rectifier substations. LRMC has also rehabilitated the first and second-generation trains to add more trains servicing the line.


Station facilities, amenities, and services

All stations in Line 1 are elevated, with the exception of Zapote station.


Station layout and accessibility

Most stations are composed of only one level, accessible from the street below by stairway, containing the station's concourse and platform areas separated by fare gates. Some stations tend to have a concourse level below the platforms. The single-level stations of Line 1, however, was not built with accessibility in mind, due to the lack of barrier-free facilities such as escalators and elevators. Some stations, such as and , are connected at concourse level to nearby buildings, such as shopping malls, for easier accessibility. Some trains have spaces for passengers using wheelchairs. As of November 8, 2009,
folding bicycle A folding bicycle is a bicycle designed to fold into a compact form, facilitating transport and storage. When folded, the bikes can be more easily carried into buildings, on public transportation (facilitating mixed-mode commuting and bicycl ...
s are allowed to be brought into trains provided that it does not exceed the LRTA's baggage size limitations of . The last car of each train are also designated as "green zones", where folding bicycle users can ride with their bikes. All stations have side platforms except for Baclaran, which has one side and one island platform. Due to the high patronage of the line, part of the platform corresponding to the front car of the train is cordoned off for the use of women, children, elderly and disabled passengers.


Shops and services

Inside the concourse of some stations are stalls or shops where people can buy food or drinks. Stalls vary by station, and some have fast food stalls. The number of stalls also varies by station, and some stations tend to have a wide variety. Stations such as Monumento and Baclaran are connected to or are near shopping malls and/or other large shopping areas, where commuters are offered more shopping varieties.


Safety and security

The line has always presented itself as a safe system to travel in, which was affirmed in a 2004 World Bank paper prepared by Halcrow describing the overall state of metro rail transit operations in Manila as being "good". For safety and security reasons, persons who are visibly intoxicated, insane and/or under the influence of
controlled substances A controlled substance is generally a drug or chemical whose manufacture, possession and use is regulated by a government, such as illicitly used drugs or prescription medications that are designated by law. Some treaties, notably the Si ...
, persons carrying flammable materials and/or explosives, persons carrying bulky objects or items over tall and/or wide, and persons bringing pets and/or other
animal Animals are multicellular, eukaryotic organisms in the biological kingdom Animalia. With few exceptions, animals consume organic material, breathe oxygen, are able to move, can reproduce sexually, and go through an ontogenetic stage ...
s are prohibited from entering the line. Products in tin cans are also prohibited, citing the possibility of home-made bombs being concealed inside the cans. In response to the
Rizal Day bombings The Rizal Day bombings, also referred to as the December 30 bombings, were a series of bombings that occurred around Metro Manila in the Philippines on December 30, 2000. The explosions occurred within a span of a few hours, killing 22 people a ...
and the September 11 attacks, security has been stepped up on board. The Philippine National Police has a special police force, and security police provided by private companies can be found in all stations. All stations have a head guard. Some stations may also have a deployed K9 bomb-sniffing dog. The line also employs the use of closed-circuit television inside all stations to monitor suspicious activities and to assure safety and security aboard the line.


COVID-19 measures

As a response to the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
, the system operated at a limited capacity when public transport operations resumed on June 1, 2020 after a three-month lockdown that halted the operations of public transport. The use of face masks (and later, face shields) became mandatory since the resumption of operations in June 2020. The use of face shields later became no longer mandatory in public transport in November 2021, except when an area is under the two highest levels of the alert level system. Social distancing measures were also implemented. Since March 1, 2022, all railway lines are operating at a full capacity due to the de-escalation of Metro Manila to the lowest of the five levels of the alert level system. In addition, talking with other passengers and answering phone calls in trains has been prohibited in the system. The policy has also been implemented in all railway lines and forms of public transport. The trains are regularly being disinfected when the train arrives at a terminus. It takes three to five minutes for a train to be disinfected. In addition, trains are installed with UVC disinfection and
HEPA filter HEPA (, high-efficiency particulate air) filter, also known as high-efficiency particulate absorbing filter and high-efficiency particulate arrestance filter, is an efficiency standard of air filters. Filters meeting the HEPA standard must sa ...
systems in air-conditioning units to remove pathogens and keep indoor air clean.


Ridership

The current designed daily ridership of the line is 560,000 passengers and currently aims to increase the number of passengers being served on the line to more than 800,000 passengers, as the line's south extension is set to be fully operational by 2027. On January 9, 2012, the line served a record 620,987 passengers during the Feast of the Black Nazarene ( station is near to the
Quiapo Church The Minor Basilica of the Black Nazarene ( es, Basílica Menor del Nazareno Negro; fil, Basílika Menor ng Itím na Nazareno), known canonically as the Parish of Saint John the Baptist and also known as Quiapo Church ( es, Iglesia Parroquial d ...
), and since the day falls on a working weekday. In 2018, the line carried 300,000 to 500,000 passengers daily, due to the increased number of trains, from 86 vehicles to 113 vehicles available for daily trips. This gradually reduces the waiting time of passengers from 5 minutes to as much as 2–3.5 minutes. It also carried as much as 14.63 million passengers monthly in 2018.


Fares and ticketing

The line, like all existing lines in Metro Manila, uses a distance-based fare structure, with fares ranging from fifteen to thirty pesos (34 to 60 U.S. cents), depending on the destination. Commuters who ride the line are charged ₱15 for the first five stations, ₱20 for 6–11 stations, and ₱30 for 12–19 stations or the entire line.


Types of tickets

Before 2001, tokens were used for the fare system of Line 1. Subsequent upgrades in the fare collection system eventually transitioned the line from a token-based system to a ticket-based system, with full conversion to a ticket-based system achieved on September 9, 2001.


Magnetic tickets (2001–2015)

Two types of magnetic tickets exist: a single-journey (one-way) ticket whose cost is dependent on the destination, and a stored-value (multiple-use) ticket for 100 pesos. During the Arroyo administration, all magnetic tickets bore the portrait of then-President Gloria Macapagal Arroyo. The single-journey tickets had two types: a ticket that can be used for the first four stations and sold at ₱12, and another that is accepted in all stations and sold at ₱15. Single-journey tickets are valid on the day of purchase. On the other hand, stored value tickets were sold from ₱60 to ₱100. A special ticket for senior citizens and
persons with disabilities Disability is the experience of any condition that makes it more difficult for a person to do certain activities or have equitable access within a given society. Disabilities may be cognitive, developmental, intellectual, mental, physical, se ...
were sold at ₱96. The SVTs are valid for six months after the date of first use.


Beep cards (2015–present)

A unified ticket system was introduced in 2015 to replace the magnetic tickets. The
Beep The Blocks Extensible Exchange Protocol (BEEP) is a framework for creating network application protocols. BEEP includes building blocks like framing, pipelining, multiplexing, reporting and authentication for connection and message-oriented pee ...
is a new contactless smart card to replace the old magnetic tickets. Similar to the previous magnetic tickets, the Beep cards have two types: single-journey tickets and stored value cards. The tickets can be bought at any stations or at the
ticket vending machines A ticket machine, also known as a ticket vending machine (TVM), is a vending machine that produces paper or electronic tickets, or recharges a stored-value card or smart card or the user's mobile wallet, typically on a smartphone. For instance, ...
. A trial run for the Beep cards started on August 16, 2015 for southbound trips along the line. Full implementation of the use of the Beep cards started on September 20, 2015 after the system was rolled out in the northbound direction, and was however met with problems with the cards at Gil Puyat station, causing complaints from commuters. A shortage of the stored value cards was reported in 2022 due to the ongoing global chip shortage caused by the Russian invasion of Ukraine.


Planned QR ticketing system

On November 11, 2021, the Light Rail Manila Corporation and AF Payments, Inc. presented a QR code-based ticketing system to the Department of Transportation and the Light Rail Transit Authority. Once approved, it can serve as viable alternatives to single journey tickets and can be purchased via mobile apps. Implementation of this ticket system is slated for 2022.


Fare adjustment

Adjusting passenger fares has been employed by the DOTC (predecessor of DOTr) and LRTA as a means to boost flagging ridership figures, and the issue of fares both historically and in the present continues to be a political issue. Current fare levels were set on January 4, 2015, as a consequence of DOTr (formerly DOTC) having to increase fares for the line as per their concession agreement with the Light Rail Manila Corporation, with fare hikes delayed for several years despite inflation and rising operating costs. Prior to the current fares levels, fares were set on December 15, 2003, with the exception of a 5-peso fare increase in line of the opening of the north extension in 2010. These lower fares—which are only slightly more expensive than jeepney fares—ended up being financed through large government subsidies amounting to around ₱25 per passenger, and which for both the MRT ''and'' LRT reached ₱75 billion for the 10-year period between 2004 and 2014. Without subsidies, the cost of a single trip is estimated at around ₱40, and a ₱10 increase in fares would yield additional monthly revenues of ₱2–3 billion a month. As stated in the 2014 concession agreement, fare adjustments are allowed every two years. Fare hikes were planned in 2016, 2018, and 2020, but was deferred. A fare hike was planned again in April 2022, but LRTA said in November 2022 that the fares for the line will not be adjusted.


Rolling stock

The line at various stages in its history has used different configurations of two-car, three-car, and four-car trainsets. The two-car trains are the original first-generation BN and ACEC trains (railway cars numbered from 1000). Most were transformed into three-car trains, although some two-car trains remain in service. The four-car trains are the more modern second-generation Hyundai Precision / Adtranz ( 1100) and third-generation Kinki Sharyo / Nippon Sharyo ( 1200) trains. There are 139 railway cars grouped into 40 trains serving the line: 63 of these are first-generation cars, 28 second-generation, and 48 third-generation. One train car (1037) was severely damaged in the
Rizal Day bombings The Rizal Day bombings, also referred to as the December 30 bombings, were a series of bombings that occurred around Metro Manila in the Philippines on December 30, 2000. The explosions occurred within a span of a few hours, killing 22 people a ...
in 2000 and was subsequently decommissioned. The maximum design speed of these cars ranges between , but only run at a maximum operational speed of . Until 2011, all trains ran at the maximum speed until it was downgraded to due to the deteriorating condition of the railway tracks, except for the north extension which continued running on the maximum speed. After a three-year rail replacement program, LRMC received a safety certification in March 2021 and the current speed was implemented on April 5, 2021. The line's fleet is being modernized to cope with increasing numbers of passengers. In the initial phase of its capacity expansion program completed in 1999, the line's seven four-car second-generation trains were commissioned providing an increased train capacity of 1,358 passengers while the original two-car trains capable of holding 748 passengers were transformed into three-car trains with room for 1,122. The acquisition marked the introduction of the first air-conditioned trains to the line. Earlier rolling stock was notorious for its lack of air conditioning, relying instead on forced-air roof ventilation for cooling. This however resulted in hot and stuffy rides. The problem was addressed more fully after a preparatory rehabilitation program completed in 2001 allowed the installation of air conditioners to the older rolling stock. By June 2004, all trains were installed with air conditioning. As part of the second phase of expansion, twelve new trains made in Japan by Kinki Sharyo and Nippon Sharyo were purchased in 2005 and were introduced in December 2006, providing a capacity of 1,388 passengers. The new air-conditioned trains have boosted the capacity of the line from 27,000 to 40,000 passengers per hour per direction. From 2016 to 2017, the original trains underwent a body repaint and repair to address body issues and put it at par with its newer trains in terms of aesthetics. The idle and bogged down second-generation trains, reduced to two running sets, have been a subject of an extensive rehabilitation program that was launched in 2018. The rehabilitation resulted in revived second generation units with modernized electronics, new traction controllers and motors. Three of the coaches in the third-generation trains that are currently out of service are from the two trainsets that figured in two separate collisions in 2010 and 2011. LRMC has also built an in-house laboratory for production, manufacturing, fabrication and repair of train parts that are no longer available in the market. Production of new rolling stock is awarded to Mitsubishi Corporation as the implementing contractor and Construcciones y Auxiliar de Ferrocarriles as the manufacturer, funded by the Japan International Cooperation Agency and valued at ¥30 billion for 120 cars configurable to 30 train sets, in order to service more passengers in preparation for the opening of the south extension. The trains are slated be delivered from 2021 to 2022. The first trainset was delivered in January 2021 and deliveries are expected to be completed by June 2022. The Passenger Assist Railway Display System, a passenger information system powered by LCD screens installed near the ceiling of the train that shows news, advertisements, current train location, arrivals and station layouts, are already installed in the third-generation trains, along with the trains of Line 2 and the first-generation trains of Line 3.


Depot

The line maintains an at-grade depot in Baclaran, Pasay. It serves as the center of the operations and maintenance of the line. It is connected to the mainline through a spur line. Before its expansion, the depot had a capacity of 145 light rail vehicles and an area of . It was expanded to an area of to accommodate 197 vehicles, with
Shimizu Corporation is an architectural, civil engineering and general contracting firm. It has annual sales of approximately US$15 billion and has been widely recognized as one of the top 5 contractors in Japan and among the top 20 in the world. It is a family bus ...
and First Balfour implementing the project. Expansion works were completed after the depot was inaugurated on February 23, 2022. A satellite depot is being constructed in Zapote as part of the line’s south extension project. When completed, the satellite depot will handle 72 light rail vehicles.


Other infrastructure


Signalling

Throughout its history, the line used different
signalling systems Railway signalling (), also called railroad signaling (), is a system used to control the movement of railway traffic. Trains move on fixed rails, making them uniquely susceptible to collision. This susceptibility is exacerbated by the enormo ...
. The line currently uses the Alstom Atlas 100 solution based on ETCS Level 1. The original signalling system used in the LRT Line 1 was based on fixed block and relay type trackside systems. Trains had an automatic train stop system that activates if the train passes by a red signal or over-speeding. Based on a procurement plan published by the Light Rail Transit Authority, most of the signalling equipment, including
track circuit A track circuit is an electrical device used to prove the absence of a train on rail tracks to signallers and control relevant signals. An alternative to track circuits are axle counters. Principles and operation The basic principle behind ...
s, were supplied by ACEC. In 2007, as part of a capacity expansion project, the signalling system was replaced with a signalling and train control system based on automatic train protection (ATP) and automatic train supervision (ATS) using Siemens technology. The ATP system monitors the speed of the trains, while the ATS system directs train operations. Prior to the 2022 upgrade, the signalling system was designed to operate at a headway of 112 seconds. Aside from the ATP and ATS systems, its subsystems include train detection through axle counters, and microprocessor-based interlocking. The signalling system was again upgraded as part of the line's south extension. Alstom was awarded a contract in February 2016 to supply the signalling and communications systems for the line. Alstom supplied the Atlas 100 solution based on ETCS Level 1. The testing and commissioning phase of the upgraded signalling system started in November 2021 and was completed on February 1, 2022.


Tracks

The tracks have two types: ballasted and slab tracks. Ballasted sections are found in the original section from to , while slab tracks are found in the north extension. The tracks are supported by twin-block concrete railroad ties, and have a track center distance of . The tracks in the original line consist of rails designed to the EB 50T rail profile, while the tracks in the future extension line consist of rails designed to the UIC 54 rail profile. Due to the deterioration of the rail tracks in the original line, speed restrictions were implemented in 2011 except for the north extension. In 2012, a contract to replace of rails was awarded to the joint venture of Oriental and Motolite Marketing Corporation, Korail, Erin-Marty Fabricators Company, Inc., and Jorgman Construction and Development Corporation. However, there were delays in the project implementation until February 2014, when the then-
Department of Transportation and Communications The Department of Transportation (DOTr; fil, Kagawaran ng Transportasyon) is the executive department of the Philippine government responsible for the maintenance and expansion of viable, efficient, and dependable transportation systems as effe ...
issued a notice to proceed for the joint venture. The first phase of the replacement started in 2014, while the rails at Monumento station were replaced in March 2015. The first phase of the rail replacement was completed in December 2015. The second and final phase of replacement works commenced in August 2016 by the Light Rail Manila Corporation, which contracted Joratech to replace of rails and was completed in 2017. This was intended to increase the operating speed from to and was achieved on April 5, 2021.


Extensions


South extension

An extension of LRT Line 1 to the south, known as the South Extension Project or the Cavite Extension Project, is under construction and will serve the areas of Parañaque to Cavite. The extension will span from the Quirino Avenue,
Harrison Avenue Francis Burton Harrison Avenue, more commonly known as F.B. Harrison Avenue or simply Harrison Avenue (formerly F.B. Harrison Street or Harrison Street), is a major north-south collector road in Pasay, western Metro Manila, Philippines. It is a fo ...
, and Taft Avenue Extension intersection, then would travel down from Redemptorist Road to Coastal Road, and will traverse through the
Parañaque River The Parañaque River ( tl, Ilog ng Parañaque), also known as Tambo River, is a river in Metro Manila in the Philippines. It is located south of Manila passing through Pasay and Parañaque located near Ninoy Aquino International Airport. The river ...
and will enter
Ninoy Aquino Avenue Ninoy Aquino Avenue is a north–south collector road that links Pasay and Parañaque in southern Metro Manila, Philippines.
until reaching and traversing the C5 Extension Road; and will once again enter Coastal Road, crossing the Las Piñas-Bacoor Boundary Bridge along the Zapote River, and traverse through the Alabang–Zapote Road and Aguinaldo Highway intersection, until reaching the Niog station located along the Molino Boulevard at Bacoor, Cavite. The extension project would add 8 stations covering of new elevated railway sections and would be the third rail line extending outside the Metro Manila area (after the east extension of Line 2 and the construction of Line 7). The project is divided in two phases - Phase 1 covers five stations from Redemptorist to Dr. Santos, while Phase 2 covers the remaining three stations from Las Piñas to Niog. The project was first approved by the National Economic and Development Authority in 2000, while the Implementing Agreement for the project was approved in 2002, to be undertaken by SNC-Lavalin as a public-private partnership project. The proposal however was subsequently terminated in 2006. In the same year, the government worked with advisers ( International Finance Corporation, White & Case, Halcrow and others) to conduct an open-market invitation to tender for the extension and for a 40-year concession to run the extended line. However, the project was shelved months before Gloria Macapagal Arroyo would end her term as President. The plans for the southern extension project were restarted as early as 2012 and was expected to begin construction in 2014 but was delayed due to right of way issues. The issues were resolved in 2016 and on May 4, 2017, the groundbreaking for the ₱64.915 billion ($1.36 billion) South Extension Project was held, with the assistance of the Light Rail Manila Corporation and the Japan International Cooperation Agency. The extension project also features the construction of three intermodal facilities, one satellite depot located at Zapote, and mass upgrades to the existing Baclaran depot. The project is expected to cater more than 800,000 passengers daily once completed, with the DOTr secretary
Arthur Tugade Arthur "Art" Planta Tugade (born January 9, 1946) is a Filipino businessman and lawyer from Cagayan who served as the Secretary of the Department of Transportation under the Duterte administration from 2016 to 2022. He previously held the pos ...
projecting the early completion of the project to be within 2020. The line would be extended from Parañaque southwards, connecting Las Piñas and Bacoor to the Mega Manila railway network. Civil works on the extension began on May 7, 2019 after the right-of-way acquisitions were cleared. The construction of the extension line will be built using a full span launching method, renowned as one of the fastest methods of construction for bridges and elevated viaducts that cuts time and total land space needed for construction. A total of 203 pi-girders were used for the construction of the extension's first phase, the last of which was laid down along Redemptorist Road, Baclaran on February 7, 2022. The LRMC partnered with Bouygues Construction for the civil works, Alstom for the installation of the signalling and communication systems, and the
RATP Dev Transdev Asia RATP Dev Asia is a subsidiary of RATP Dev that operates public transport services in Asia. It was previously the RATP Dev Transdev Asia (RDTA), a 50/50 joint venture owned by RATP Dev and Transdev until October 2020. It was originally Veolia T ...
for the overall engineering, procurement, consultation, construction and assistance services for the project. The extension project will also serve as the first railway line to use the new construction method. The LRT Line 1 South Extension Project will consist of the following eight stations: * RedemptoristParañaque * Manila International Airport – Parañaque *
Asia World Asia World Group ( my, အာရှဓန ကုမ္ပဏီ) is a Burmese conglomerate. It is Myanmar's largest and most diversified conglomerate, with interests in industrial development, construction, transportation, import-export, and a l ...
– Parañaque * Ninoy Aquino – Parañaque * Dr. Santos – Parañaque * Las Piñas – Las Piñas *
Zapote Zapote the fifth district of the San José canton, in the San José province of Costa Rica. It is one of the administrative units surrounding San José downtown (officially composed of the districts of El Carmen, Merced, Hospital and Catedra ...
– along the boundaries of Bacoor and Las Piñas * Niog – Bacoor Plans were also laid out to include 2 additional stations for the extension project: * Manuyo Uno station - Las Piñas * Talaba station - Bacoor , the project is 75.3% complete. Phase 1 of the extension (from
Redemptorist station Redemptorist station is an under-construction Manila Light Rail Transit (LRT) station situated on Line 1. It is part of the Line 1 South Extension Project. The station would be the northernmost of the extension. It would be the twenty-second sta ...
to Dr. Santos station) is slated to be operational by September 2024, with full operations by 2027.


Second north extension

The original north extension until station will be extended to the under-construction North Triangle Common Station. The project site of the common station was disputed for years until an agreement with the stakeholders was signed in January 2017. Construction of the station began on September 29, 2017 and is planned to open in 2022.


Incidents and accidents


Rizal Day bombings

On December 30, 2000, during the
Rizal Day Rizal Day (, ; ) is a Philippine national holiday commemorating life and works of José Rizal, a national hero of the Philippines. It is celebrated every December 30, the anniversary of Rizal's 1896 execution at Bagumbayan (present-day Riza ...
, an 1000 class LRV train (Car number 1037) was involved in the
Rizal Day bombings The Rizal Day bombings, also referred to as the December 30 bombings, were a series of bombings that occurred around Metro Manila in the Philippines on December 30, 2000. The explosions occurred within a span of a few hours, killing 22 people a ...
at Blumentritt station. The attack on the line killed some 22 people and injured hundreds. Eight members of both Jemaah Islamiyah and the Moro Islamic Liberation Front (MILF), which include Hambal, Asia's most wanted man, and Fathur Rahman al-Ghozi, were charged with plotting and masterminding the attacks in 2003, some three years after the attacks. Three suspects were put on trial, with al-Ghozi receiving 17 years in prison due to the illegal possession of explosives. Al-Ghozi later died in a firefight after attempting to escape from prison.


Other incidents

* On January 3, 2008, a fire blazed at a shopping mall in Baclaran. Due to the smoke, the Baclaran station was temporarily closed. A provisional service was implemented between EDSA and Monumento (at the time, the north extension was not opened yet), with southbound trains still proceeding towards Baclaran to only serve as a turn back siding. The station remained closed the following day until it was reopened a few days later. * On August 11, 2008, a fire blazed in a mall near the Baclaran station. The station closed to the public until the station was reopened on August 13. * On December 8, 2008, a train encountered a glitch while approaching Carriedo station. * On February 18, 2011, two trains (1G and 3G) collided near Roosevelt Station in Quezon City at the reversing tracks, around a kilometer away to the east. There were no passengers onboard when the incident happened. The cause of the collision is yet to be determined, whether due to driver error or technical malfunction. * On April 15, 2011, a door malfunction disrupted the operations of Line 1 at Blumentritt station. * On June 21, 2011, at 8:00 AM, a train suffered a short-circuit in one of its electrical components at Libertad station. On the same day, at 2:23 PM, a power cable was hit by lightning, disrupting the line's operations for three hours. * On August 30, 2012, at 5:50 AM, a woman committed suicide after jumping in front of an approaching train at EDSA station. Operations were disrupted until operations resumed at 9:40 AM. * On December 21, 2012, a train stalled at the Monumento station. * On November 14, 2014, a signalling fault at Roosevelt station limited the operations between Monumento and Baclaran stations. The situation normalized at 3:57 PM. * On May 23, 2015, thousands of passengers were stranded after two trains (1G and 3G) collided near the Monumento station. A train driver was hurt after the impact caused his head to slam into the dashboard of the train. The accident, later revealed to be caused by power fluctuation that affected the signalling system, forced passengers to alight from the station until services was restored around 1 pm at the same day. * On March 10, 2016, a door in a 1G train car was left open while running between Central Terminal and Pedro Gil stations. The problem was fixed at the Pedro Gil station. * On March 22, 2016, the doors of a 1G train car at the Central Terminal station failed to open, leaving passengers trapped inside the train. * On September 26, 2016, a faulty door in a 1G train car suddenly slammed shut in less than a second. No one was injured. * On November 6, 2017, a man's leg got stuck when a train door closed at the Gil Puyat station. The man was dragged at the platform when the train was moving, leaving the man with severe injuries. The man was then sent to a nearby hospital, where he was confined in an intensive care unit. According to a report, a number of trains, particularly the 1000 class (1G) trains, do not have sensors, that detects an object between doors. * On November 27, 2017, a 1100 class (2G) train door malfunctioned after a passenger forcibly opened it at Vito Cruz station, causing the sensor to malfunction. The train continued its journey with the door left open, and a passenger recorded this incident on camera. * On February 20, 2018, at around 6:00am, a train at R. Papa station unloaded 120 passengers after the air pressure gauge inside the train malfunctioned. The operations returned to normal 30 minutes later. * On July 21, 2018, at around 6:00 AM, a contact wire sparked near Libertad station. A provisional service between Roosevelt and United Nations stations were implemented. Normal operations resumed at 2:59 PM after the cable was fixed. * On September 26, 2018, a faulty 1G train door was unable to open at the Balintawak station. A passenger pushed the door open and was able to disembark. The next passenger pushed the door but it abruptly closed on him but managed to get through. * On October 3, 2019, a mechanical problem limited the LRT-1 operations between Monumento and Baclaran stations. The operations returned to normal at 1:50pm. * On November 6, 2020, a 1G train car emitted smoke at Gil Puyat station at 2:00 PM due to a catenary fault. Passengers were evacuated, and the line implemented a provisional service from Balintawak to Central Terminal and vice versa. The situation normalized at 8:00 PM. *On April 4, 2022, a train suffered a glitch at
Tayuman station Tayuman station is an elevated Manila Light Rail Transit (LRT) station situated on Line 1. The station serves Santa Cruz in Manila and is located at the intersection of Rizal Avenue and Tayuman Street. The station is named after Tayuman Stre ...
, causing a speed restriction of . Operations normalized at 7:34am.