Line 3 is a north–south line on the
Nanjing Metro. The line opened on April 1, 2015, running from to . Currently, the line contains 29 stations
spanning a total of .
Between and , it runs parallel to
Line 1.
Opening timeline
Station list
Future Development
Phase 3 of Line 3 started construction in 2021. The extension will add two stations.
好消息!南京地铁3号线三期工程进入实质性施工阶段,新建2座车站
2021-5-27
References
External links
Line 3
on the official Nanjing Metro website (includes route map)
{{DEFAULTSORT:Nanjing Metro, Line 3
Nanjing Metro lines
2015 establishments in China
Railway lines opened in 2015