Line 30 (Chengdu Metro)
   HOME

TheInfoList



OR:

Line 30 of the
Chengdu Metro The Chengdu Metro is the rapid transit system of Chengdu, the capital of Sichuan, China. With the opening of Line 1 on 27 September 2010, the system consists of 12 subway lines and 1 light rail line. It has subsequently undergone rapid expansion. ...
is a
metro line The Metro Line is a light rail transit line on the Edmonton LRT system. The line operates from northwest Edmonton to south Edmonton, and was scheduled to have begun operation by spring 2014 but instead opened on September 6, 2015, at a reduced ...
currently under construction in
Chengdu Chengdu (, ; Simplified Chinese characters, simplified Chinese: 成都; pinyin: ''Chéngdū''; Sichuanese dialects, Sichuanese pronunciation: , Standard Chinese pronunciation: ), Chinese postal romanization, alternatively Romanization of Chi ...
. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from to . Phase 1 is 27.74 km long with 24 stations, all underground. Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h. Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.


History

* On August 21, 2019, Line 30 is approved officially as part of the fourth phase expansion for the Chengdu Metro by the
National Development and Reform Commission The National Development and Reform Commission of the People's Republic of China (NDRC), formerly State Planning Commission and State Development Planning Commission, is a macroeconomic management agency under the State Council, which has br ...
, confirming it for 2019–2024's subway construction plan. * On March 18, 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1. * On July 17, 2020, Construction officially started for the 4 stations on Line 30 in
Longquanyi District Longquanyi District () is one of 11 urban districts of the prefecture-level city of Chengdu, the capital of Sichuan Province, Southwest China, covering parts of the southeastern suburbs. The population is over half a million. It borders the pref ...
. * In Dec 2022, Line 30 Phase 1 finished 's water/cable/pipe reroute, marking station's main structure construction enters next stage. * On 17 Feb 2023, Line 30 Phase 1 ~ section's left tunnel is finished, marking the completion of the 18th tunnel. * On 31 March 2023, Line 30 Phase 1 's Gaobeiba Depot (高碑坝车辆段) is powered on.


Stations


References

Chengdu Metro lines Transport infrastructure under construction in China {{PRChina-metro-stub