Keppel MRT station
   HOME

TheInfoList



OR:

Keppel MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line, located in Bukit Merah planning area,
Singapore Singapore (), officially the Republic of Singapore, is a sovereign island country and city-state in maritime Southeast Asia. It lies about one degree of latitude () north of the equator, off the southern tip of the Malay Peninsula, bor ...
. This station is part of Stage 6 of the Circle line (CCL6) which will "close the circle" between the
HarbourFront Harbourfront may refer to: * Harbourfront (Toronto), a neighbourhood in Toronto ** 509 Harbourfront, Toronto streetcar route **Harbourfront Centre, cultural organization on the waterfront of Toronto * HarbourFront (Singapore), waterfront site in Si ...
and Marina Bay stations. The station will be located along Keppel Road, near to the
Keppel Harbour Keppel Harbour (; ms, Pelabuhan Keppel), also called the Keppel Channel and formerly New Harbour, is a stretch of water in Singapore between the mainland and the southern islands of Pulau Brani and Sentosa (formerly Pulau Blakang Mati). Its natur ...
. Slated for completion by 2026, Keppel station will serve the upcoming Greater Southern Waterfront. First announced in 2015, construction of the station began in 2017. The station was to be opened in 2025 along with the other CCL6 stations, but was delayed to 2026 due to the
COVID-19 pandemic in Singapore The COVID-19 pandemic in Singapore is part of the worldwide pandemic of coronavirus disease 2019 () caused by severe acute respiratory syndrome coronavirus 2 (). The first case in :Singapore was confirmed on 23 January 2020. Early cases ...
.


History

On 29 October 2015, the station was first officially announced as part of the Stage 6 of the Circle line. Contract 882 for the construction of Keppel station and associated tunnels was awarded China State Construction Engineering Corporation Limited (Singapore Branch) and Nishimatsu Construction Co. Ltd. Joint Venture (JV) at a sum of in September 2017. Construction began at the end of 2017, with expected completion in 2026. On 25 July 2019, tunnelling works for the CCL6 started with the launch of the Tunnel Boring Machine at Keppel station. The TBM will tunnel from Keppel to the existing CCL HarbourFront station.


Station details


Location

Situated along Keppel Road, the station will serve the Downtown Core and Keppel Distripark.


Design

The station will have a unique landscape theme; an undulating green roof (with tree-like columns) in a natural setting. It was planned to have an underground bicycle park, providing cyclists direct access to the concourse. The size of the two-level station will be by by .


References


External links

* {{DEFAULTSORT:Keppel MRT station Bukit Merah Mass Rapid Transit (Singapore) stations Railway stations scheduled to open in 2026