The Karot Hydropower Project is an asphalt-core rockfill gravity dam in
Pakistan Pakistan ( ur, ), officially the Islamic Republic of Pakistan ( ur, , label=none), is a country in South Asia. It is the world's fifth-most populous country, with a population of almost 243 million people, and has the world's second-lar ...
, with an installed capacity of 720 MW. The project is sponsored by Chinese state-owned company
China Three Gorges Corporation The China Three Gorges Corporation (CTG; ) is a Chinese state-owned power company, established on 27 September 1993. The company was responsible for the construction of the Three Gorges Dam-project, the world's largest hydroelectric power plant, t ...
(CTG). It is the first investment project of the
Silk Road Fund The Silk Road Fund ( zh, s=丝路基金, t=, p=) is a state-owned investment fund of the Chinese government to foster increased investment in countries along the One Belt, One Road, an economic development initiative primarily covering Eura ...
, and is part of the much larger
China–Pakistan Economic Corridor China–Pakistan Economic Corridor (CPEC) (; ur, چین پاکستان اقتصادی راہداری) is a collection of infrastructure projects that are under construction throughout Pakistan beginning in 2013. Originally valued at $47 billi ...
(CPEC). The construction works were 88% complete as of May 2021.The project was successfully commissioned on June 29, 2022.


Location

The Karot Hydropower Project is planned on
Jhelum River The Jhelum River (/dʒʰeːləm/) is a river in the northern Indian subcontinent. It originates at Verinag and flows through the Indian administered territory of Jammu and Kashmir, to the Pakistani-administered territory of Kashmir, and then ...
near Karot village, some 1.7 kilometers upstream of Karot Bridge and 74 km upstream of
Mangla Dam The Mangla Dam ( ur, ) is a multipurpose dam situated on the Jhelum River in the Mirpur District of Azad Kashmir. It is the sixth-largest dam in the world. The village of Mangla, which sits at the mouth of the dam, serves as its namesake. I ...
. The Project site is accessible through the Islamabad – Kahuta – Kotli road, approximately 29 kilometers from
Kahuta Kahuta (Punjabi, Urdu: کہوٹہ) is a census-designated city and tehsil in the Rawalpindi District of Punjab Province, Pakistan. The population of the Kahuta Tehsil is approximately 220,576 at the 2017 census. Kahuta is the home to the Kahuta ...
, and 65 kilometers from
Islamabad Islamabad (; ur, , ) is the capital city of Pakistan. It is the country's ninth-most populous city, with a population of over 1.2 million people, and is federally administered by the Pakistani government as part of the Islamabad Capital ...
.


History

The
Jhelum River The Jhelum River (/dʒʰeːləm/) is a river in the northern Indian subcontinent. It originates at Verinag and flows through the Indian administered territory of Jammu and Kashmir, to the Pakistani-administered territory of Kashmir, and then ...
is the largest river of Indus Basin River System, and its hydropower potential was identified by various studies carried out by international agencies, with the first report issued by the Canadian Consultant group MONENCO in 1983, followed by a 1994 study by the German Agency for Technical Cooperation (GTZ) that formally proposed the Karot Hydropower Project. On September 28, 2016, the federal and Azad Jammu and Kashmir governments signed an implementation agreement with a Chinese consortium for development and operation on river Jhelum at a levelised tariff of 7.57 cents per unit for 30 years. Financial close of the project was achieved in February 2017 while land acquisition award has also been done. Groundbreaking on the project took place on January 10, 2016. Construction works were 25% complete as of September 2017, 70% as of January 2020 and 88% as of May 2021.The project was successfully commissioned on June 29, 2022.


Project details

The major project features include construction of concrete gravity 95.5 meters high dam with a crest length of 320 meters near the village of Gohra. The dam's reservoir will be approximately 164.5 million cubic meters in volume, with a length of 27 kilometers. 72 homes and 58 businesses are expected to require relocation as a result of construction, while 2.8 kilometers of the Karot-Kotli road, and 8.9 kilometers of the Azad Pattan-Kahuta road will need relocation. The power intake structure will be constructed on right bank of the river immediately upstream of Dam site and will divert the water into headrace tunnels entering into Cavern Powerhouse. The water will be discharged back to River Jhelum through tail-race channel located at right bank of the River Jhelum immediately downstream of Karot village. The dam will generate mean annual energy 3,436 GWh, and will connect to Pakistan's national electricity grid. SMEC International Pty Ltd is participating as Employer's Engineer, who is providing services for project management, design review and construction supervision for 720 MW Karot hydropower project


Financing

The Karot project is being developed by Karot Power Company comprising Three Gorges South Asia Investment Limited, a subsidiary of
China Three Gorges Corporation The China Three Gorges Corporation (CTG; ) is a Chinese state-owned power company, established on 27 September 1993. The company was responsible for the construction of the Three Gorges Dam-project, the world's largest hydroelectric power plant, t ...
, China-CTGC and Associated Technologies of Pakistan. Total costs for the project are estimated to be $2 billion, and will be funded by International Finance Corporation, China's
Silk Road Fund The Silk Road Fund ( zh, s=丝路基金, t=, p=) is a state-owned investment fund of the Chinese government to foster increased investment in countries along the One Belt, One Road, an economic development initiative primarily covering Eura ...
. The
Export-Import Bank of China The Export–Import Bank of China (Chexim - China Exim Bank) () is one of two institutional banks in China chartered to implement the state policies in industry, foreign trade, economy, and foreign aid to other developing countries, and pro ...
and China Development Bank will issue loans to the Karot Power Company. It will be built on a "Build-Own-Operate-Transfer" basis for 30 years, after which ownership will be turned over to the government of Pakistan. After completion, the company will run and maintain the project for 30 years at a levelised tariff of 7.57 cents per unit after which it will be transferred to the Punjab government at a notional price of Rs.1.


References

{{stack, {{Portal, Pakistan, Water, Renewable energy Hydroelectric power stations in Pakistan Rawalpindi District China–Pakistan Economic Corridor Dams in Punjab, Pakistan Dams under construction Dams on the Jhelum River Rock-filled dams