The Kaliwa Low Dam, proposed by the Philippine Government in 2012, was one of several bulk water supply projects on the upper portion of the Kaliwa River Watershed that have been proposed but ultimately shelved by the
Philippine Government The Government of the Philippines ( fil, Pamahalaan ng Pilipinas) has three interdependent branches: the legislative, executive, and judicial branches. The Philippines is governed as a unitary state under a presidential representative and d ...
since the 1970s. The proposed Kaliwa Low Dam design had a 600 million-liters-a-day (MLD) capacity, and the water supply tunnel has a 2,400-MLD capacity. Had it been built, the Kaliwa Low Dam was expected to ease the demand on the
Angat Dam Angat Dam () is a concrete water reservoir embankment hydroelectric dam that supplies Metro Manila and nearby provinces with water. It was a part of the Angat-Ipo- La Mesa water system. The reservoir supplies about 90 percent of raw water require ...
, Manila's sole water storage facility. It was the main component of the New Centennial Water Source-Kaliwa Dam Project in
Tanay, Rizal Tanay, officially the Municipality of Tanay ( tgl, Bayan ng Tanay ), is a 1st class municipality in the province of Rizal, Philippines. According to the 2020 census, it has a population of 139,420 people. It is located east of Manila, althoug ...
, which also called for the construction of a water supply tunnel and various attendant infrastructure. The project had originally been proposed as a bigger, integrated system that included a plan for a second dam, named Laiban dam further upstream. But the government decided on a proposal that would have built the system in stages, and only stage one, involving Kaliwa Low Dam and the water supply tunnel, was approved under the administration of
Benigno Aquino III Benigno Simeon Cojuangco Aquino III (; February 8, 1960 – June 24, 2021), also known as Noynoy Aquino and colloquially as PNoy, was a Filipino politician who served as the 15th president of the Philippines from 2010 to 2016. The son of ...
. When the project did not move forward by the time Aquino administration ended, the succeeding Duterte administration decided not to pursue the Japanese-proposed Kaliwa Low Dam plan and instead pursued a bigger, China-funded dam project.


Earlier projects at the Laiban Watershed

Various plans for the construction of a dam in Tanay, Rizal, have been proposed since the 1970s, when the Marcos government first decided that the location was a more viable location for a dam than the
Marikina River The Marikina River ( tl, Ilog Marikina) is a river in eastern Metro Manila, Philippines. It is the largest tributary of the Pasig River, with headwaters located in the Sierra Madre Mountains in Rodriguez, Rizal province. The Marikina River us ...
. However, protests against the construction of the dam, called Laiban because Barangay Laiban was chosen as the exact project site, very quickly led to protests from various groups. Foremost among these were indigenous peoples from Central and Southern Luzon, notably the local Remontado Dumagat people, whose
ancestral lands Ancestral domain or ancestral lands refers to the Lands inhabited by indigenous peoples, lands, territories and resources of indigenous peoples, particularly in the Asia-Pacific region. The term differs from indigenous land rights, Aboriginal titl ...
would specifically be affected. Environmental and activist groups later also raised concerns. As a result, construction of the dam has been approved, deferred, stopped, and restarted a number of times in the decades since.


Project approval process


Original proposal, including Laiban Dam and Power Plant

The roots of the current "New Centennial Water Source Project" can be traced to the Water Security Legacy (WSL) Roadmap proposed by the
Metropolitan Waterworks and Sewerage System Metropolitan may refer to: * Metropolitan area, a region consisting of a densely populated urban core and its less-populated surrounding territories * Metropolitan borough, a form of local government district in England * Metropolitan county, a typ ...
(MWSS) in 2012–2016. Based on this document, the MWSS developed plans for "''the development of a dam at the Kaliwa River (Laiban Dam), and/or a smaller dam downstream (Kaliwa Low Dam) to maximize water supply, ensure short - and long - term redundancy, and optimize power generation capacities''," and in February 2013, the Public Private Partnership Center released a document "sounding out" interested parties. In that initial market sounding, this proposal was already thought likely to comprise: #) Laiban Dam and/or Kaliwa Low Dam; #) Head works and its appurtenant facilities; #) Conveyance structure from the diversion point to the water treatment facility(s); #) Water treatment facility(s); and #) Hydropower facility(s). In report by Philippine Daily Inquirer reporter Niña Calleja in that same month, MWSS senior deputy administrator Nathaniel Santos indicated that the main difference of the NCWSP from previous plans was that it would involve the construction of two smaller dams at the Kaliwa watershed instead of just the one. A main dam (Laiban Dam) would be built at the upper Kaliwa River in Barangay Laiban, and another regulating dam (Kaliwa Low Dam) further downstream. When the
National Economic and Development Authority The National Economic and Development Authority (NEDA; fil, Pambansang Pangasiwaan sa Kabuhayan at Pagpapaunlad) is an independent cabinet-level agency of the Philippine government responsible for economic development and planning. It is headed ...
(NEDA) Investment Coordination Committee (ICC) had their October 4, 2013 Joint Cabinet Committee and Technical Board Meeting, however, they suggested that the MWSS to develop the project in stages, allowing for construction on the Kaliwa Low Dam to begin sooner, and for the Laiban Dam components of the project to be funded under a different financial mechanism.


Project financing

The original integrated project had been proposed by the MWSS under a build-operate-transfer (BOT) financing scheme. When the Joint Cabinet Committee and Technical Board Meeting of the
National Economic and Development Authority The National Economic and Development Authority (NEDA; fil, Pambansang Pangasiwaan sa Kabuhayan at Pagpapaunlad) is an independent cabinet-level agency of the Philippine government responsible for economic development and planning. It is headed ...
(NEDA) Investment Coordination Committee (ICC) discussed the project on 4 October 2013, however, they recommended that the MWSS resubmit its proposal with only the Kaliwa Low Dam and water supply tunnel components, and that it be funded using the MWSS' funds or though overseas development assistance.


Approval of Kaliwa Low Dam proposal

The project, with its revised scope, was approved at the May 29, 2014, meeting of the NEDA Board, which is chaired by President
Benigno Aquino III Benigno Simeon Cojuangco Aquino III (; February 8, 1960 – June 24, 2021), also known as Noynoy Aquino and colloquially as PNoy, was a Filipino politician who served as the 15th president of the Philippines from 2010 to 2016. The son of ...
. On July 28, 2014, President Aquino cited Kaliwa dam in his 5th State of the Nation Address as one of the infrastructure projects approved by his administration as part of its drought prevention efforts. In 2015, two consortia were pre-qualified to bid for the undertaking of the Kaliwa Dam project — the SMC-K Water Consortium, which is a partnership between San Miguel Holdings Corp. and Korea Water Resources Corp.; and the Abeima-Datem Consortium, which is a partnership between Albeinsa Infraestructura Medio Ambiento S.A and Datem Inc.


Government shift to Chinese proposal

In 2019, under the
administration Administration may refer to: Management of organizations * Management, the act of directing people towards accomplishing a goal ** Administrative assistant, Administrative Assistant, traditionally known as a Secretary, or also known as an admini ...
of President
Rodrigo Duterte Rodrigo Roa Duterte (, ; born March 28, 1945), also known as Digong, Rody, and by the initials DU30 and PRRD, is a Filipino lawyer and politician who served as the 16th president of the Philippines from 2016 to 2022. He is the chairperson ...
, the government revealed that it would not continue with the project under a
public–private partnership A public–private partnership (PPP, 3P, or P3) is a long-term arrangement between a government and private sector institutions.Hodge, G. A and Greve, C. (2007), Public–Private Partnerships: An International Performance Review, Public Administ ...
agreement as proposed during the Aquino administration, but would instead pursue the project using
Official Development Assistance Official development assistance (ODA) is a category used by the Development Assistance Committee (DAC) of the OECD, Organisation for Economic Co-operation and Development (OECD) to measure aid, foreign aid. The DAC first adopted the concept in ...
loan from China. Some lawyers noted that the interest rate of the Chinese deal was 2%, while the Japanese deal that was sidelined by the government only had a 1.25% interest. The Japanese have since renewed their call for the Philippine government to reconsider their proposal.


Social and environmental concerns


Social issues

Ancestral lands belonging to indigenous Dumagats and Remontados will be affected by the Kaliwa Dam project. The coalition Sectors Opposed to the Kaliwa Dam (STOP Kaliwa Dam) estimate that 1,000 households from Barangay Daraitan in Tanay, Rizal, and 500 households in Pagsangahan, General Nakar, Quezon, will be inundated by the construction. The Samahan ng mga Katutubong Agta/Dumagat (Organization of Indigenous Agta/Dumagat) estimate that the project would displace 10,000 members of the Dumagat tribe. Protesters have maintained that indigenous communities that will be affected by the project were not consulted. Philippine law requires that such projects acquire free, prior, and informed consent (FPIC) from indigenous communities.


Environmental issues

Sierra Madre is one of the most biodiverse areas in the Philippines and the largest remaining rainforest in the country. An estimated 12,147 hectares of residual forests, home to 172 recorded plant or flora species will be affected by the dam construction. The project site is part of the Kaliwa Watershed Forest Reserve, which is supposedly protected by virtue of Proclamation No. 573 on June 22, 1968. Proclamation 1636 declared a portion of the area a National Park and Wildlife Sanctuary. Environmental groups have protested the project, as the dam will destroy a great portion of the Sierra Madre range. The dam will ultimately destroy numerous habitats of many
endangered species An endangered species is a species that is very likely to become extinct in the near future, either worldwide or in a particular political jurisdiction. Endangered species may be at risk due to factors such as habitat loss, poaching and inv ...
living in the mountains once construction begins.Archived a
Ghostarchive
and th
Wayback Machine
Among the thousands of plant and animal life whose home will be destroyed by the project is the critically endangered
Philippine eagle The Philippine eagle (''Pithecophaga jefferyi''), also known as the monkey-eating eagle or great Philippine eagle, is a critically endangered species of eagle of the family Accipitridae which is endemic to forests in the Philippines. It has br ...
. Other species that will be affected by the project are the endangered north Philippine hawk-eagle, the
Philippine brown deer The Philippine deer (''Rusa marianna''), also known as the Philippine sambar or Philippine brown deer, is a vulnerable deer species endemic to the Philippines. It was first described from introduced populations in the Mariana Islands, hence t ...
, the
Philippine warty pig The Philippine warty pig (''Sus philippensis'') is one of four known species in the pig genus ('' Sus'') endemic to the Philippines. The other three endemic species are the Visayan warty pig (''S. cebifrons''), Mindoro warty pig (''S. oliveri'') ...
, and the vulnerable northern rufous hornbill.


See also

* Proposed Dams in the Kaliwa River watershed * Manila Water Supply III project *
Angat Dam Angat Dam () is a concrete water reservoir embankment hydroelectric dam that supplies Metro Manila and nearby provinces with water. It was a part of the Angat-Ipo- La Mesa water system. The reservoir supplies about 90 percent of raw water require ...
*
Wawa Dam Wawa Dam (also known as Montalban Dam) is a gravity dam constructed over the Marikina River in the municipality of Rodriguez in Rizal province, Philippines. The slightly arched dam is situated in the high Montalban Gorge or Wawa Gorge, a wate ...
*
Chico River Dam Project The Chico River Dam Project was a proposed hydroelectric power generation project involving the Chico River on the island of Luzon in the Philippines that locals, notably the Kalinga people, resisted because of its threat to their residences, li ...
*
Metropolitan Waterworks and Sewerage System Metropolitan may refer to: * Metropolitan area, a region consisting of a densely populated urban core and its less-populated surrounding territories * Metropolitan borough, a form of local government district in England * Metropolitan county, a typ ...


References

{{coord missing, Philippines Dams in the Philippines Sierra Madre (Philippines) Proposed water supply infrastructure Cancelled dams