The KC Streetcar is a one-route
streetcar A tram (also known as a streetcar or trolley in Canada and the United States) is an urban rail transit in which vehicles, whether individual railcars or multiple-unit trains, run on tramway tracks on urban public streets; some include s ...
system in downtown Kansas City, Missouri. Construction began in May 2014, and service began on May 6, 2016. The KC Streetcar is part of the
Kansas City metropolitan area The Kansas City metropolitan area is a bi-state metropolitan area anchored by Kansas City, Missouri. Its 14 counties straddle the border between the U.S. states of Missouri (9 counties) and Kansas (5 counties). With and a population of more t ...
's integrated public transit brand RideKC, and is operated by the Kansas City Streetcar Authority. It is free to ride, as it is funded by a transportation development district. , the KC Streetcar has had over 15 million rides since its opening in 2016. The initial line is long, and construction began in 2022 for extensions north to the riverfront and south to the University of Missouri-Kansas City. In the RideKC system, the KC Streetcar is internally designated as route 601.


Route

The downtown streetcar runs along a route between the River Market and
Union Station A union station, union terminal, joint station, or joint-use station is a railway station at which the tracks and facilities are shared by two or more separate railway company, railway companies, allowing passengers to connect conveniently bet ...
, running through the
central business district A central business district (CBD) is the Commerce, commercial and business center of a city. It contains commercial space and offices, and in larger cities will often be described as a financial district. Geographically, it often coincides wit ...
and the Crossroads, mostly along Main Street. It makes stops about every two blocks, and has 10 designated stops along the route. It connects directly with
Amtrak The National Railroad Passenger Corporation, Trade name, doing business as Amtrak (; ), is the national Passenger train, passenger railroad company of the United States. It operates intercity rail service in 46 of the 48 contiguous United Stat ...
, local and commuter RideKC bus services (including a direct route to Kansas City International Airport) and several RideKC bike-share kiosks. Proponents tout the initial segment as one of the simplest and straightest modern streetcar routes in the United States. All platforms offer
level boarding Various terms are used for passenger railway lines and equipment; the usage of these terms differs substantially between areas: Rapid transit A rapid transit system is an electric railway characterized by high speed (~) and rapid acceleratio ...
and real-time arrival information.


History


Development

After earlier efforts to create a metrowide or citywide rail transit system failed at the ballot box, voters in downtown Kansas City approved funding for a two-mile streetcar line in December 2012. In December 2012, the
city council A municipal council is the legislative body of a municipality or local government area. Depending on the location and classification of the municipality it may be known as a city council, town council, town board, community council, borough counc ...
awarded a contract to HDR, Inc. to complete a final design for the downtown streetcar line. HDR had previously performed preliminary engineering work. In October 2013, it was announced that
Construcciones y Auxiliar de Ferrocarriles Construcciones y Auxiliar de Ferrocarriles (Grupo CAF, ) is a Spanish publicly listed company which manufactures railway vehicles and equipment and buses through its Solaris Bus & Coach subsidiary. It is based in Beasain, Basque Autonomous Comm ...
(CAF) would build low-floor Urbos 3 streetcars for the line. Pre-construction work, utility-relocation work in preparation for the project, began in late 2013, and construction of the line began in May 2014. Construction was completed in late 2015, with the first streetcar arriving in November 2015 and testing was performed from December 2015 to May 2016. The projected cost of the Downtown streetcar was $102 million. The majority of funds came from Special Obligation Bonds of the City of Kansas City, Missouri totaling $64 million. Construction bonds and operating costs were repaid by a special assessment and 1%
sales tax A sales tax is a tax paid to a governing body for the sales of certain goods and services. Usually laws allow the seller to collect funds for the tax from the consumer at the point of purchase. When a tax on goods or services is paid to a govern ...
collected inside a transportation development district (TDD) approved by voters in 2012. Both levies are assessed only within the taxing district, which encompasses downtown neighborhoods along the streetcar route. Additional funding included a utility contribution and two federal grants totaling $17.1 million. The project received another $20 million federal grant, through the Transportation Investment Generating Economic Recovery (TIGER) program, in August 2013. Passengers ride free of charge, as operating costs are covered by the TDD. Total construction costs were $250,000 under budget and operations costs started out under budget.


Opening

KC Streetcar operation began on May 6, 2016, at approximately 11am. The total opening Friday and Saturday ridership was over 27,000 rides, with the trains travelling 650 miles. The weekend celebration for the streetcar's opening included music, a free carnival, fireworks, and coordinated specials at businesses.
Bus service Public transport bus services are generally based on regular operation of transit buses along a route calling at agreed bus stops according to a published public transport timetable. History of buses Origins While there are indications o ...
and bike share service was free to correspond with the launch. City officials stated the line exceeded their expectations, with over 100,000 rides in the first two weeks, and one million rides after 5 months.


Ridership

The line was originally projected to have a daily average ridership of just 2,700. Average yearly ridership levels have been around double this figure. The streetcar is free to ride, and is funded by the local transportation development district. Ridership is calculated by the use of automatic, anonymous passenger counters at each streetcar door – with manual checks to ensure accuracy. Per mile, the streetcar has higher ridership than other major transit lines such as the Muni Metro in
San Francisco, California San Francisco, officially the City and County of San Francisco, is a commercial, Financial District, San Francisco, financial, and Culture of San Francisco, cultural center of Northern California. With a population of 827,526 residents as of ...
or
METRORail METRORail is the light rail system in Houston, Texas (United States). In , the system had a ridership of , or about per weekday as of . METRORail ranks as the second most-traveled light rail system in the Southern United States and the List ...
in
Houston, Texas Houston ( ) is the List of cities in Texas by population, most populous city in the U.S. state of Texas and in the Southern United States. Located in Southeast Texas near Galveston Bay and the Gulf of Mexico, it is the county seat, seat of ...
. In 2023, KC Streetcar had 2,281 average daily boardings per mile, compared to 1,924 for Muni Metro in San Francisco and 1,705 for METRORail in Houston. Following initial high ridership, two additional streetcars were ordered from CAF to service demand. The line celebrated 5 million rides in September 2018. On July 5, 2019, the streetcar set a one day ridership record, with 15,559 rides. The
COVID-19 pandemic The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
heavily impacted ridership, which dropped by two-thirds to just 2,148 daily rides in 2020. In 2021, ridership levels recovered, but to levels lower than before the pandemic. The line celebrated 10 million rides in April 2022. During the 2023 NFL draft three-day weekend in April 2023, nearly 60,000 rides were taken and a one day ridership record was set on April 27, with 21,601 riders. In December 2023, KC Streetcar noted that demand had recovered to 95% of pre-pandemic levels on weekends, and 80% on weekdays.


Rolling stock

In October 2013, the mayor announced that the system will use 100% low-floor Urbos 3 streetcars made by the American subsidiary of
Construcciones y Auxiliar de Ferrocarriles Construcciones y Auxiliar de Ferrocarriles (Grupo CAF, ) is a Spanish publicly listed company which manufactures railway vehicles and equipment and buses through its Solaris Bus & Coach subsidiary. It is based in Beasain, Basque Autonomous Comm ...
(CAF) in Elmira Heights, New York. The streetcars are numbered following the order set up by the original Kansas City Public Service Company numbering system. The first streetcar (801) arrived in Kansas City on November 2, 2015, with testing beginning on November 6. Following initial high ridership, two additional streetcars were ordered from CAF in June 2017 at a cost of $12 million. Car 805 arrived on May 13, 2019, and entered service on July 1, 2019. Car 806 arrived on August 26, 2019. As part of the expansion of the line south, 8 additional streetcars were ordered from CAF, doubling the size of the fleet to 14. The first of the expanded fleet (Car 807) arrived in February 2024, and began testing soon after. In December 2024, the last of the additional streetcars (Car 814) arrived in Kansas City. The additional streetcars have minor improvements including improved video surveillance and on-board passenger information.


Expansion

Expansion planning began in 2014. Two studies covered one line north, crossing the
Missouri River The Missouri River is a river in the Central United States, Central and Mountain states, Mountain West regions of the United States. The nation's longest, it rises in the eastern Centennial Mountains of the Bitterroot Range of the Rocky Moun ...
and eight lines heading east, west and south from downtown. A ballot proposition in August 2014 to add three new rail lines and an improved bus line failed 40%–60%. A grassroots effort to revisit expansion using the same legal structure as the starter line was funded by the private sector. An extension south to University of Missouri-Kansas City (UMKC) along Main Street is currently under construction, with completion due by early 2025.


Extension to UMKC

In August 2017, voters approved the formation of a transportation development district (TDD) to help fund an extension south towards UMKC. In December 2020, the
Federal Transit Administration The Federal Transit Administration (FTA) is an agency within the United States Department of Transportation (DOT) that provides financial and technical assistance to local public transportation systems. The FTA is one of ten modal administration ...
(FTA) announced it had awarded $174 million for the extension, with the remaining $177 million of funding coming from the expanded TDD. Groundbreaking occurred on April 6, 2022. In July 2023, Mayor of Kansas City
Quinton Lucas Quinton Donald Lucas (born August 19, 1984) is an American politician elected in 2019 as the 55th mayor of Kansas City, Missouri. He is a member of the Democratic Party (United States), Democratic Party, and is the city's third African-American ...
called for transit-only lanes on Main Street as part of the work. On August 17, 2024, streetcars drove south of Pershing Road for the first time since 1957 during track testing for the new line. The new track was fully connected with the original track on October 22, 2024. , the extension to UMKC is scheduled to open in early 2025.


Riverfront Extension

In August 2017, the KC Port Authority announced plans to extend the line north from the River Market toward the Missouri River, connecting to Berkley Riverfront Park and the
Kansas City Current The Kansas City Current are an American professional Association football, soccer team based in Kansas City, Missouri, that competes in the National Women's Soccer League (NWSL). It was founded as an NWSL expansion, expansion team in 2021 NWSL ...
soccer stadium ( CPKC Stadium). The extension would be funded by the KC Port Authority, as well as by federal TIGER funding. In December 2020, $14.2 million was awarded by the FTA towards the extension, with additional funding required from local sources. A groundbreaking ceremony for the project took place on March 1, 2024, with completion anticipated to be in 2026.


Future extensions

In September 2021, the KC Streetcar Authority began studying the potential for a northern extension of the line over the
Missouri River The Missouri River is a river in the Central United States, Central and Mountain states, Mountain West regions of the United States. The nation's longest, it rises in the eastern Centennial Mountains of the Bitterroot Range of the Rocky Moun ...
to North Kansas City. In January 2023, officials noted this would cost around $222 million to build, and that a TDD would not cover all its construction cost. In October 2021, the KC Streetcar Authority and Kansas City Area Transportation Authority began planning an east–west transit line towards University of Kansas Medical Center and
Kansas City, Kansas Kansas City (commonly known as KCK) is the third-most populous city in the U.S. state of Kansas and the county seat of Wyandotte County. It is an inner suburb of the older and more populous Kansas City, Missouri, after which it is named. As ...
. Initial public consultation indicated that a streetcar line was preferred over bus rapid transit, and that a route along 39th Street and Linwood Boulevard was preferred. In November 2023, a proposed streetcar route was announced, a line from University of Kansas Medical Center to Van Brunt Boulevard using 39th Street and Linwood Boulevard, with 16 proposed stops. Officials noted that the line would cost between $560 million and $650 million to build, and that a TDD would not cover the cost of construction. Other funding sources such as federal grants and local, regional or state taxes would be considered as alternatives. It was noted that a TDD along the route may cover the estimated $8 million operating cost of the line.


Operating authority

The streetcar is operated by the Kansas City Streetcar Authority, a
not-for-profit A not-for-profit or non-for-profit organization (NFPO) is a Legal Entity, legal entity that does not distribute surplus funds to its members and is formed to fulfill specific objectives. While not-for-profit organizations and Nonprofit organ ...
corporation A corporation or body corporate is an individual or a group of people, such as an association or company, that has been authorized by the State (polity), state to act as a single entity (a legal entity recognized by private and public law as ...
that is funded by local taxes. The authority was incorporated in August 2012 after voters approved creation of the Kansas City Downtown Transportation Development District, a special taxing district that funds construction and operation of a two-mile route through downtown Kansas City. Legal claims against the district and its taxation power were dismissed in August 2013. The streetcar began construction in May 2014, was completed in late 2015, and began carrying passengers in service on May 6, 2016. The Streetcar Authority's 13 directors, a mix of public officials, business people, and transit advocates, were appointed by the City Council and Port Authority in late 2012 and met for the first time as an officially sanctioned body in early 2013. The authority's oversight of the streetcar's operation and maintenance is modeled on that of the Portland Streetcar. The city council has the power to appoint some of the authority's directors and retains ownership over the system. Daily operations and maintenance of the system is handled by Herzog Transit Services, under joint contract to the Streetcar Authority and the City of Kansas City. The contract was signed in October 2015.


Economic development

Even prior to the opening of the line in 2016, new development was occurring along the route. Analysis by HDR, Inc. stated that the downtown area along the route received $1.8 billion of development between 2013 and 2018, with a quarter of the investment publicly credited to the creation of the streetcar. The streetcar has also been praised by political leaders and venue operators for making Kansas City more attractive for events, such as the 2021 Big 12 men's basketball tournament and the 2023 NFL draft. In 2021, local businesses stated the extension of the line south to UMKC has also spurred development in the area, with of private investment. In 2023, it was reported that investors and developers had purchased over 150 properties along the extension route. Some residents have been concerned that development along the route will lead to gentrification.


See also

* Light rail in the United States * List of streetcar systems in the United States (historical) *
Streetcars in North America Streetcars or trolley(car)s (American English for the European word ''tram'') were once the chief mode of public transit in hundreds of North American cities and towns. Most of the original urban streetcar systems were either dismantled in the mi ...


Notes


References


External links

* {{Modern Streetcars 750 V DC railway electrification Electric railways in Missouri Public transportation in Kansas City, Missouri Streetcars in Missouri Transit agencies in Missouri Free public transport 2016 establishments in Missouri