The Iron Gate II ( ro, Porțile de Fier II, sr, Ђердап II, translit=Đerdap II) is a large
dam
A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use ...
on the
Danube River
The Danube ( ; ) is a river that was once a long-standing frontier of the Roman Empire and today connects 10 European countries, running through their territories or being a border. Originating in Germany, the Danube flows southeast for , pa ...
, between
Romania
Romania ( ; ro, România ) is a country located at the crossroads of Central, Eastern, and Southeastern Europe. It borders Bulgaria to the south, Ukraine to the north, Hungary to the west, Serbia to the southwest, Moldova to the east, and ...
and
Serbia
Serbia (, ; Serbian: , , ), officially the Republic of Serbia (Serbian: , , ), is a landlocked country in Southeastern and Central Europe, situated at the crossroads of the Pannonian Basin and the Balkans. It shares land borders with Hungar ...
.
Characteristics
The dam is built at the Danube's .
The project started in 1977 as a joint-venture between the governments of
Romania
Romania ( ; ro, România ) is a country located at the crossroads of Central, Eastern, and Southeastern Europe. It borders Bulgaria to the south, Ukraine to the north, Hungary to the west, Serbia to the southwest, Moldova to the east, and ...
and
Yugoslavia
Yugoslavia (; sh-Latn-Cyrl, separator=" / ", Jugoslavija, Југославија ; sl, Jugoslavija ; mk, Југославија ;; rup, Iugoslavia; hu, Jugoszlávia; rue, label=Pannonian Rusyn, Югославия, translit=Juhoslavija ...
for the construction of large dam on the Danube River which would serve both countries. At the time of completion in 1984 the dam had 16 units generating a total of , divided equally between the two countries at each.
The
Romania
Romania ( ; ro, România ) is a country located at the crossroads of Central, Eastern, and Southeastern Europe. It borders Bulgaria to the south, Ukraine to the north, Hungary to the west, Serbia to the southwest, Moldova to the east, and ...
n part of the
power station
A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.
Many ...
was modernised and another 2 units were installed; the nominal capacity of the 10 units was increased from to thus having an installed capacity of . The Romanian side of the
power station
A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.
Many ...
produces approximately per annum.
The
Serbia
Serbia (, ; Serbian: , , ), officially the Republic of Serbia (Serbian: , , ), is a landlocked country in Southeastern and Central Europe, situated at the crossroads of the Pannonian Basin and the Balkans. It shares land borders with Hungar ...
n part of the power station currently has 10 units with a nominal capacity of each and a total power generation capacity of . producing approximately per annum. At the celebration ceremony for the 27 years since the power station's deployment it was announced that production in 2011 reached despite bad weather conditions. As of 2018 the Serbian side of the power plant is in the process of revitalization; when finished, the power of each aggregate will be lifted from 27 to 32 MW.
[
Current total power generation capacity of the power station is .
In 2011, a ]border checkpoint
A border checkpoint is a location on an international border where travelers or goods are inspected and allowed (or denied) passage through. Authorization often is required to enter a country through its borders. Access-controlled borders ofte ...
between Serbia and Romania for cars and light cargo vehicles was open.
Iron Gate III Hydroelectric Power Station
Plans for the third dam were drafted in 1973 by the Energoprojekt holding
Energoprojekt holding (full legal name: ''Energoprojekt holding a.d. Beograd'') is a Serbian construction company with headquarters in Belgrade, Serbia. Founded in 1951, it enters into the composition of BELEX15 and BELEXline, the two main indi ...
and Jaroslav Černi Institute. Selected location was the village of Dobra, in the Golubac
Golubac ( sr-cyr, Голубац, ; ro, Golubăț) is a village and municipality located in the Braničevo District of eastern Serbia. Situated on the right side of the Danube river, it is bordered by Romania to the east, Veliko Gradište to ...
municipality, at the Danube's . Iron Gate III was planned as the reversible power plant, which would pump water into the uphill reservoirs on the Brodica, Pesača and Železnički Potok localities. The tunnels were to lift water from the altitude of (Danube level), to (uphill reservoirs). The reservoirs would also accept water from the neighboring streams, and collect a total of of water. All reservoirs would be connected with tunnels, from (Pesača-Vodostan) to long (Brodica-Pesača). In total, after three phases of construction, the power plant would have a total installed capacity of 2,400 MW.
The studies were conducted into the 1980s, and the terrain was surveyed and measured, as it is made of karst. Apart from Yugoslavia and Romania, representatives of the electric companies from USSR
The Soviet Union,. officially the Union of Soviet Socialist Republics. (USSR),. was a transcontinental country that spanned much of Eurasia from 1922 to 1991. A flagship communist state, it was nominally a federal union of fifteen nationa ...
and West Germany
West Germany is the colloquial term used to indicate the Federal Republic of Germany (FRG; german: Bundesrepublik Deutschland , BRD) between its formation on 23 May 1949 and the German reunification through the accession of East Germany on 3 O ...
also participated in the surveys. Romania was to build a similar facility on its side of the river. Both states also planned additional power plants of 120 MW adjoining the third dams, which were to function only during the high water levels, accepting the water surplus. Upstream the Danube, Yugoslavia also planned additional reversible power plant "Bistrica" (680 MW), operational only on water streams in the hills, so the permit from the Danube Commission
The Danube Commission (, , ) is concerned with the maintenance and improvement of navigation conditions of the Danube River, from its source in Germany to its outlets in Romania and Ukraine, leading to the Black Sea. It was established in 1948 b ...
would not be needed. If built at the time, the Iron Gate III-Bistrica system would make 37% of Serbian electricity production capacity in 2021.[
In August 2021, the construction was tentatively announced for 2022, having a major role in Serbian transition to renewable energy sources, though the price was set to "several billion euros". Other projects were also announced, which experts consider more feasible due to the Iron Gate 3's high price and complex system. Also, with other projects being finished first, the Iron Gate 3 would exceed Serbian needs in electricity, so they proposed that project should be a regional and interstate one. The complex will be completed in three phases, and when finished, it will produce 484 GWh of electricity per year. In September 2021, U.S. company Bechtel expressed interest in building the dam, and the meeting between Bechtel's president Stu Jones, Serbian energy minister ]Zorana Mihajlović
Zorana Mihajlović ( sr-cyr, Зорана Михајловић, ; born 5 May 1970) is a Serbian politician who served as deputy prime minister of serbia from 2014 to 2022 and as minister of mining and energy from 2012 to 2014, and again from 20 ...
, and US ambassador to Serbia Christopher R. Hill
Christopher Robert Hill (born August 10, 1952) is an American diplomat who is United States Ambassador to Serbia. Previously, he was professor at George W. Ball adjunct Columbia University in the City of New York, the Chief Advisor to the Chance ...
was held on 1 August 2022.
By the end of the year, Serbian government allocated €1.5 billion in the 2022 budget for the construction of Iron Gate 3, or half of the total projected costs. The government also stated that a foreign, strategic partner will be needed. It is expected to be either some Chinese company (as they build numerous large infrastructure objects already), or a Russian one, as the Russians are already revitalizing the Iron Gate I dam. The construction is estimated to last for three to five years, in, now expanded four phases (I - 600 MW/2 billion KWh; II - 1.200 MW/3.1 billion MWh; III - 1.800 MW/5.2 billion KWh). After the final, phase IV, total capacity will reach 2.400 MW and annual production is estimated to 7.6 billion KWh. The power plant would be operational only at night.
See also
* Ostrovul Mare Bridge
The Ostrovul Mare Bridge is a bridge in Romania over the of the Danube. It is intended for complementary access to the Ostrovu Mare Island and the Iron Gate II Hydroelectric Power Station, respectively to the local border crossing point between ...
* Iron Gate I Hydroelectric Power Station
The Iron Gate I Hydroelectric Power Station ( ro, Porțile de Fier I, sr, Ђердап I/Đerdap I) is the largest dam on the Danube river and one of the largest hydro power plants in Europe. It is located on the Iron Gate gorge, between Romani ...
* List of power stations in Romania
This is a list of the main thermal power plants in Romania which at the end of 2006 had a total generating capacity of 11.335 MW.
Coal/Oil/Gas
Hydroelectric
Nuclear
Wind farms
Solar farms
See also
* Energy in Romania
*List ...
* Energy in Romania
Energy in Romania describes energy and electricity production, consumption and import in Romania.
Romania has significant oil and gas reserves, substantial coal deposits and it has considerable installed hydroelectric power. However, Romania impo ...
* Energy in Serbia
Energy in Serbia describes energy and electricity production, consumption and import in Serbia.
History
On 6 October 1893, the first Serbian power plant, located in the Dorćol urban neighborhood of Belgrade, began production of electricity.
In ...
References
External links
Description
The history of Iron Gate II
{{Crossings navbox
, structure = Bridges/Dams
, place = Danube
The Danube ( ; ) is a river that was once a long-standing frontier of the Roman Empire and today connects 10 European countries, running through their territories or being a border. Originating in Germany, the Danube flows southeast for , p ...
, bridge = Iron Gate II
Ostrovul Mare Bridge
The Ostrovul Mare Bridge is a bridge in Romania over the of the Danube. It is intended for complementary access to the Ostrovu Mare Island and the Iron Gate II Hydroelectric Power Station, respectively to the local border crossing point between ...
, upstream = Iron Gate I
----
'' Trajan's Bridge (historical)''
, downstream = New Europe Bridge
The New Europe Bridge ( bg, Мостът Нова Европа, Mostŭt Nova Evropa; ro, Podul Noua Europă) is a road and rail bridge between the cities of Vidin, Bulgaria, and Calafat, Romania. It is the second bridge on the shared section o ...
Dams in Romania
Dams in Serbia
Elektroprivreda Srbije
Hydroelectric power stations in Romania
Hydroelectric power stations in Serbia
Romania–Serbia border crossings
Dams completed in 1984
Romania–Yugoslavia relations