Heroes Tunnel (formerly West Rock Tunnel) is a , twin-tube tunnel carrying Route 15 (
Wilbur Cross Parkway The Wilbur Cross Parkway (also known locally as "The Merritt" in conjunction with its counterpart) is a limited access road in Connecticut, comprising the portion of Route 15 between Milford and Meriden. It is named after Wilbur Lucius Cross, ...
) through West Rock Ridge in
New Haven, Connecticut New Haven is a city in the U.S. state of Connecticut. It is located on New Haven Harbor on the northern shore of Long Island Sound in New Haven County, Connecticut and is part of the New York City metropolitan area. With a population of 134,023 ...
, opened in 1949. It is the only highway tunnel to pass beneath a natural land feature in
New England New England is a region comprising six states in the Northeastern United States: Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont. It is bordered by the state of New York to the west and by the Canadian provinces ...
, although there are other types of vehicular tunnels in the region. The tunnel was originally named for the mountain through which it passes, but it was renamed Heroes Tunnel in 2003 to honor "heroes of all kinds" in the post- September 11 era. In 2015, the State of Connecticut approved $200 million to fix and expand the tunnel.


Description

Heroes Tunnel is a twin bore tunnel, 1200 feet in length with bores 63 feet center to center, 23-foot roadways flanked by curbs 2 feet 6 inches wide and tile lined side-walls. The side wall contains 1/4-inch in diameter and spaced 4 inches on the center. The pavement in the tunnel extends 50 feet outside of the tunnel walls at each end. It is eight-inch reinforced concrete. 300 watt lights are space on thirty foot centers.


History

Studies were conducted for a tunnel through West Rock on the Wilbur Cross Parkway in the late 1930s. A common problem engineers faced was to project a line as near to New Haven as possible and avoid the rock formations in the area. A route that went west of the mountain through the Bethany gap was struck down due to the Bethany gap being too far inland to serve New Haven. East of the mountain was ruled out as it contained very poor alignment and several properties. It was then decided in 1940 that the shortest and most direct route was through the West Rock mountain. Consultants decided that a tunnel through West Rock would cost $100,000 less than a route around the mountain. World War II would cause temporary abandonment of the project.


Construction

After the tunnel was decided as the best option, workers began to test the character of the rock. A hole was drilled at the summit below the proposed grade. After the tests were complete, the consultants had two plans for the tunnel: A twin bore or a single bore. The final plans were a twin bore tunnel. Work began on the tunnel on March 10th, 1948. The contractors decided first to clear up a workplace and excavate the tubes. The tunnel was designed on an ascending 3% grade west to east. The west portal was worked on first since it was a lower grade. On June 21st, the holes were drilled and the arch section was added shortly after. Operations were handled by two shifts of two crews each. Each drilling crew was made up of twelve drillers, twelve suckers, two scaling miners, and one boss. A 30-inch metal ventilating line was installed in each bore suspended at the height of 7 feet above the tunnel floor. The two tunnels ventilation formed a Y which at the base would contain a 36-inch reversible fan. A concrete ventilation shaft was built which is located midway between the tunnels. There is a control room at the base of the shaft. The fans in the shaft would exhaust bad air from the tunnels and blow it up into the shaft out of one of the four ducts. The fans are controlled by carbon monoxide detectors. The tunnel's lighting system was designed to meet both day and night conditions with lights being located on the center line of the roof. Caution and stop lights were installed for emergency use. Removal of any fire extinguisher would automatically change the lights and start the ventilating fan. One life was lost during the construction of the tunnel. The tunnel opened to traffic on November 1, 1949.