The Humber Gas Tunnel is a natural gas-carrying pipeline that runs underneath the
Humber Estuary The Humber is a large tidal estuary on the east coast of Northern England. It is formed at Trent Falls, Faxfleet, by the confluence of the tidal rivers Ouse and Trent. From there to the North Sea, it forms part of the boundary between the ...
between
Paull Paull (archaic ''Paul'', ''Pall'', ''Pawle'', ''Pawel'', ''Paulle'', ''Paghel'', ''Paghill'', ''Paghil'', ''Pagula'') is a village and civil parish in Holderness, in the East Riding of Yorkshire, England, lying on the north bank of the Humber ...
in the
East Riding of Yorkshire The East Riding of Yorkshire, or simply East Riding or East Yorkshire, is a ceremonial county and unitary authority area in the Yorkshire and the Humber region of England. It borders North Yorkshire to the north and west, South Yorkshire to t ...
, and
Goxhill __NOTOC__ Goxhill is a large village and civil parish in North Lincolnshire, England. The population of the civil parish taken at the 2011 census was 2,290. It is situated east from Barton-upon-Humber and north-west from Immingham. Goxhill ...
in Lincolnshire, England. The project was started in April 2018, and the pipeline was used to transport gas for the first time in December 2020. It is designed to carry 20% of the gas used in the United Kingdom, and is a crucial feeder pipeline to carry gas to the south of England. It is the longest pipe in a tunnel in Europe, and due to being inserted into the tunnel that was deliberately flooded with water, it is the longest hydraulically inserted gas pipeline in the world.


History

In 2009, underwater surveys revealed that the pipeline carrying natural gas between Easington and the south side of the Humber Estuary was at risk of being damaged. The Humber Estuary is the fourth-largest estuary in Great Britain, and the third busiest in terms of shipping. The former pipeline, which was constructed in 1984, was trench-laid on the floor of the estuary, and whilst it was still safe, it was listed on National Grid's "Vulnerable Infrastructure Register", as it was prone to tidal erosion and "third-party impact, both of which could result in catastrophic failure of the pipeline." Although remedial work was undertaken in 2010 and 2012, because the pipeline feeds up to 20% of gas into the
National Transmission System The United Kingdom's National Transmission System (NTS) is the network of gas pipelines that supply gas to about forty power stations and large industrial users from natural gas terminals situated on the coast, and to gas distribution companies th ...
(NTS), a replacement project was devised to enable security of supply. The ''River Humber Gas Pipeline Replacement Order 2016'', was approved in 2016, which gave authority for the National Grid to build a replacement pipe and all ancillary works. The new pipeline would be buried underneath the river in a specially constructed tunnel, and would run parallel to the old pipeline from Paull in the north east to Goxhill in the south west. This would then connect to the existing pipeline to
Hatton Hatton may refer to: Places Canada * Hatton, Saskatchewan England * Hatton, Cheshire West and Chester, a former civil parish * Hatton, Derbyshire * Hatton, Lincolnshire * Hatton, London, in the London Borough of Hounslow * Hatton, Shropshire, a ...
compressor station in Lincolnshire, which in turn supplies gas to the south of England. A tunnel boring machine (TBM), christened ''Mary'', started running north eastwards from Goxhill in Lincolnshire in April 2018. The TBM reached Paull in the East Riding of Yorkshire, 18 months later. The TBM had a diameter of , which allowed for the concrete casing to be inserted on the walls of the new tunnel which consisted of rhomboidal and trapezoidal precast concrete segments thick, and in length. The chalk slurry dug from the chalk beds underneath the Humber was treated and used to remediate a former chalk quarry at Goxhill. The material excavated as part of the tunnelling process was mostly chalk, having dug through the Burnham Chalk and Flamborough Chalk Formations, but with glacial deposits at the north bank near Paull. The pipe is horizontal below the estuary, but the down gradients at each portal are at an incline of 4% for at Paull, and at Goxhill. The pipe was then fitted out and flushed with of pure water to make it ready to receive the new pipeline. On 23 June 2020, the first section was pushed into the tunnel and this continued until 9 July 2020. The pipes were delivered in shorter sections, and then welded out of the tunnel into + sections. Two hydraulic thrust machines inserted the pipes at a rate of into the tunnel, so that the pipe moved into the tunnel, suspended in the water. Rollers were used to move the pipes into the tunnel, and each section end was welded to the start of the new pipe section. The pipe has been designed to last 40 years, whilst the tunnel has been lifed at 120 years. All works above ground will be returned to agricultural use, and aside from the Above Ground Installations (AGIs) at Paull and Goxhill, no evidence of the pipeline or tunnel will be visible on the surface. The pipeline was commissioned and gas started flowing through for the first time in December 2020. It is designed to carry up to 20% of the United Kingdom's gas supply, during peak winter demand. The pipe is the longest pipeline in a tunnel in Europe and is also the longest hydraulically inserted gas pipeline in the world, for which it was awarded a
Guinness World Record ''Guinness World Records'', known from its inception in 1955 until 1999 as ''The Guinness Book of Records'' and in previous United States editions as ''The Guinness Book of World Records'', is a reference book published annually, listing world ...
in November 2020. The project was costed at around the £100 million mark in 2016, but on opening, full works, remediation and the installation of the AGIs (above ground installations), meant the cost was £150 million. Initially,
Ofgem , type = Non-ministerial government department , nativename = , nativename_a = , nativename_r = , logo = Ofgem logo.svg , logo_width = 124px , logo_caption = , seal = , seal_width = , seal_caption = , picture = , picture_widt ...
refused National Grid the authority to pass the cost of the project onto consumers, with Ofgem citing that there was no need to carry out the work, "despite National Grid’s claim that the 3km-long pipeline was at risk of catastrophic failure." By this point in August 2018, National Grid had already spent £90 million on the then estimated £140 million project. Ofgem responded by saying that "National Grid has not demonstrated that the benefits of replacing the pipe outweigh the costs". However, in September 2018, Ofgem changed their view and allowed the National Grid to charge £111 million of the cost to consumers. Initially, National Grid had asked for £140 million, but Ofgem argued that "...the project could have been delivered more efficiently."


Details of pipeline and tunnel

*Length (of tunnel) – *Diameter of TBM – *Diameter of concrete tunnel – *Average depth – *Length of pipes (x 8) – *Diameter of pipes – *Weight of individual pipe sections – *Gas delivery capacity of pipeline – per day.


See also

*
Easington Gas Terminal The Easington Gas Terminal is one of six main gas terminals in the UK, and is situated on the North Sea coast at Easington, East Riding of Yorkshire and Dimlington. The other main gas terminals are at St Fergus Gas Terminal, St Fergus, Aberdeens ...
*
National Transmission System The United Kingdom's National Transmission System (NTS) is the network of gas pipelines that supply gas to about forty power stations and large industrial users from natural gas terminals situated on the coast, and to gas distribution companies th ...