Route
From a junction with theElectrification
This line is long and is not currently electrified. Electrification of the branch was announced in July 2012 and was started in April 2015; as of that time, markings have been placed next to the track where the overhead wire masts are to go and a significant number of trees have been trimmed or removed; re-signalling was also carried out during this time. This is in conjunction with the electrification of theTrain services
The current (2017) passenger train service pattern on the line provides trains at about 30 minute intervals off peak with two through trains, one up and one down, to and from London. The first train out from Henley is at 06:05 and the last train back at 00:18. The Saturday service is also half-hourly until around 20:15, after which a largely hourly service is operated. This is also the case with the Sunday service, with half-hourly services until 19:15.Great Western Railway timetable publicity Additional services are provided during Henley Regatta at the beginning of July, with longer trains. All services are operated byHistory
Henley had long flourished due to its location on the River Thames, and the road bridge there which formed a focus of road traffic. By the seventeenth century it was an established coaching stop, and it was only in the railway age that the dominance of the town was brought into question.Elizabeth Hazeldine, ''Henley-on-Thames Through Time'', Amberley Publishing, Stroud, 2014,First proposals
TheThe railway authorised
The Bill for time extension was presented to Parliament and it received the Royal Assent on 4 August 1853; it included powers to raise additional capital. The line was to be a single line, although bridges and earthworks were to be constructed for later doubling. (This was not actually done.) The track gauge was to be theOpening
The line opened to the public on Monday 1 June 1857.Rex Christiansen, ''A Regional History of the Railways of Great Britain: volume 13: Thames and Severn'', David and Charles, Newton Abbot, 1981 It had cost £79,000 to build (a considerable overspend), and the local people had only subscribed £9,575. The first train was hauled by a 2-4-0T engine named ''Virgo''. The initial timetable allowed for five return trains daily. By 1858 the public timetable showed 7 weekday and 3 Sunday passenger trains each way, and by 1868 the service timetable showed 7 passenger trains and a goods trains every weekday, and on Sundays 4 passenger trains each wayWooden structures
There were three timber viaducts on the line: the most important was the Thames crossing between Wargrave and Shiplake; it was constructed of three main spans of 40 feet using A-frames by which the clearance beneath the truss is maximised. There were 16 approach spans between and span. It was replaced by a masonry and iron structure between 1895 and 1898. Lashbrook Viaduct was in length; it was replaced at the same time as the Thames bridge. WargraveGauge conversion
It was becoming plain that theI found myself at nine o’clock one evening in the company of two permanent way inspectors in a packer’s hut midway between Twyford and Henley. The slopes of the railway were covered with men, but all one could hear was the distant sound of an engine shunting in Henley station yard. At length there came a whistle and we could hear the approaching train, followed by a kind of roar which developed into, "Now, all together, over," with a grunt like a miner's, when he brings his sledge down on the drill. Directly the train had passed, every one was alive. Each inspector had four gangs of five and twenty men in his mile. Two of the twenty five went ahead knocking out the fastening, two pairs followed cutting the transoms which had already been marked, and two more followed the main gang refixing the bolts and straps. By midnight the line on our two miles had been slewed in from 7 feet inches to the 4 feet inches gauge, and we retired to our hut to feed and, as we hoped, to sleep. But not so; one of the inspectors, being of the opinion that if we did not keep awake we should catch cold, threw a fog signal into the fire and we promptly moved out. I then walked towards Twyford, where progress had been slower, as the line was curved and the rails had to be cut in many places. At 4 a.m. we were about again, but there was not sufficient light for an hour to lift and pack the rails, though we managed to get a train through by eight o’ clock.R M Parkinson, writing in the Great Western Railway Magazine, December 1941, reproduced in Maggs, ''The Branch Lines of Oxfordshire''
Development at Henley
In this period Henley was gaining increasing ascendancy as a favourite leisure resort, and also as a residential area. This brought considerable traffic, and began to pose operating difficulties for the railway. In 1881 the platforms at Henley were extended in length, and additional siding accommodation was provided.1890s events
The timber buildings of Shiplake station were destroyed in a disastrous fire on 26 August 1891. The main line in the area had become seriously congested, and an additional two tracks were installed, on the south side of the line. This “quadrupling” was opened for goods trains in November 1892 and for passenger trains on 30 April 1893. In 1894 Henley-in-Arden station (in the West Midlands) was opened, and to avoid confusion, Henley station was renamed Henley-on-Thames from 1 January 1895. There had been some difficulties with the undulating gradient on the line as originally constructed, and in 1895 works were carried out between Twyford and Shiplake to improve matters. In the same year further work was carried out at Henley-on-Thames providing further siding accommodation and extending the platforms, responding to the very considerable increase in patronage as Henley town developed as a Thames resort In July 1896 the decision was taken to double the line, at an estimated cost of £21,275; as part of the work Shiplake station was provided with an island platform. The works were inspected by Colonel York of the Board of Trade on 12 July 1897 and opened as a double line on 14 July 1897, just in time for theTrain services at the end of the nineteenth century
In 1898 a writer described the new train services at Henley:Since May 1st of this year, Henley, until lately on a single-line branch, seems almost to be on a short main line of its own, since no less than seven down trains from London (all fast or semi-fast) now make it their terminal point, with no shunting or delay at Twyford; four up trains, all fast, start from Henley for Paddington. The best of these in each direction is, of course, the new direct express, with no intermediate stop, which now runs seven days a week.There was a down non-stop train leaving Paddington at 10:00 am weekdays, 10:05 am on Sundays, and making the journey in 50 minutes; in the up direction it left Henley at 9:15 pm weekdays, 9:00 pm on Sundays, and with a stop at Westbourne Park made the journey in 52 minutes.
Besides this excellent express and the through trains above-named, through coaches are worked from Paddington on two other trains daily, and also (by a " slip" at Twyford) on Wednesday nights only, by the 12.10 midnight. The 8.50 a.m. up branch train from Henley, which meets a direct fast to Paddington at Twyford, also works through vehicles to London. In the opposite direction there is a through train from Reading at 10.13 a.m., in connection with expresses from Wolverhampton (slip at 9.43) andCheltenham Cheltenham (), also known as Cheltenham Spa, is a spa town and borough on the edge of the Cotswolds in the county of Gloucestershire, England. Cheltenham became known as a health and holiday spa town resort, following the discovery of mineral s ...(slip at 9.56), returning from Henley at 5.55 p.m., "reversing," of course, at Twyford.W J Scott, ''Some Riverside Resorts of the Great Western Railway'', in the Railway Magazine, June 1898
The twentieth century
From 1900 there were further new direct expresses non-stop to and from Paddington in 50 minutes; by 1902 there were five through trains from Paddington, one of them slipped at Twyford. About 20 trains a day ran each way on the branch for most of the twentieth century.Colin G Maggs, ''Branch Lines of Berkshire'', Amberley Publishing , Stroud, 2013, A new station at Wargrave opened on 1 October 1900 with two platforms; a new road from the station site to the village had to be built. The old 45 foot turntable at Henley was proving inadequate as engine dimensions increased, and a new turntable was brought into use in 1903. The station canopies at Henley had been in length, but in 1904 another were added to those on the Up platform.ATC trials
The Great Western Railway developed a system referred to as Automatic train control (ATC). In its developed form it gave drivers an audible and visual indication in the cab of the aspect of a distant signal as it was approached or passed. If a warning was given and not acknowledged by the driver, the train brakes would be applied. Track equipment near the distant signals operated detection equipment on the locomotive. The prototype system was trialled on the Henley branch at the end of 1905. The system was found to be successful, and in due course it was implemented all over the GWR system.Train services
In 1910 there had been twenty passenger trains each way every weekday on the line, and seven on Sundays. By 1922 this had been increased to 34 down and 30 up with 14 and 15 respectively on Sundays. A railmotor service from Reading was introduced in 1914, and later this was changed to an auto-trailer with an 0-4-2T locomotive. The through trains to London were generally worked by main line tender engines, in later years of the Hall or Castle class. The first AEC diesel railcar of the GWR operated some trips on the line on or after 5 February 1934.From 1948
The railways of Great Britain were taken into national ownership in 1948; the former GWR lines were now part ofA new signalling installation, believed to be the first in the world to include electronic interlocking equipment, was brought into use recently at Henley-on Thames... The branch was reduced to single track, with a passing loop at Shiplake in 1961. The line is continuously track circuited, and there are acceptance switches or levers at Twyford, Shiplake, and Henley. The equipment is designed to perform the basic functions of railway signalling apparatus by controlling the interlocking of signals, so that correct distances are maintained between trains that follow or cross or approach each other. This is done by means of computor ictechniques using arrangements of plug-in electronic "bogie" units, in which transistors and magnetic cores perform "logical" switching operations. There are no magnetic relays of conventional type... The installation at Henley is operated from a mosaic-type signalling panel, of the pattern already standard on the Western Region, controlling 36 routes on the "entrance-exit" principle with a switch at the entrance point of the route and a pushbutton at its exit. Track, signal, point, and other miscellaneous indications are also shown on the panel in the usual way. For reasons of economy, all points and facing point locks are worked manually from the existing lever frame, from which all the mechanical interlocking has been removed.''Electronic signalling at Henley-on-Thames'', in Railway Magazine, March 1962The use of steam traction was also being phased out at this time, and the last steam trains ran on the branch on 14 June 1963. This was followed by the elimination of goods traffic, which ended on 7 September 1964. In 1968 the passing loop at Shiplake was removed, and at Henley the platform accommodation was reduced from three to two on 16 March 1969. The station buildings at Henley were now unnecessarily large, and they were demolished in 1975. The present building was erected in 1985, as part of a joint development with Hallmark Cards Ltd; that company erected an office building on part of the site vacated when the railway line was shortened by 200 feet; the new station premises had a single platform. The station buildings at Wargrave and Shiplake were demolished in 1985, being replaced by simple shelters. Network SouthEast introduced the Thames Turbo trains which ply the line. The passenger train service is operated by First Great Western which, since September 2015 has traded as ''Great Western Railway''.
Stations
Stations on the line are: * ; main line station; * ; opened 1 October 1900; * ; * Henley; renamed 1895.M E Quick, ''Railway Passenger Stations in England Scotland and Wales—A Chronology'', The Railway and Canal Historical Society, 2002Regatta Line branding
As is common for branch lines, the ''Regatta Line'' brand has been introduced to ally public awareness of the train services with a tourist/educational stop along its course. The name refers toNotes
References
External links