HOME

TheInfoList



OR:

A hazard and operability study (HAZOP) is a structured and systematic examination of a complex plan or operation in order to identify and evaluate problems that may represent
risk In simple terms, risk is the possibility of something bad happening. Risk involves uncertainty about the effects/implications of an activity with respect to something that humans value (such as health, well-being, wealth, property or the environme ...
s to personnel or equipment. The intention of performing a HAZOP is to review the design to pick up design and engineering issues that may otherwise not have been found. The technique is based on breaking the overall complex design of the process into a number of simpler sections called 'nodes' which are then individually reviewed. It is carried out by a suitably experienced multi-disciplinary team (HAZOP) during a series of meetings. The HAZOP technique is qualitative, and aims to stimulate the imagination of participants to identify potential
hazard A hazard is a potential source of harm Harm is a moral and legal concept. Bernard Gert construes harm as any of the following: * pain * death * disability * mortality * loss of abil ity or freedom * loss of pleasure. Joel Feinberg giv ...
s and operability problems. Structure and direction are given to the review process by applying standardised guide-word prompts to the review of each node. The relevant international standard calls for team members to display 'intuition and good judgement' and for the meetings to be held in 'a climate of positive thinking and frank discussion'. The HAZOP technique was initially developed in the 1960s to analyze major chemical process systems but has since been extended to other areas, including mining operations and other types of process systems and other complex systems such as
nuclear power plant A nuclear power plant (NPP) is a thermal power station in which the heat source is a nuclear reactor. As is typical of thermal power stations, heat is used to generate steam that drives a steam turbine connected to a electric generator, generato ...
operation and software development. It is also used as the basis for reviewing batch processes and operating procedures.


Method

The method is applied to complex 'processes' for which sufficient design information is available, and not likely to change significantly. This range of data should be explicitly identified and taken as the ‘design intent’ basis for the HAZOP study. For example, a prudent designer will have allowed for foreseeable variations within the process creating a larger design envelope than just the basic requirements and the HAZOP will be looking at ways in which this might not be sufficient. For processes plant, the nodes are chosen so that for each a meaningful ''design intent'' can be specified and they are commonly indicated on
piping and instrumentation diagram A piping and instrumentation diagram (P&ID or PID) is a detailed diagram in the process industry which shows the piping and process equipment together with the instrumentation and control devices. Superordinate to the P&ID is the process flow di ...
(P&IDs) and
process flow diagram A process flow diagram (PFD) is a diagram commonly used in chemical and process engineering to indicate the general flow of plant processes and equipment. The PFD displays the relationship between ''major'' equipment of a plant facility and does n ...
(PFD). The extent of each node should be appropriate to the complexity of the system and the magnitude of the hazards it might pose. However, it will also need to balance between "too large and complex" (fewer nodes, but the team members may not be able to consider issues within the whole node at once) and "too small and simple" (many trivial and repetitive nodes, each of which has to be reviewed independently and documented). For each node in turn the HAZOP team uses a list of standardised guide-words and process parameters to identify potential ''Deviations'' from the design intent. For each deviation, the team identifies feasible ''Causes'' and likely ''Consequences'' then decides (with confirmation by subsequent risk analysis where necessary) whether the existing safeguards are sufficient, or whether an ''Action'' to install an additional safeguard is necessary to reduce the risks to an acceptable level. The degree of preparation for the HAZOP is critical to the overall success of the review - 'frozen' design information provided to the team members with time for them to familiarise themselves with the process, an adequate schedule allowed for the performance of the HAZOP, provision of the best team members for their role. Those scheduling a HAZOP should take into account the review scope, the number of nodes to be reviewed, the provision of completed design drawings and documentation and the need to maintain team performance over an extended time-frame. The team members may also need to perform some of their normal tasks during this period and the HAZOP team members can tend to lose focus unless adequate time is allowed for them to refresh their mental capabilities. The team meetings should be managed by an independent, trained HAZOP Facilitator who is responsible for the overall quality of the review, partnered with a dedicated Scribe to minute the meetings. "The success of the HAZOP study strongly depends on the alertness and concentration of the team members and it is therefore important that the sessions are of limited duration and that there are appropriate intervals between sessions. How these requirements are achieved is ultimately the responsibility of the study leader." For a medium-sized chemical plant where the total number of items to be considered is 1200 (items of equipment and pipes or other transfers between them) about 40 such meetings would be needed.Swann, C. D., & Preston, M. L., (1995) ''Journal of Loss Prevention in the Process Industries'', vol 8, no 6, pp349-353 "Twenty-five years of HAZOPs" Various software programs are now available to assist in meetings.


Guide words and parameters

In order to identify deviations, the team applies (systematically, in order ) a set of Guide Words to each node in the process. To prompt discussion, or to ensure completeness, it may also be helpful to explicitly consider appropriate parameters which apply to the design intent. These are general words such as Flow, Temperature, Pressure, Composition. The current standardBritish Standard BS: IEC61882:2002 ''Hazard and operability studies (HAZOP studies)- Application Guide''
British Standards Institution The British Standards Institution (BSI) is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to business ...
. "This British Standard reproduces verbatim IEC 61882:2001 and implements it as the UK national standard."
notes that Guide Words should be chosen which are appropriate to the study and neither too specific (limiting ideas and discussion) nor too general (allowing loss of focus). A fairly standard set of Guide Words (given ''as an example'' in Table 3 of ) is as follows: (The last five guide words are applicable to batch or sequential operations.) Where a guide word is meaningfully applicable to a parameter e.g. NO FLOW, MORE TEMPERATURE, their combination should be recorded as a credible potential deviation (from the design intent) that requires review. HAZOP-type studies may also be carried out by considering applicable guide words and identifying elements to which they are applicable or by considering the parameters associated with plant elements and systematically applying guide words to them; although this last approach is not mentioned in the relevant standard, its examples of output include a study (B3) recorded in this way. The following table gives an overview of commonly used guide word - parameter pairs and common interpretations of them. Once the causes and effects of any potential hazards have been established, the system being studied can then be modified to improve its safety. The modified design should then be subject to another HAZOP, to ensure that no new problems have been added. The ''technique'' can also be applied where design information is not fully available and doing so may be useful in eliminating alternative designs, before too much time is invested in them. However, where a design is required to have a HAZOP performed to meet legislative or regulatory requirements, such an 'early' meeting cannot be considered to comply with this requirement. "The term HAZOP has been often associated, in a generic sense, with some other hazard identification technique. The use of the term with such techniques is considered to be inappropriate and is excluded from this document."


Team

A HAZOP study is a team effort. The team should be as small as possible consistent with their having relevant skills and experience A minimum team size of 4-5 Nolan, D.P. (1994) ''Application of HAZOP and What-If Safety Reviews to the Petroleum, Petrochemical and Chemical Industries''. William Andrew Publishing/Noyes. is recommended. In a large process there will be many HAZOP meetings and the individuals within the team may change as different specialists are required and deputies are required for the various roles. As many as 20 individuals may be involved but is recommended that the team should not exceed 7-8 at any time (a larger team will make slower progress adding considerably to the costs). Each team member should have a definite role as follows Note that duplication of roles (e.g. Client, Contractor & Project Management representatives) should be avoided: In earlier publications it was suggested that the Study Leader could also be the RecorderKletz, T. A., (1983) ''HAZOP & HAZAN Notes on the Identification and Assessment of Hazards'' IChemE Rugby but separate roles are now generally recommended. The use of computers and projector screens can enhance the recording of meeting minutes (the team can see what is minuted and ensure that it is accurate), the display of P&IDs for the team to review, the provision of supplemental documented information to the team and the logging of non-HAZOP issues that may arise during the review, e.g. drawing/document corrections and clarifications. Specialist software is now available from several suppliers to support the recording of meeting minutes and tracking the completion of recommended actions.


History

Although a number of companies were addressing this issue, the technique is generally considered to have originated in the Heavy Organic Chemicals Division of Imperial Chemical Industries (ICI), which was then a major British and international chemical company. The history has been described by
Trevor Kletz Trevor Asher Kletz, OBE, FREng, FRSC, FIChemE (23 October 1922–31 October 2013) was a prolific British author on the topic of chemical engineering safety. He is credited with introducing the concept of inherent safety, and was a major promo ...
Kletz, T., (2000) ''By Accident - a life preventing them in industry'' PVF Publications who was the company's safety advisor from 1968 to 1982, from which the following is abstracted. In 1963 a team of 3 people met for 3 days a week for 4 months to study the design of a new
phenol Phenol (also called carbolic acid) is an aromatic organic compound with the molecular formula . It is a white crystalline solid that is volatile. The molecule consists of a phenyl group () bonded to a hydroxy group (). Mildly acidic, it req ...
plant. They started with a technique called ''critical examination'' which asked for alternatives, but changed this to look for deviations. The method was further refined within the company, under the name ''operability studies'', and became the third stage of its
hazard analysis A hazard analysis is used as the first step in a process used to assess risk. The result of a hazard analysis is the identification of different types of hazards. A hazard is a potential condition and exists or not (probability is 1 or 0). It may, ...
procedure (the first two being done at the conceptual and specification stages) when the first detailed design was produced. In 1974 a one-week safety course including this procedure was offered by the
Institution of Chemical Engineers The Institution of Chemical Engineers (IChemE) is a global professional engineering institution with over 33,000 members worldwide. It was founded in 1922 and awarded a Royal Charter in 1957. It has offices in Rugby, London, Melbourne, Wellingto ...
(IChemE) at
Teesside Polytechnic , mottoeng = Deeds Not Words , established = 1930 – Constantine Technical College1969 – as Teesside Polytechnic 1992 – gained university status , type = Public , endowment = £0.23 m (2019/20) , chancellor ...
. Coming shortly after the Flixborough disaster, the course was fully booked, as were ones in the next few years. In the same year the first paper in the open literature was also published. In 1977 the
Chemical Industries Association The Chemical Industries Association (CIA) is the leading national trade association representing and advising chemical and pharmaceutical companies located across the United Kingdom. Chemicals manufacturing in the UK is largely concentrated i ...
published a guide.Chemical Industries Association (1977) ''A Guide to Hazard and Operability Studies'' Up to this time the term HAZOP had not been used in formal publications. The first to do this was Kletz in 1983, with what were essentially the course notes (revised and updated) from the IChemE courses. By this time, hazard and operability studies had become an expected part of
chemical engineering Chemical engineering is an engineering field which deals with the study of operation and design of chemical plants as well as methods of improving production. Chemical engineers develop economical commercial processes to convert raw materials int ...
degree courses in the UK.


See also

*
Hazard analysis A hazard analysis is used as the first step in a process used to assess risk. The result of a hazard analysis is the identification of different types of hazards. A hazard is a potential condition and exists or not (probability is 1 or 0). It may, ...
*
Hazard analysis and critical control points Hazard analysis and critical control points, or HACCP (), is a systematic preventive approach to food safety from biological, chemical, and physical hazards in production processes that can cause the finished product to be unsafe and designs mea ...
*
HAZID A hazard analysis is used as the first step in a process used to assess risk. The result of a hazard analysis is the identification of different types of hazards. A hazard is a potential condition and exists or not (probability is 1 or 0). It may, ...
* Process safety management *
Risk assessment Broadly speaking, a risk assessment is the combined effort of: # identifying and analyzing potential (future) events that may negatively impact individuals, assets, and/or the environment (i.e. hazard analysis); and # making judgments "on the to ...
*
Safety engineering Safety engineering is an engineering discipline which assures that engineered systems provide acceptable levels of safety. It is strongly related to industrial engineering/systems engineering, and the subset system safety engineering. Safety en ...
*
Workplace safety standards Workplace safety standards are sets of standards, aimed at safety at workplaces and to reduce occupational risk from occupational illnesses. History The Russian scientist Mikhail Lomonosov in 1763 first describes the dangers of mining in his ...


Notes


References


Further reading

* *
Gould, J., (2000) ''Review of Hazard Identification Techniques'', HSE
*http://www.uscg.mil/hq/cg5/cg5211/docs/RBDM_Files/PDF/RBDM_Guidelines/Volume%203/Volume%203-Chapter%2010.pdf

Explanation by a software supplier * * Potential problems with HAZOPs (authors sell HAZOP expertise, so presumably some promotional intent, but the issues described are genuine/recognisable) *https://www.bureauveritas.co.uk/industrial-risk-management/workshop-facilitation/hazard-and-operability-study-hazop
HAZOP Explained
from Primatech, Inc.
''HAZOP Fundamentals''
a White Paper from Primatech Inc. 2018. {{DEFAULTSORT:Hazard And Operability Study Process safety Safety Safety engineering