Harmony Link is a planned
submarine power cable A submarine power cable is a transmission cable for carrying electric power below the surface of the water.Lithuania Lithuania (; lt, Lietuva ), officially the Republic of Lithuania ( lt, Lietuvos Respublika, links=no ), is a country in the Baltic region of Europe. It is one of three Baltic states and lies on the eastern shore of the Baltic Sea. Lithuania ...
and
Poland Poland, officially the Republic of Poland, is a country in Central Europe. It is divided into 16 administrative provinces called voivodeships, covering an area of . Poland has a population of over 38 million and is the fifth-most populous ...
. The purpose of the cable is to finish the transition of the
Baltic states The Baltic states, et, Balti riigid or the Baltic countries is a geopolitical term, which currently is used to group three countries: Estonia, Latvia, and Lithuania. All three countries are members of NATO, the European Union, the Eurozone, ...
from
IPS/UPS The IPS/UPS is a wide area synchronous transmission grid of some CIS countries, with a common mode of operation and centralized supervisory control. It has an installed generation capacity of 300 gigawatts, and produces 1,200 terawatt-hour ...
to the
synchronous grid of Continental Europe The synchronous grid of Continental Europe (also known as Continental Synchronous Area; formerly known as the UCTE grid) is the largest synchronous electrical grid (by connected power) in the world. It is interconnected as a single phase-locked ...
.


History

On 21 December 2018 Lithuanian electricity grid operator
Litgrid Litgrid AB is a Lithuanian electricity transmission system operator that operates Lithuania's electricity transmission grid. Litgrid is responsible for the integration of the Lithuanian electricity system into the European electricity infrastruct ...
and Polish electricity grid operator
PSE PSE may refer to: Companies and organizations Stock exchanges *Pacific Stock Exchange, stock exchange in USA * Pakistan Stock Exchange, stock exchange of Pakistan * Palestine Securities Exchange, stock exchange in Palestine * Philippine Stock ...
signed agreement in order to start planning the cable. Project given official name Harmony Link. Construction works expected to start in 2023 and finish in 2025.


About the project

Harmony Link will connect the Zarnowiec substation in the Pomeranian region of Poland with the Darbenai substation in the Kretinga region of Lithuania. The key component of the interconnector is a 700 MW High Voltage Direct Current (HVDC) cable. The power link will be about 330 km long, of which about 290 km will be the offshore part. Construction of the interconnector is expected to be completed in 2025.


Financing

The total investment planned for the Harmony Link project is around €680 million, of which €493 million will come from the Connecting Europe Facility.


See also

*
Energy in Lithuania Lithuania is a net energy importer. Primary energy use in Lithuania was 98 TWh, or 29 TWh per million people in 2009.
*
Electricity sector in Sweden Majority of electricity production in Sweden relies on hydro power and nuclear power. In 2008 the consumption of electricity in Sweden was per capita, compared to EU average per capita.Baltic Cable The Baltic Cable is a monopolar HVDC power line running beneath the Baltic Sea that interconnects the electric power grids of Germany and Sweden. Its maximum transmission power is 600 megawatts (MW). The Baltic Cable uses a transmission voltag ...
, cable between Germany and Sweden * Konti-Skan, cable between Denmark and Sweden *
Estlink Estlink is a set of HVDC submarine power cables between Estonia and Finland. Estlink 1 is the first interconnection between the Baltic and Nordic electricity markets followed by Estlink 2 in 2014. The main purpose of the Estlink connection is to ...
, cable between Estonia and Finland * Fenno-Skan, cable between Finland and Sweden *
LitPol Link LitPol Link is an electricity link between Poland and Lithuania which connects the Baltic transmission system to the synchronous grid of Continental Europe. It has a capacity of 500 MW and since 2021 it can operate in a synchronous regime. ...
, cable between Lithuania and Poland *
NordBalt NordBalt (also formerly known as SwedLit) is a submarine power cable between Klaipėda in Lithuania and Nybro in Sweden. The purpose of the cable is to facilitate the trading of power between the Baltic and Nordic electricity markets, and to inc ...
, subsea cable between Lithuania and Sweden * SwePol, cable between Poland and Sweden


References


External links


Litgrid