Hardy Dam (or Hardy Hydroelectric Plant) is an earth-filled
embankment dam An embankment dam is a large artificial dam. It is typically created by the placement and compaction of a complex semi-plastic mound of various compositions of soil or rock. It has a semi-pervious waterproof natural covering for its surface and ...
and
powerplant Propulsion is the generation of force by any combination of pushing or pulling to modify the translational motion of an object, which is typically a rigid body (or an articulated rigid body) but may also concern a fluid. The term is derived from ...
complex on the
Muskegon River Muskegon River is a river in the western portion of the lower peninsula of the U.S. state of Michigan. The river source is located at Houghton Lake in Roscommon County, flowing out of the North Bay into neighboring Missaukee County. The river pa ...
in Big Prairie Township,
Newaygo County Newaygo County ( ) is a county in the U.S. state of Michigan. As of the 2020 United States Census, the population was 49,978. The county seat is White Cloud. The county was created in 1840, and was organized in 1851. It was either named for an ...
,
Michigan Michigan () is a state in the Great Lakes region of the upper Midwestern United States. With a population of nearly 10.12 million and an area of nearly , Michigan is the 10th-largest state by population, the 11th-largest by area, and the ...
. At the time of its completion, it was the largest earthen dam in North America east of the Mississippi. Its impoundment forms a lake with over 50 miles of shoreline. The dam impounds a reservoir with a surface area of 4,000 acres (1,618 ha) and its power plant has an installed capacity of 31.5 MW.


History

After considerable investigation and planning by
Consumers Energy Consumers Energy is an investor owned utility that provides natural gas and electricity to 6.7 million of Michigan's 10 million residents. It serves customers in all 68 of the state's Lower Peninsula counties. It is the primary subsidiary of C ...
in the 1920s, construction on the Hardy Dam began in 1929. It was designed by William G. Fargo and construction was carried out by his company, Fargo Engineering. Large amounts of concrete were placed into the foundation as solid bedrock was not present, particularly in the streambed. Allied Engineers began constructing the power plant in the autumn of 1929. In August 1930 the Muskegon River was diverted through the power plant
penstocks A penstock is a sluice or gate or intake structure that controls water flow, or an enclosed pipe that delivers water to hydro turbines and sewerage systems. The term is inherited from the earlier technology of mill ponds and watermills. Hyd ...
and away from the dam construction site. The embankment of the dam was filled by March 1931 using the semi
hydraulic Hydraulics (from Greek: Υδραυλική) is a technology and applied science using engineering, chemistry, and other sciences involving the mechanical properties and use of liquids. At a very basic level, hydraulics is the liquid counter ...
method of construction. About of sand and gravel was used in the dam. Both the dam and power plant were complete by the end of 1931. Construction was carried out under the direction of Edward M. Burd, the head of civil engineering for Commonwealth Power Corporation, a subsidiary of Consumers. The dam and power plant are named for George E. Hardy, a financial partner with Anton Hodenpyl. Hardy and Hodenpyl (who also had a dam named after him) oversaw the
Commonwealth & Southern Corporation The Commonwealth & Southern Corporation was a New York City-based United States electric utility holding company. The company was incorporated in 1929, and it initially contained three other electric utility holding companies: the Commonwealth Power ...
holding company that Consumers Energy, was part of from 1910 through the 1920s. A serious flood in September 1986 raised the reservoir above the emergency
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure tha ...
. Water seeped through joints and underneath the spillway creating voids that were later filled with grout. Hardy was listed in the
National Register of Historic Places The National Register of Historic Places (NRHP) is the United States federal government's official list of districts, sites, buildings, structures and objects deemed worthy of preservation for their historical significance or "great artistic v ...
on Dec. 1, 1997. The listing notes the Spanish Colonial architecture of the powerplant buildings, including the oil house, intake, dormitory and powerhouse. In December 2008, the rehabilitation of Unit 3's
Francis turbine The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency. The proces ...
began. The original 10 MW runner was replaced with one which increased the unit's installed capacity by 1.5 MW. Unit 3 entered back into service on 3 March 2009.


Historical marker text

''Constructed from 1929 to 1931, on a site once known as the Oxbow, the Hardy Hydroelectric Plant was built by Consumers Power Company. The plant was named for George Hardy, a partner in the firm that financed Consumers' projects from 1911 through 1928. The complex includes a Spanish Colonial Revival-style powerhouse and intake tower, an oil house, and a dormitory. It originally included four operator's houses on the eastern bank of the pond, which were Sears-Roebuck kit homes. Due to advancements in fossil fuel steam generating plants, this was the last conventional hydroelectric plant built by Consumers. The Hardy plant is listed in the National Register of Historic Places.''text of marker, marker data from


Recreation

Approximately 2,000 campsites, several boat launches and a marina are located around the dam. The parks located on the impoundment lake of the Hardy Dam include, Newaygo County's Sandy Beach Park, Newaygo State Park, Mecosta County's Brower Park, and Big Prairie Township's Ox Bow Park and Big Bend Park. The reservoir offers excellent fishing and a nature trail system regarded as one of the best. The three mile unpaved path parallels the Muskegon River and contains 26 different trees with identification plaques. The trail area is home to wild turkeys, grouse and bald eagles as well as beaver, mink and otter. Fishing includes salmon, steel head, rainbow trout, brown trout, walleye, bass, perch and other pan fish.


The Muskegon dam system

The three dams,
Rogers Rogers may refer to: Places Canada *Rogers Pass (British Columbia) * Rogers Island (Nunavut) United States * Rogers, Arkansas, a city * Rogers, alternate name of Muroc, California, a former settlement * Rogers, Indiana, an unincorporated communit ...
, Hardy, and Croton (all owned and operated by Consumers Energy), are operated in different modes but in concert give a net
run of river Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectricity, hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all ...
effect on water flow. The Rogers itself has little or no impoundment and runs in run of river mode, passing through as much water as it receives. The Croton and Hardy work in concert. The Hardy, which has a larger capacity reservoir, larger turbines, and is upstream of the Croton, runs in full peaking mode, meaning that the river flow is impounded and used to generate electricity during peak demand periods. This causes wide fluctuations in water flows and reservoir levels, typically with low outflow during the night when power demand is lowest. Full peaking was once very common but because of the outflow fluctuations, is now less common. However, with the Croton immediately downstream, and with no river segment (the Croton impoundment stretches back to the Hardy outlet), it can be run in re-regulation mode, allowing a natural flow rate to exit. The Croton reservoir level fluctuates inversely with the Hardy, rising during the day and lowering at night. Since the Hardy reservoir is so large, its reservoir level fluctuates about in total, while the Croton reservoir fluctuates about . During the winter and spring runoff, the Hardy is allowed to fluctuate much more. It can be drawn down up to to meet winter power demand but is required to return to normal levels by the end of April each spring. Together, the three dams of the Muskegon River (Rogers, Hardy and Croton) can generate about 45,500 kilowatts, with about 30,000 of that from Hardy, which is enough electricity to serve a community of nearly 23,000.


See also

*
Big Prairie Township, Michigan Big Prairie Township is a civil township of Newaygo County in the U.S. state of Michigan. As of the 2020 census, the township population was 2,436. History Big Prairie Township was organized in 1852. Geography The Hardy Dam on the Muskegon Rive ...
where the dam is located *
Big Rapids, Michigan Big Rapids is a city in the U.S. state of Michigan. The population was 10,601 at the 2010 census. It is the county seat of Mecosta County. The city is located within Big Rapids Township, but it is politically independent. Big Rapids is home o ...
the nearest major city * List of Registered Historic Places in Newaygo County, Michigan


References


External links

*
Historic American Engineering Record Heritage Documentation Programs (HDP) is a division of the U.S. National Park Service (NPS) responsible for administering the Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER), and Historic American Landscapes ...
(HAER) documentation, filed under 6928 East Thirty-sixth Street, Newaygo, Newaygo County, MI: ** ** ** ** ** ** ** **
Newaygo County Department of Parks and RecreationNewaygo State ParkBig Prairie Township ParksRiver Country Chamber of Commerce of Newaygo CountyConsumers Energy
{{Webarchive, url=https://web.archive.org/web/20081121013020/http://www.consumersenergy.com/ , date=2008-11-21 Buildings and structures in Newaygo County, Michigan Historic American Engineering Record in Michigan Hydroelectric power plants in Michigan Michigan State Historic Sites Energy infrastructure completed in 1931 Dams in Michigan Consumers Energy dams Dams on the National Register of Historic Places in Michigan Earth-filled dams 1931 establishments in Michigan Dams completed in 1931 National Register of Historic Places in Newaygo County, Michigan