History
The Hainan western ring railway was constructed in two stages. The first short section connects the existing Sanya railway station with the new Sanya Phoenix Airport railway station, to the west. The section has one intermediate station, Sanya West railway station (). The construction work on this section () was completed by the end of 2014, but that apparently did not happen. On the rest of the railway - the much longer section from Sanya Phoenix Airport to Haikou - progress as of 2012 was still in its preliminary phase. Property was acquired, and demolition was conducted. According to the construction plans, 22,300 '' mu'' () of land will be permanently used by the railway and associated facilities, and another 8,800 ''mu'' () was temporary used during construction. Eighty-seven thousand m2 of housing will be demolished. The necessary demolitions were completed by the end of 2013.Stations
As of 2018, many of the stations are not in use. The list below names the settlements where the stations are located. They will be named correspondingly. * Haikou railway station * Laochengzhen railway station * Fushanzhen railway station * Lingao South railway station * Yintan railway station * Baimajing railway station * Haitou railway station * Qiziwan railway station * Dongfang railway station * Jinyuewan railway station * Jianfeng railway station * Huangliu railway station * Ledong railway station * Yazhou railway station * Sanya Phoenix Airport railway station * Sanya railway stationRolling stock
* CRH1A-A 8-car sets (since December 30, 2015) * CR300-AF 8-car sets (since February 1, 2021)Notes
External links
{{Hainan topics High-speed railway lines in China Railway lines opened in 2015 Standard gauge railways in China Transport in Hainan Airport rail links in China