HOME

TheInfoList



OR:

Guru Gobind Singh Super Thermal Power Plant is located at Ghanauli near
Ropar Rupnagar (; formerly known as Ropar is a city and a municipal council in Rupnagar district in the Indian state of Punjab. Rupnagar is a newly created fifth Divisional Headquarters of Punjab comprising Rupnagar, Mohali, and its adjoining distr ...
in Punjab. The power plant is one of the
coal Coal is a combustible black or brownish-black sedimentary rock, formed as rock strata called coal seams. Coal is mostly carbon with variable amounts of other elements, chiefly hydrogen, sulfur, oxygen, and nitrogen. Coal is formed when dea ...
based power plants of
PSPCL Punjab State Power Corporation Limited (PSPCL) is the electricity generating and distributing company of the Government of Punjab state in India. It was formerly known as Punjab State Electricity Board (PSEB) which was unbundled by the governm ...
.


Power plant

Guru Gobind Singh Super Thermal Power Station is situated near village Ghanauli on Ropar-Kiratpur Sahib National highway NH-21. It is about 12 km from Ropar and 55 km from
Chandigarh Chandigarh () is a planned city in India. Chandigarh is bordered by the state of Punjab to the west and the south, and by the state of Haryana to the east. It constitutes the bulk of the Chandigarh Capital Region or Greater Chandigarh, which al ...
. The plant has an installed capacity of 1260 MW. The first unit was commissioned in September, 1984. During March 1985, the second unit was commissioned and in later years four more units were added. The station received the Incentive award for reducing
fuel oil Fuel oil is any of various fractions obtained from the distillation of petroleum (crude oil). Such oils include distillates (the lighter fractions) and residues (the heavier fractions). Fuel oils include heavy fuel oil, marine fuel oil (MFO), bun ...
consumption in 1999. The station also received the Shield and excellent performance by
Prime minister of India The prime minister of India (IAST: ) is the head of government of the Republic of India. Executive authority is vested in the prime minister and their chosen Council of Ministers, despite the president of India being the nominal head of the ...
during 1986-87 for achieving 70.08% PLF against then 53.2%. The plant has its source of water supply from Nangal Hydel Channel. The coal used mainly comes from mines in Bihar, West Bengal and Madhya Pradesh from more than 50 sources called collieries


Installed capacity

It has an installed capacity of 1260 MW. But now total output left is 840 MW. The proposal to shut down the thermal power plant has been under consideration of the Government of Punjab. Another proposal is to build five supercritical thermal power plants of 800 MW each, which will replace the existing power units.


References

Coal-fired power stations in Punjab, India Rupnagar district Memorials to Guru Gobind Singh Energy infrastructure completed in 1984 1984 establishments in Punjab, India 20th-century architecture in India {{India-powerstation-stub