The Gove Dam is an
embankment dam on the
Kunene River about south of
Huambo
Huambo, formerly Nova Lisboa (English: ''New Lisbon''), is the third-most populous city in Angola, after the capital city Luanda and Lubango, with a population of 595,304 in the city and a population of 713,134 in the municipality of Huambo (Cens ...
in
Huambo Province
Huambo is a province of Angola. With an area of 34,270 km2, it is one of the geographically smaller provinces, situated in the Central Region approximately 450 km south east of the capital, Luanda.
The province had a population of 2,01 ...
,
Angola
, national_anthem = " Angola Avante"()
, image_map =
, map_caption =
, capital = Luanda
, religion =
, religion_year = 2020
, religion_ref =
, coordina ...
. The purpose of the dam is to control floods and generate
hydroelectric power. It has a power generating capacity of each) (three turbines of each), enough to power over 30,000 homes.
History
The Gove Dam cost US$279 million and was built by Brazilian construction group
Odebrecht
Odebrecht S.A. (), officially known as Novonor, is a Brazilian conglomerate, headquartered in Salvador, Bahia, Brazil, consisting of diversified businesses in the fields of engineering, construction, chemicals and petrochemicals. The company w ...
. It was formally inaugurated in August 2012 by the Angolan President. The dam produces power for the cities of
Caála
Caála is a town and a municipality located 23 km west of the city of Huambo, in the namesake province in Angola. It was known as Vila Robert Williams while Angola was a Portuguese colony, after the famous railroad developer and mining magna ...
,
Huambo
Huambo, formerly Nova Lisboa (English: ''New Lisbon''), is the third-most populous city in Angola, after the capital city Luanda and Lubango, with a population of 595,304 in the city and a population of 713,134 in the municipality of Huambo (Cens ...
, and
Kuito.
Construction of the dam began in 1969 and it was completed in 1975. Construction of the power station was halted twice, from 1975 to 1983 due to the
civil war
A civil war or intrastate war is a war between organized groups within the same state (or country).
The aim of one side may be to take control of the country or a region, to achieve independence for a region, or to change government policies ...
, then again from 1986 to 2001 also due to fighting. The dam was partially destroyed by dynamite in 1990. Along with the power station, sub-stations at Caála, Dango, and Benfica (in Huambo) were inaugurated at the time of completion. The sub-stations and distribution network cost US$80 million.
See also
*
Ruacana Power Station
The Ruacana Hydroelectric Power Station is a hydroelectric power plant near Ruacana in northwest Namibia, close to the Angolan border. Commissioned in 1978, it is by far the largest power station in Namibia. Its operator is NamPower, the Namibia ...
– downstream in Namibia, built in conjunction with the Gove Dam
References
{{reflist
Dams completed in 1975
Energy infrastructure completed in 2012
Gove
Hydroelectric power stations in Angola
Huambo Province
2012 establishments in Angola
Embankment dams
1975 establishments in Angola