Gold Line (CapMetro)
   HOME

TheInfoList



OR:

The Gold Line is a proposed transitway for connecting North Central Austin and the Downtown's Eastside to South Austin. It is in the planning stages as a part of Capital Metro's
Project Connect Project Connect (listed as Proposition A on the General Election ballot) is a transit expansion program by the Capital Metropolitan Transportation Authority (Capital Metro) in Austin, Texas, U.S. The program was approved by voters on November 3, ...
. According to the plan, the line will be initially be operated as a
bus rapid transit Bus rapid transit (BRT), also called a busway or transitway, is a bus-based public transport system designed to have much more capacity, reliability and other quality features than a conventional bus system. Typically, a BRT system includes ...
line prior to future conversion to light rail. It is estimated to open in 2024. The initial line is in length and would operate from
ACC ACC most often refers to: * Atlantic Coast Conference, an NCAA Division I collegiate athletic conference located in the US *American College of Cardiology, A US-based nonprofit medical association that bestows credentials upon cardiovascular spec ...
Highland to the South Congress Transit Center park-and-ride, and will travel on Airport, Red River, San Jacinto/Trinity, 7th/8th, Neches/Red River, 4th, Riverside, and South Congress. Stations will be ACC
Highland Highlands or uplands are areas of high elevation such as a mountainous region, elevated mountainous plateau or high hills. Generally speaking, upland (or uplands) refers to ranges of hills, typically from up to while highland (or highlands) is ...
, Clarkson, Hancock, St. David's, UT East, Medical School, Capitol East, Trinity, Downtown Station (where transfer to the Red, Green, or Blue Lines will be possible), Republic Square, Auditorium Shores, SoCo (South Congress), Oltorf, St. Edward's, and South Congress Transit Center. The line was originally envisioned as the northern section of the Blue Line light rail, which was part of the city's failed 2014 rail plan. The line was there after planned to be built as lower-cost bus rapid transit. The project shifted planning in May 2020 to again construct it as light rail, citing a demographic that showed an increased projected ridership along the route. In July 2020, to lower construction costs in response to the economic crisis caused by the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identif ...
, the plan was reverted to the line being constructed as a bus service.


References


External links


Map and fact sheet A

Fact sheet B
* Bus rapid transit in Texas Rail transportation in Austin, Texas Transportation in Travis County, Texas Capital Metro Proposed railway lines in Texas {{Austin-stub