HOME

TheInfoList



OR:

The Gold Coast Desalination Plant is a
reverse osmosis Reverse osmosis (RO) is a water purification process that uses a partially permeable membrane to separate ions, unwanted molecules and larger particles from drinking water. In reverse osmosis, an applied pressure is used to overcome osmotic pre ...
,
water desalination Desalination is a process that takes away mineral components from saline water. More generally, desalination refers to the removal of salts and minerals from a target substance, as in soil desalination, which is an issue for agriculture. Salt ...
plant located in Bilinga, a seaside suburb of the
Gold Coast Gold Coast may refer to: Places Africa * Gold Coast (region), in West Africa, which was made up of the following colonies, before being established as the independent nation of Ghana: ** Portuguese Gold Coast (Portuguese, 1482–1642) ** Dutch G ...
, in
Queensland ) , nickname = Sunshine State , image_map = Queensland in Australia.svg , map_caption = Location of Queensland in Australia , subdivision_type = Country , subdivision_name = Australia , established_title = Before federation , established_ ...
, Australia. It supplies water to the
South East The points of the compass are a set of horizontal, radially arrayed compass directions (or azimuths) used in navigation and cartography. A compass rose is primarily composed of four cardinal directions—north, east, south, and west—each se ...
Queensland ) , nickname = Sunshine State , image_map = Queensland in Australia.svg , map_caption = Location of Queensland in Australia , subdivision_type = Country , subdivision_name = Australia , established_title = Before federation , established_ ...
region via the
South East Queensland Water Grid The SEQ Water Grid is a region-wide, long term, water supply scheme that provides a sustainable water infrastructure network for the South East region of Queensland, Australia. The project was the largest urban response to the drought in Australi ...
. The plant first supplied water to the grid in February 2009. It is owned by
Seqwater Seqwater is a statutory authority of the Government of Queensland that provides bulk water storage, transport and treatment, water grid management and planning, catchment management and flood mitigation services to the South East Queensland reg ...
and operated by Veolia. As of Summer 2020/2021, the plant is operating at maximum production capacity.


Project rationale and background

Water supplies in
South East Queensland South East Queensland (SEQ) is a bio-geographical, metropolitan, political and administrative region of the state of Queensland in Australia, with a population of approximately 3.8 million people out of the state's population of 5.1 million. T ...
reached very low levels during Australia's '
Millennium drought The 2000s drought in Australia, also known as the Millennium drought is said by some to be the worst drought recorded since European settlement. This drought affected most of southern Australia, including its largest cities and largest agricul ...
', primarily from 2003 to 2009. The region's major water storages reached around 50% of capacity in mid-2005 and 20% in mid-2007. In response to this worsening situation a range of water infrastructure projects were proposed to bolster supplies in south east Queensland. The
Gold Coast City Council The City of Gold Coast is the local government area spanning the Gold Coast, Queensland, Australia and surrounding areas. With a population of 606,774 it is the second most populous local government area in Australia (City of Brisbane being the ...
initially developed a plan for a 55 ML/day desalination plant during 2005., which was anticipated to cost around $260 million. Due to worsening drought conditions, in 2006 the
Queensland Government The Queensland Government is the democratic administrative authority of the Australian state of Queensland. The Government of Queensland, a parliamentary constitutional monarchy was formed in 1859 as prescribed in its Constitution, as amended fr ...
joined with the Gold Coast to expand the plan to a 133 ML/day plant that could share output with the entire region. The Queensland Government contributed $869 million to the expanded project, which was to be developed through a 50:50 joint venture.


Design and construction

The construction process was led by a group known as the Gold Coast Desalination Alliance. It consists of
Veolia Water Veolia Water (formerly Vivendi Water, originally Compagnie Générale des Eaux) is the water division of the French company Veolia Environnement and the world's largest supplier of water services. In 2009, the group posted revenues of €12.5 ...
,
John Holland Group The John Holland Group is an infrastructure, building, rail and transport business operating in Australia and New Zealand. Headquartered in Melbourne, it is a subsidiary of China Communications Construction. History The company was founded in ...
,
Sinclair Knight Merz Sinclair Knight Merz (SKM) was a private Australian company operating across Asia Pacific, the Americas, Europe, the Middle East and Africa. The company had global capability in strategic consulting, engineering and project delivery. Jacobs Engi ...
and Cardno. Investigations by the Gold Coast Desalination Alliance identified 13 possible sites of which three,
Pimpama Pimpama is a northern suburb in the City of Gold Coast, Queensland, Australia. In the , Pimpama had a population of 9,396 people. The name is of Aboriginal origin. The suburb contains numerous schools with the first opening in the 1870s. A s ...
,
Coombabah Coombabah is a suburb in the City of Gold Coast, Queensland, Australia. In the , Coombabah had a population of 10,388 people. Geography Surrounding Coombabah is Paradise Point and Hope Island to the north, Arundel to the south, Runaway Bay ...
and Bilinga, were short-listed. The
Gold Coast City Council The City of Gold Coast is the local government area spanning the Gold Coast, Queensland, Australia and surrounding areas. With a population of 606,774 it is the second most populous local government area in Australia (City of Brisbane being the ...
chose Bilinga as the most suitable site for the desalination plant due to being closest to the coast, having low environmental impact and cost, and being best suited to achieving a timely construction process. This choice was aligned with community values and expectations – community consultation conducted prior to construction highlighted that environmental impacts and cost were the most important issues when considering the location of the proposed plant. The Bilinga site is compatible with surrounding land use, requires the shortest intake and outlet pipelines of the three site options and the inlet and outlet pipes cross a minor fault line. The plant is a 'two-pass'
reverse osmosis Reverse osmosis (RO) is a water purification process that uses a partially permeable membrane to separate ions, unwanted molecules and larger particles from drinking water. In reverse osmosis, an applied pressure is used to overcome osmotic pre ...
desalination plant. The first pass removes salt, minerals and other microscopic particles, while the second pass targets boron and bromide specifications suitable for drinking water. As well as the core desalination equipment, the project includes 1.5 kilometre marine intake and outlet tunnels, a 25 kilometre pipeline to connect to the
South East Queensland Water Grid The SEQ Water Grid is a region-wide, long term, water supply scheme that provides a sustainable water infrastructure network for the South East region of Queensland, Australia. The project was the largest urban response to the drought in Australi ...
at Worongary, a pump station and a small reservoir.


Construction process and timeline

The project schedule was approximately: * August to November 2006: initial design * October 2006 to July 2008: tunnels and shafts * November 2006 to June 2008: desalination plant * July 2008 to November 2008: commissioning * October 2008 to January 2009: optimisation. The plant produced its first water in November 2008 and began supplying water to the grid in February 2009.


Defects

In January 2009, rust and valve problems delayed the plant's opening. The plant began operations in February 2009 and has been operating according to grid instructions since that time, except for a five-week shutdown in May 2009 and a three-month shutdown from June to August 2010 to repair previously identified defects. During the initial shutdown a formal investigation of these problems was undertaken. In June 2009 some further faults were identified, all bar one of which were rectified with the final piece of work to be completed by the end of August 2010. These defects did not affect the plant's ability to produce clean safe water but had implications for its long term viability. The
Queensland Government The Queensland Government is the democratic administrative authority of the Australian state of Queensland. The Government of Queensland, a parliamentary constitutional monarchy was formed in 1859 as prescribed in its Constitution, as amended fr ...
refused to accept ownership of the plant until all problems were rectified.


Awards

It is the first large-scale desalination plant on Australia's eastern seaboard and was named Membrane Desalination Plant of the Year (2009) at the Global Water Awards.


Possible future expansion

There is potential to increase output to 167 megalitres a day. However the plant was identified as a reserve, rather than priority, site on the Queensland Government's list of possible sites for future desalination plants. Lytton and either
Marcoola Marcoola is a coastal town and locality in the Sunshine Coast Region, Queensland, Australia. In the , the locality of Marcoola had a population of 3,173 people. Geography Marcoola includes part of the pristine Mount Coolum National Park, border ...
or Bribie Island are the priority sites. The plant was officially handed over to the Queensland Government agency
WaterSecure WaterSecure, the trading name of the Queensland Manufactured Water Authority, was a statutory authority of the Government of Queensland that supplied water to the South East Queensland region of Australia through its desalination plant and a ...
in October 2010. Since 1 July 2011 it is owned by
Seqwater Seqwater is a statutory authority of the Government of Queensland that provides bulk water storage, transport and treatment, water grid management and planning, catchment management and flood mitigation services to the South East Queensland reg ...
.


Environmental concerns

Ongoing monitoring is undertaken at the plant as part of its environmental licence. Underwater footag

shows an abundance of marine life is now active around
artificial reef An artificial reef is a human-created underwater structure, typically built to promote marine life in areas with a generally featureless bottom, to control erosion, block ship passage, block the use of trawling nets, or improve surfing. Many re ...
s that have been created on the marine structures. Community groups such as the
Queensland Conservation Council The Queensland Conservation Council (QCC) or Queensland Conservation is a non-governmental organisation that represents all the major conservation organisations of Queensland state in Australia. The organisation have been working to protect, cons ...
and GECKO have expressed concern over environmental issues with the project. Desalination is an electricity-intensive way to produce water. The plant uses around 3.58 kilowatt-hours (kWh) of electricity for every cubic metre (kilolitre) of water it produces. To offset the carbon emissions associated with this electricity consumption, the plant operators purchase renewable energy certificates (RECs). The RECs have been produced by a range of renewable energy sources with the main source being solar hot water system installations. Other sources include solar photovoltaic, hydro and a small amount of wind.


Mothballing

Soon after being commissioned, rainfall and water storages increased in south east Queensland. Three major storages,
Wivenhoe Wivenhoe ( ) is a town and civil parish in north-eastern Essex, England, approximately south-east of Colchester. Historically Wivenhoe village, on the banks of the River Colne, and Wivenhoe Cross, on the higher ground to the north, were two ...
,
Somerset Dam The Somerset Dam is a mass concrete gravity dam with a gated spillway across the Stanley River in Queensland, Australia. It is within the locality of Somerset Dam in the Somerset Region in South East Queensland. The main purpose of the dam is ...
and
North Pine North Pine Sports Club is an Australian football (soccer) club from Dakabin, a suburb of Moreton Bay, Queensland, Australia. The club currently play in the Capital League 1 after relegation from Brisbane Premier League in 2016. History North ...
dams, approached 80% of capacity in mid-2009 and reached 100% by the end of 2010. Due to the availability of ample water in south east Queensland's dams, water supply costs and impacts on household water bills could be reduced by minimising the plant's operations. On 5 December 2010, then Natural Resources Minister, Stephen Robertson confirmed the plant would go into standby mode that month as a cost-saving measure. The plant has been used for brief periods since 2010 for a range of contingencies. For example: * in January 2013 it returned briefly to 100% operation to supply drinking water during the flooding of South-East Queensland due to
Cyclone Oswald Tropical Cyclone Oswald in 2013 was a tropical cyclone that passed over parts of Queensland and New South Wales, Australia over a number of days, causing widespread impact including severe storms, flooding, and water spouts. Coastal regions ...
* during September 2015 it returned to service when the
Mudgeeraba Mudgeeraba ( ) is a town and suburb in the City of Gold Coast, Queensland, Australia. In the , the suburb of Mudgeeraba had a population of 13,624 people. Mudgeeraba's essential character remains one of a nineteenth-century village, and contai ...
water treatment plant was being refurbished * during August 2016 it supplied around 360 ML of water while the Molendinar water treatment plant was being refurbished. * between November 2019 and January 2020, the plant was operated at full capacity to help provide relief when the water grid dropped below 60 per cent capacity * In Summer 2020/2021, the desalination plant was brought up to full capacity to allow for upgrades to the Mount Crosby Water Treatment Plant, which is expected to take more than two and a half years to complete. The plant plays an important role in Seqwater's plans to manage future droughts.


See also

* List of desalination plants in Australia *
Water security in Australia Water security in Australia became a major concern in Australia in the late 20th and early 21st century as a result of population growth, recurring severe droughts, effects of climate change on Australia, environmental degradation from reduced ...


References


External links


Gold Coast City Council - Water & Wastewater
{{WaterQueensland , state=autocollapse Buildings and structures on the Gold Coast, Queensland Desalination plants in Australia Water management in Queensland 2009 establishments in Australia Industrial buildings in Queensland