The Glen Massey Line was a private railway of 10.6 km near Ngāruawāhia in the Waikato region of New Zealand, built to serve coal mines, and, from 1935, run by the New Zealand Railways Department. The line had grades of 1 in 40, sharp curves - sharpest and 40 of less than - and 22 bridges, including a 91.5-metre-long and 18.3-metre-high timber trestle bridge over Firewood Creek halfway between Ngāruawāhia and Glen Massey and a bridge, adapted in 1917 to take sheep, on piles over the
Waipā River The Waipā River is in the Waikato region of the North Island of New Zealand. The headwaters are in the Rangitoto Range east of Te Kuiti. It flows north for , passing through Ōtorohanga and Pirongia, before flowing into the Waikato River at ...
, as well as the railway, after collapse of the
road bridge A bridge is a structure built to span a physical obstacle (such as a body of water, valley, road, or rail) without blocking the way underneath. It is constructed for the purpose of providing passage over the obstacle, which is usually somethi ...
.


Origins of the railway

Glen Massey's coal was known of by 1867, when it was suggested a tramway should be built down what is now known as the Firewood Creek valley. In 1908 government was asked to extend the proposed railway to
Whaingaroa Whaingaroa may refer to: * Ngāpuhi / Ngāti Kahu ki Whaingaroa, a Māori tribe * Raglan, New Zealand, a town in Waikato See also * Whangaroa, an area in Northland, New Zealand * Whangaroa Harbour Whangaroa Harbour (; ), previously spelled ...
Harbour, but rejected that in favour of an extension of the proposed
Glen Afton branch The Glen Afton Branch was a branch railway line of 7.9 km (originally 14.1 km) in the Waikato in New Zealand, built to serve coal mines in the Awaroa district west of Huntly, New Zealand, Huntly at Rotowaro, Pukemiro and Glen Afton. R ...
. Neither ever happened. Waipa Railway and Collieries Ltd was formed with a nominal capital of £80,000 in January 1910. The construction contract was let in 1911 for £26,500. Actual construction began in 1910, when a private siding was built at Ngāruawāhia on the
North Island Main Trunk The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is long, built to the New Zealand rail gauge of and ser ...
, and used from May 1912 to supply construction materials for the 8.2 km line to Glen Massey. The Prime Minister turned the first sod on 12 March 1912. The line was opened to Glen Massey in March 1914, and coal transport commenced, using a weigh-bridge at the Ngaruawahia private siding. The company bought a new loco, NO 1, in 1913 from Andrew Barclay and, in 1914, purchased a second-hand ex-
Wellington and Manawatu Railway The Wellington and Manawatu Railway Company (WMR or W&MR) was a private railway company that built, owned and operated the Wellington-Manawatu railway line between Thorndon in Wellington, the capital of New Zealand, and Longburn, near Palmers ...
tank locomotive from NZR, WH 449. Initial problems with lineside fires were resolved by fitting spark arrestors. A regular Saturday passenger service ran for many years, known as the "Wilton Express", using three ex- WMR
clerestory In architecture, a clerestory ( ; , also clearstory, clearstorey, or overstorey) is a high section of wall that contains windows above eye level. Its purpose is to admit light, fresh air, or both. Historically, ''clerestory'' denoted an upper l ...
carriages. A 'Waipa Collieries' advert, placed by the mine's first manager, showed passenger trains leaving Glen Massey at 8.30am and Ngāruawāhia at 4pm, with passengers also taken on coal trains leaving Glen Massey at 11.30am and 2.30pm and Ngāruawāhia at 10am and 1pm.


Wilton Collieries Ltd

By 1930 the original mine was worked out and the company went into liquidation. A new coal seam was found 3.5 km to the south; a new company, "Wilton Collieries Ltd", was formed to operate this line, which was known as the Waipa Railway and Collieries Limited private line, and from October 1944 as the Wilton Collieries Limited private line. Initially it had been planned to link the new mine to the railway by an aerial ropeway, but extending the railway was found to be more practicable and an application to extend the line was made in 1929. The railway line was sold to the new company for £10,000 in November 1930 and extended by about 2.2 km. The company purchased two ex-NZR tank locomotives, WD 356 and WD 316 in 1934 and 1933 to run the line, WD 356 being purchased primarily to replace the former Waipa Railway & Collieries No. 1, which had been lost in the Windy Creek runaway and derailment in 1933. Both of the WD class locomotives were noted as being beyond repair by 1935.


Mines Department control and closure

With no working locomotives, Wilton Collieries Ltd handed operations of the railway over to the New Zealand Railways, which began working the line from 12 August 1935 onwards. Initially operated using the WW class
4-6-4 Under the Whyte notation for the classification of locomotives, represents the wheel arrangement of four leading wheels, six powered and coupled driving wheels and four trailing wheels. In France where the type was first used, it is known as t ...
T tank locomotives, the line was operated from 26 February 1937 by the larger BB class
4-8-0 Under the Whyte notation for the classification of steam locomotives, represents the wheel arrangement of four leading wheels on two axles, usually in a leading truck or bogie, eight powered and coupled driving wheels on four axles and no traili ...
tender locomotives, which continued to run the line until final closure with some occasional assistance from WW class locomotives. In 1944, the Wilton Collieries Ltd mine at Glen Massey and associated railway between Glen Massey and Ngāruawāhia were
nationalised Nationalization (nationalisation in British English) is the process of transforming privately-owned assets into public assets by bringing them under the public ownership of a national government or state. Nationalization usually refers to pri ...
in 1944 for £86,000. Mine output was 70,000 tons of coal annually, half of which was for the NZR. Three return trips a day carried 400 tons daily. In 1935, track deterioration resulted in speed limits, initially , but from 10 December 1935 to Glen Massey and then to the mine.The End of an Era: Gwyneth Jones page 25 The line was closed on 19 May 1958. A short section is now part of the Hakarimata Rail Trail.


Locomotives

To operate the new line, Waipa Railway & Collieries Ltd purchased a small
0-6-2 Under the Whyte notation for the classification of steam locomotives, represents the wheel arrangement of no leading wheels, six powered and coupled driving wheels on three axles and two trailing wheels on one axle. The type is sometimes known a ...
T from Andrew Barclay, Works NO 1292/1913, which became WR&C NO 1. This locomotive remained in service until 1933 when it ran away and derailed at Windy Creek during shunting operations; Wilton Collieries Ltd (who now owned the railway) decided not to retrieve the locomotive and its remains were left at Windy Creek where they remain to this day. To assist with the work, WR&C purchased another locomotive from NZR in 1914,
2-6-2 Under the Whyte notation for the classification of steam locomotives, represents the wheel arrangement of two leading wheels, six coupled driving wheels and two trailing wheels. This arrangement is commonly called a Prairie. Overview The major ...
T WH 449 ( Manning Wardle 923/1884). This locomotive had formerly been WMR NO 4, and was used in regular service up until 1933 when it was put aside at the colliery screens. It was noted as still being there, albeit derelict, in 1957 when enthusiast Peter Mellor visited, but was presumably scrapped following the closure of the mine and railway in 1958. Following the purchase of the mine and railway by Wilton Collieries Ltd in 1930, the new company purchased two further locomotives from the NZR, a pair of
Baldwin Locomotive Works The Baldwin Locomotive Works (BLW) was an American manufacturer of railroad locomotives from 1825 to 1951. Originally located in Philadelphia, it moved to nearby Eddystone, Pennsylvania, in the early 20th century. The company was for decades t ...
WD class
2-6-4 Under the Whyte notation for the classification of steam locomotives, a locomotive has two leading wheels, six coupled driving wheels and four trailing wheels. This arrangement is commonly called Adriatic. Overview With only a few known except ...
T tank locomotives. WD 316 (Baldwin 18543/1901) and WD 356 (Baldwin 19260/1901) were purchased in 1934 and 1933 respectively, the former replacing Waipa Railway & Collieries NO 1 after its accident in 1933 and the latter replacing WH 449. Both were out of service and noted as being beyond repair in 1935, by which time the NZR had taken over. The eventual disposal of WD 316 is unknown; WD 356 survived in some capacity, possibly at another location under new owners, until the
Second World War World War II or the Second World War, often abbreviated as WWII or WW2, was a world war that lasted from 1939 to 1945. It involved the vast majority of the world's countries—including all of the great powers—forming two opposin ...
when its frames were cut into sections and dumped at Konini near
Pahiatua , image_skyline = Market day pahiatua 1st dec 2007 1.JPG , imagesize = , image_caption = , image_flag = , flag_size = , image_seal = , seal_size = , image_shi ...
to prevent erosion.


Accidents

* 6 June 1914 - Builder A. J. Smith is struck and killed by a runaway truck at the Glen Massey colliery screening bins. * 8 January 1921 - New Zealand Railways porter Robert Percy Broady is fatally run over while in charge of shunting carried out by Wilton Collieries NO 1 at Ngāruawāhia. * 22 November 1926 - A Rotorua express hauled by AB 819 was side-swiped by Wilton Collieries NO 1 while shunting at Ngāruawāhia, causing damage to both locomotives. * 19 November 1927 - Two motor trolleys collided on a viaduct, injuring 2 seriously. * 28 March 1933 - Wilton Collieries NO 1 and six wagons run away while shunting at Glen Massey on a 1 in 40 gradient; the train derailed at Windy Creek, killing driver William McLean. The locomotive remains were cut in half and moved downstream of the railway bridge in 1936 to avoid damage to the railway bridge. * 18 November 1935 - Washout occurs at Windy Creek.


References


Citations


Bibliography

* Page 105 *


External links


Waikato District Council photo of remnant of No.1 loco.
* Andrew Barclaybr>- works number 1292 from Barclay works list
* Photo of Waipa Railway & Collieries Ltd. NO 1 in 1917
see 1917 photo
* Descriptions of progress with construction works
Auckland Star, Volume XLIV, Issue 116, 16 May 1913, Page 7Auckland Star, Volume XLIV, Issue 257, 28 October 1913, Page 7Auckland Star, Volume XLV, Issue 14, 16 January 1914, Page 2
an
Wairarapa Daily Times, Volume LXVI, Issue 11973, 9 May 1914, Page 6

1917 photos of colliery loading bins
an
mine entrance
* Reports on State Mine, railway and houses ttps://atojs.natlib.govt.nz/cgi-bin/atojs?a=d&d=AJHR1945-I.2.1.4.4&e=-------10--1------0-- 1945 ttps://atojs.natlib.govt.nz/cgi-bin/atojs?a=d&cl=search&d=AJHR1946-I.2.2.2.4&srpos=4&e=-------100--1------0state+mines+report+wilton-- 1946br>194719481949
an
1950
* 1912 Auckland Weekly News photos

[http://www.aucklandcity.govt.nz/dbtw-wpd/exec/dbtwpub.dll?BU=http%3A%2F%2Fwww.aucklandcity.govt.nz%2Fdbtw-wpd%2FHeritageImages%2Findex.htm&AC=QBE_QUERY&TN=heritageimages&QF0=ID&NP=2&MR=5&RF=HIORecordSearch&QI0=%3D%22AWNS-19120919-3-1%22 building the line]
1951 aerial photo of Ngauruwahia including the Glen Massey Line
an
Waipa bridge1952 photo of train on Firewood Creek viaduct1952 photo of train near bunkers

1958 aerial photo of Glen Massey
{{Use dmy dates, date=November 2013 Railway lines in New Zealand Rail transport in Waikato Railway lines opened in 1914 Railway lines closed in 1958 3 ft 6 in gauge railways in New Zealand Closed railway lines in New Zealand