George Galatis
   HOME

TheInfoList



OR:

George Galatis is a senior
nuclear engineer Nuclear engineering is the branch of engineering concerned with the application of breaking down atomic nuclei ( fission) or of combining atomic nuclei (fusion), or with the application of other sub-atomic processes based on the principles of n ...
and
whistleblower A whistleblower (also written as whistle-blower or whistle blower) is a person, often an employee, who reveals information about activity within a private or public organization that is deemed illegal, immoral, illicit, unsafe or fraudulent. Whi ...
who reported safety problems at the Millstone 1 Nuclear Power Plant, relating to reactor refueling procedures, in 1996.Shaw, William H. (2004)
''Business Ethics''
pp. 267-268.
The unsafe procedures meant that spent fuel rod pools at Unit 1 had the potential to boil, possibly releasing
radioactive Radioactive decay (also known as nuclear decay, radioactivity, radioactive disintegration, or nuclear disintegration) is the process by which an unstable atomic nucleus loses energy by radiation. A material containing unstable nuclei is consid ...
steam throughout the plant. Galatis was the subject of a ''
Time Time is the continued sequence of existence and events that occurs in an apparently irreversible succession from the past, through the present, into the future. It is a component quantity of various measurements used to sequence events, to ...
'' magazine cover story on March 4, 1996. Millstone 1 was permanently closed in July 1998.


Refueling procedures

Every 18 months the Millstone 1 nuclear reactor was shut down so the fuel rods that make up its core could be replaced; the old rods, radioactive and burning hot, were moved into a 40-feet-deep body of water called the spent-fuel pool. One-third of the rods were moved into the pool under normal conditions. But in the 1990s Galatis realized that Millstone was routinely performing "full-core off-loads", moving all the hot fuel into the spent-fuel pool. In addition, the Millstone 1 routine ignored the mandated 250-hour cool-down period before a full core off-load, and sometimes the fuel was moved just 65 hours after shutdown, a violation that melted the boots of one worker. By sidestepping the safety requirements in this way, Millstone saved about two weeks of downtime for each reactor refueling—during which Northeast Utilities had to pay $500,000 a day for replacement power. Galatis eventually took his concerns to the
Nuclear Regulatory Commission The Nuclear Regulatory Commission (NRC) is an independent agency of the United States government tasked with protecting public health and safety related to nuclear energy. Established by the Energy Reorganization Act of 1974, the NRC began operat ...
, to find that they had "known about the unsafe procedures for years". As a result of going to the NRC, Galatis experienced "subtle forms of harassment, retaliation, and intimidation".


NRC investigation

The NRC Office of Inspector General investigated this episode and essentially agreed with Galatis in Case Number 95-771, the report of which tells the whole story:
The Office of Inspector General (OIG), U.S. Nuclear Regulatory Commission (NRC), initiated this investigation based on information submitted to the NRC pursuant to a 10 Code of Federal Regulations (CFR) 2.206 petition filed on August 21, 1995, on behalf of George Galatis, a senior engineer with Northeast Utilities Services Company (NU), and We the People, Inc. The petition alleged that the NRC knowingly allowed NU to operate the Millstone Unit 1 Nuclear Power Station for 20 years in violation of its operating license and beyond its design basis. The petitioners maintained that during normal refueling outages at Millstone Unit 1, NU offloaded the entire fuel core.
The OIG investigation developed evidence that NU operated Millstone Unit 1 outside of its design basis. The OIG investigation determined that the licensee may have violated the operating license for Millstone Unit 1 because of a failure to operate in accordance with its technical specification. One procedure required by the technical specifications is for the operation of the spent fuel cooling system. OIG uncovered information which indicates that for approximately 10 years, in order to handle the heat load from a full core offload, reactor operators at Millstone Unit 1 operated the spent fuel pool cooling system in a configuration that was not covered by a plant operating procedure.NRC Failure to Adequately Regulate - Millstone Unit 1 (Case No. 95-77I)
/ref>


See also

*
List of nuclear whistleblowers There have been a number of nuclear whistleblowers, often nuclear engineers, who have identified safety concerns about nuclear power and nuclear weapons production. List Other nuclear whistleblowers * Chuck Atkinson * Dale G. Bridenbaugh * Jo ...
*
Nuclear accidents A nuclear and radiation accident is defined by the International Atomic Energy Agency (IAEA) as "an event that has led to significant consequences to people, the environment or the facility. Examples include lethal effects to individuals, lar ...
*
Nuclear accidents in the United States The United States Government Accountability Office reported more than 150 incidents from 2001 to 2006 of nuclear plants not performing within acceptable safety guidelines. According to a 2010 survey of energy accidents, there have been at least 5 ...
*
Nuclear safety Nuclear safety is defined by the International Atomic Energy Agency (IAEA) as "The achievement of proper operating conditions, prevention of accidents or mitigation of accident consequences, resulting in protection of workers, the public and the ...
*
Nuclear safety in the United States Nuclear safety in the United States is governed by federal regulations issued by the Nuclear Regulatory Commission (NRC). The NRC regulates all nuclear plants and materials in the United States except for nuclear plants and materials controlled by ...
*
Nuclear whistleblowers There have been a number of nuclear whistleblowers, often nuclear engineers, who have identified safety concerns about nuclear power and nuclear weapons production. List Other nuclear whistleblowers * Chuck Atkinson * Dale G. Bridenbaugh * Jo ...
*
Richard Levernier Richard Levernier is an American nuclear whistleblower. Levernier worked for 23 years as a nuclear security professional, and identified security problems at U.S. nuclear facilities as part of his job. Specifically, after 9/11, he identified prob ...


References

{{DEFAULTSORT:Galatis, George People associated with nuclear power American whistleblowers Living people Nuclear engineers Year of birth missing (living people)