Frederick Douglass Bridge
   HOME

TheInfoList



OR:

The Frederick Douglass Memorial Bridge is a through arch bridge that carries South Capitol Street over the Anacostia River in Washington, D.C. It was completed in 2021 and replaced an older swing bridge that was completed in 1950 as the South Capitol Street Bridge. In 1965, the original bridge was renamed after abolitionist Frederick Douglass. In 2007, the original swing bridge was used by 77,000 daily commuters.


Original bridge

The original bridge opened on January 14, 1950, as the South Capitol Street Bridge, though it had previously been called the Victory Bridge by Captain H.C. Whitehurst, the District Director of Highways, because it was the first project started after the war ended. At the time it was the longest bridge in the District of Columbia and one of the longest swing bridges in the world. Work on the bridge began in 1945, being advertised 2 weeks after World War II ended, but was stalled in 1947 for four months while the District asked Congress for more money. What to name the bridge had been a question since before it opened, with people all over the world sending in suggestions. The leading ideas in 1950 were FDR, Theodore Roosevelt, George Washington and Herbert Hoover and Frederick Douglass. One idea suggested in 1950 was Walter Johnson, which would have been prescient since the baseball stadium would be built at the foot of the bridge more than 50 years later. But it was only Douglass who was the subject of an organized movement that submitted a petition with 250 names. It took 14 years, but in 1964 the D.C. Federation of Civic Associations requested that the bridge be named the Frederick Douglass Memorial Bridge and on October 18, 1965, the District's Commissioners voted to name it so, making it both one of the first major bridges named for an African-American or a former slave. The bridge connects at its southern terminus with Interstate 295 and the
Suitland Parkway The Suitland Parkway is a parkway in Washington, D.C., and Prince George's County, Maryland, administered and maintained by the U.S. National Park Service (NPS), National Capital Parks-East. The road has partial controlled access with a combin ...
and thus provides access to downtown from those routes as well as from South Capitol Street and roads connecting to it. As a result, the bridge carries commuter traffic from
Prince George's County, Maryland ) , demonym = Prince Georgian , ZIP codes = 20607–20774 , area codes = 240, 301 , founded date = April 23 , founded year = 1696 , named for = Prince George of Denmark , leader_title = Executive , leader_name = Angela D. Alsobroo ...
, and from Southern Maryland. The bridge is part of the National Highway System, as are South Capitol Street north of the bridge and the Suitland Parkway. The bridge provides a gateway to a former industrial part of the city that was heavily developed in the early 21st century, including the area around the new Nationals Park for the Washington Nationals, which opened March 30, 2008. The bridge was re-decked and widened in 1975–1978 to repair damage, build new approaches and to create room for a 5th lane that would be bus-only in the rush hour direction. The work also narrowed the sidewalks. In 1988, the swing gate was replaced and as a result of closures the bus-only lane became an all-user lane again. In 2007, the bridge was closed from July 6 to August 29 for a $27 million renovation project meant to extend its life for 20 years. The northernmost portion of the bridge was lowered to become an at‑grade roadway with a new intersection at South Capitol Street and Potomac Avenue. Nearly three blocks of elevated roadway, which blocked access across South Capitol Street, were removed and replaced with at‑grade intersections that will help knit the neighborhood together. The deck was once again replaced and resurfaced, and new
street light A street light, light pole, lamp pole, lamppost, street lamp, light standard, or lamp standard is a raised source of light on the edge of a road or path. Similar lights may be found on a railway platform. When urban electric power distribution ...
s and
guard rail Guard rail, guardrails, or protective guarding, in general, are a boundary feature and may be a means to prevent or deter access to dangerous or off-limits areas while allowing light and visibility in a greater way than a fence. Common shapes ...
s were added. Despite these repairs, the bridge continued to deteriorate faster than maintenance could keep up. Inspectors found that the bridge's beams had large corrosion holes in its structural beams which necessitated complete replacement of the bridge.


Replacement bridge

In late 2012, officials announced a $906 million plan to replace and realign the bridge. The project will build new interchanges between the bridge and Suitland Parkway, the bridge and Potomac Avenue SW, Suitland Parkway and Interstate 295, and Suitland Parkway and
Martin Luther King, Jr. Avenue Martin Luther King Jr. Avenue (also known as MLK Ave) is a major street in the District of Columbia traversing through both the Southwest and Southeast quadrants. Route Martin Luther King Jr. Avenue SW begins at the southwestern tip of the Dis ...
. The current four-lane bridge will be replaced with a $573.8 million six-lane bridge. A traffic circle with a large field (to be used for public gatherings, and suitable for several new memorials) will connect the north end of the bridge with Potomac Avenue SW. A second massive traffic oval on the south end of the bridge will help connect it to Martin Luther King, Jr. Avenue, and help expand the city's "monumental core" into Anacostia. Reconstruction of the two interchanges was estimated to cost $209.2 million. The remainder of the budgeted funds will help renovate New Jersey Avenue SE and turn South Capitol Street from an industrial corridor into an urban boulevard. The two-year project was to begin in 2013. An initial bridge design was submitted to the National Capital Planning Commission and the United States Commission of Fine Arts in summer 2013. The CFA rejected the design in September, called it "uninspired". The agency asked for a design with a more "contemporary approach" and "bolder look".Neibauer, Michael. "Four Teams Shortlisted for $608M D.C. Bridge Project." ''Washington Business Journal.'' January 30, 2014.
Accessed January 30, 2014.
On January 29, 2014, the District of Columbia Department of Transportation (DDOT) announced the four construction teams that will be asked to solicit final bids on the bridge demolition and construction: * Frederick Douglass Bridge Partners (a joint venture of Tutor Perini, T.Y. Lin International Group, and Stantec) * Skanska Facchina (a joint venture of
Skanska AB Skanska AB () is a Multinational corporation, multinational construction and development company based in Sweden. Skanska is the fifth-largest construction company in the world according to ''Construction Global'' magazine. Notable Skanska projec ...
, Facchina Group, and Parsons Transportation) * South Capitol Constructors (a joint venture of Kiewit Corporation, Corman Construction, and URS Corporation) * South Capitol Bridge Builders (a joint venture of Archer Western Contractors, Granite Construction, and AECOM) The cost of the bridge (which included demolition and construction of the bridge and traffic ovals, but not the Suitland Parkway interchange) was now pegged at $608 million. The new bridge also required the removal of , the Washington Navy Yard's deteriorating
museum ship A museum ship, also called a memorial ship, is a ship that has been preserved and converted into a museum open to the public for educational or memorial purposes. Some are also used for training and recruitment purposes, mostly for the small numb ...
, which would have been landlocked by construction of the new span. Mayor Muriel Bowser budgeted $512.7 million over six years, beginning in fiscal 2016, to begin building the bridge.


Design

On August 7, 2017, DDOT chose South Capitol Bridge Builders as the contractor team to design and build the new bridge and ovals. The bridge will have six lanes as well as bicycle and pedestrian access. Anacostia Drive was permanently closed under the bridge and access to it from South Capitol Street and Suitland Parkway was curtailed. In 2017, South Capitol Bridge Builders estimated that, if all went well, construction should be finished in December 2021. DDOT unveiled the new design for the bridge on August 10, 2017. The design is for a long through arch bridge consisting of three sets of parallel white arches. The bridge will have six traffic lanes, and a joint bicycle-pedestrian path on either side of the bridge deck. At both ends of the bridge there will be an esplanade run under the bridge and along the Anacostia River as well as a community park.


Construction

The bridge is the biggest public works project in the history of the District of Columbia, and employed more than 1,300 workers at the height of construction. The federal government contributed more than $200 million towards the bridge's cost. In 2019 cost of just the bridge was estimated at $480 million. Work began on the bridge in 2018, in sync with the commemoration of the bicentennial of Fredrick Douglass' birth. It was half finished in 2019, with completion expected in 2021. In a news release in February 2021, Mayor Bowser announced that the bridge was projected to open on October 1. On September 6, 2021, a
5K run The 5K run is a long-distance road running competition over a distance of . Also referred to as the 5K road race, 5 km, or simply 5K, it is the shortest of the most common road running distances. It is usually distinguished from the 5000 met ...
was held over the new bridge as part of a ceremony that celebrated its imminent completion. As part of that ceremony, it was announced that the bridge would open to outbound vehicles on September 10, with the inbound lanes opening the next day. Both directions opened on schedule, and the old bridge is scheduled for dismantling once all remaining work is complete. Nighttime closures of the new bridge for up to 15 minutes at a time were scheduled every weekday from September 15 to 29 so crews can finish up construction and conduct tests.


Gallery

File:Frederick Douglass Bridge 2019.jpg, Beginnings of new bridge construction in 2019 File:Frederick Douglass Bridge construction 2020e.jpg, Construction of the arch spans in June 2020 File:FrederickDouglasBridgeReplacement-082321-2.jpg, The old and new bridge next to each other File:FrederickDouglasBridgeReplacement-082321-3.jpg, The old and new bridge next to each other File:FrederickDouglasBridgeReplacement-082321-4.jpg, The old and new bridge next to each other File:FrederickDouglasBridgeReplacement-082321.jpg, The old and new bridge next to each other


See also

*
Architecture of Washington, D.C. Washington, D.C., the capital of the United States, has a unique and diverse architectural history. Encompassing government, monumental, commercial, and residential buildings, D.C. is home to some of the country's most famous and popular structur ...


References


External links


DDOT's Frederick Douglass Bridge Project web siteSouth Capitol Street Today - Chapter 2
Discusses the bridge and its construction {{Frederick Douglass, state=collapsed 1950 establishments in Washington, D.C. Bridges completed in 1950 Bridges over the Anacostia River Memorial Bridge Road bridges in Washington, D.C. Southeast (Washington, D.C.) Southwest Waterfront Swing bridges in the United States Bridges completed in 2021 Through arch bridges in the United States 2021 establishments in Washington, D.C.