History
Early railways
The earliest railways in Angus were technologically primitive lines constructed in the 1830s: theA Scottish network
In the 1840s serious consideration was given to the connection of central Scotland to London, and considerable public controversy took place over the optimal route, as it was assumed at first that only one line could be supported. The public debate encouraged consideration of a Scottish railway network, and the availability of easy money led to a considerable number of schemes being presented to Parliament for the 1845 session. Prime among these was theThe Aberdeen Railway
The Aberdeen Railway was to build northward from a location between Arbroath and Forfar, to Aberdeen. It was to take over, and modernise, the primitive Arbroath and Forfar line. The A&FR line lay across the general line of advance, and the Aberdeen Railway had two choices: to build from Forfar via Brechin, or to build from the A&FR line somewhere closer to Arbroath. Brechin was a significant township at the time, with a population in 1841 of about 4,000. However the decision was taken to make a junction with the A&FR near Guthrie instead; this prevented the selection of a route through Brechin, but avoided a considerable mileage of new construction. The Aberdeen Railway opened in stages between 1847 and 1850. Brechin was served by a branch line from Bridge of Dun.The Forfar and Brechin Railway proposed
The route via Brechin considered for the Aberdeen Railway was revived in the 1880s, when a main line railway was under consideration from Forfar to Brechin: the earlier proposal was renewed. The Forfar and Brechin Railway was proposed as an alternative main line route, avoiding the detour via Guthrie, somewhat shortening the mileage between Perth and Aberdeen. There were some practical difficulties with this scheme: the Hills of Finhaven formed a long ridge north of Forfar, which meant that the direct line to Brechin would have to diverge some considerable distance west of the existing Forfar station, and through trains would be unable to make a call: Forfar would be on a branch. Moreover, the terminal station at Brechin faced the centre of the town and could not be converted to a through station. Attempts were made to find an acceptable alternative site for stations at both the towns which would enable the operation of a through main line, but in both cases this proved impossible. The Caledonian was being urged by the F&BR to adopt its scheme as the main line, saving in the main line, but the gradients would be 1 in 80 and both Forfar and Brechin would be off the new main line: the Caledonian were unenthusiastic. Undeterred, promoters submitted a Bill to the 1890 Parliamentary session, and the ''Forfar and Brechin Railway'' was authorised on 4 August 1890, capital £160,000.From Carter; Ross says £330,000, page 144, but this is double the price they paid to purchase it in 1893. The main line was to be long, with two short connections in Forfar, which were to form the spur connections to the Forfar station. (The railway as built only ran from Forfar station in a westerly direction, curving north and east to the originally planned main line.) Although still conceived as a through trunk railway, it started from Forfar heading west (involving a reversal there for through trains). There was worse: at Brechin, the proposed alignment passed by the Brechin station, and had no station facility in this, the most important community on its route. It was to converge with the existing Aberdeen Railway line somewhat to the east of its Brechin station.Complications
The construction of the Forfar and Brechin line proceeded, and it was complete by early 1894, and by the middle of the year had been successfully inspected by the Board of Trade inspecting officer. However, there were now complications with the neighbouringSale to the Caledonian Railway
The F&BR had considered itself to be a main line trunk railway but in fact it was becoming a purely local rural line, with no large population centre on its line of route. Raising money for the construction must have been a problem, for on 29 Nov 1893, Joseph Phillips, the contractor for the construction of the line, on behalf of himself and the company sold the line to the Caledonian Railway for £168,400. The fact that Phillips was in the lead means that he was the majority shareholder, so the company must have paid him for his work in shares. The sale was authorised by an Act of 31 July 1894.Opening
All the formalities having finally been completed, the line opened to goods trains on 7 January 1895 and to passenger trains on 1 June 1895. The line was worked by the Caledonian from the outset. The train service was purely local, running to the Brechin terminus station, and the through line, passing Brechin was never used for passenger trains. Indeed, the junction at the east end of the loop connection was controlled from a ground frame only. The passenger service consisted of four or five trains daily.Decline and closure
The F&BR never achieved the main line status that its promoters had imagined: its departure from Forfar meant a reversal there, and a station call at Brechin also meant a reversal. Never reaching its potential the line closed to passenger trains on 4 August 1952. Goods trains continued to run throughout until on 17 March 1958 the line was closed completely between Careston and Brechin; it was further cut back to only Forfar to Justinhaugh from 7 September 1964, and completely closed on 4 September 1967.Topography
At Brechin the line as authorised passed west to east on the north side of the town. After the 1893 Act modifying the Edzell line, the two lines joined on the north west side of the town and ran for a while alongside one another, as two single lines, to Brechin North Junction; from there the two lines combined and ran as a double line round to Brechin terminal station. The F&BR line continued eastwards to Brechin East Junction; this was a ground frame controlled connection only. Passenger operation on the Forfar and Brechin line was from 1 June 1895 to 4 August 1952. Stations and Locations: * ''Forfar West Junction''; from Caledonian main line; * Justinhaugh; * Tannadice; * Careston; * ''Brechin North Junction''; Edzell line trails in; Edzell line to Brechin station diverges; * ''Brechin East Junction''; converges with Caledonian Railway branch line.Notes
References
{{reflist Pre-grouping British railway companies Railway companies established in 1890 Railway companies disestablished in 1893 British companies established in 1890 British companies disestablished in 1893