First Church Of Christ (New London, Connecticut)
   HOME

TheInfoList



OR:

The First Church of Christ, also called the First Congregational Church, was a Gothic Revival-style church located in
New London, Connecticut New London is a seaport city and a port of entry on the northeast coast of the United States, located at the mouth of the Thames River in New London County, Connecticut. It was one of the world's three busiest whaling ports for several decade ...
. It was completed in 1853, designed by Prague-born architect
Leopold Eidlitz Leopold Eidlitz (March 10, 1823, Prague, Bohemia – March 22, 1908, New York City) was a prominent New York architect best known for his work on the New York State Capitol (Albany, New York, 1876–1881), as well as " Iranistan" (1848), P. T. B ...
. This large granite edifice featured a tall central spire, rising in three stages and flanked by two lower towers with pitched roofs. It occupied a prominent position on Union Street, across from the City Hall, anchoring the Downtown New London Historic District. The building is no longer standing, due to a sudden loss of
structural integrity Structural integrity and failure is an aspect of engineering that deals with the ability of a structure to support a designed structural load (weight, force, etc.) without breaking and includes the study of past structural failures in order to ...
. Its steeple completely and almost instantaneously collapsed on January 25, 2024. Demolition of the rest of the building was completed the following week.


History

The building traced its history to a congregation originally formed by early settlers to New London in the 1600s. The prior meeting house was built in 1786 but was damaged by fire in February, 1848. The congregation then commissioned Eidlitz to design a new structure. Construction began in May 1852, and the building was dedicated in June 1853. In 1876, a bell was installed in the church tower. The town of New London used the bell as a fire alarm and as a way to call people to meetings. In 1975, an annex building was added to the rear of the church. By the early 2000s, the church was serving free breakfast on weekday mornings. They also held remembrance services for homeless people from the area who had died. In 2011, Engaging Heaven Church began using the space for their services. In 2015, the building was sold for $250,000 to Engaging Heaven Church. The original congregation had a shrinking number of members and no longer had sufficient funds to maintain the building. The two congregations continued to share use of the building. A few years later, part of the building's roof was replaced.


Steeple collapse

The church's steeple collapsed on itself and on the roof of the church at 1:30 pm on January 25, 2024, destroying much of the building. The only person in the building was the church office manager who was able to evacuate without sustaining injuries. New London's Mayor Passero told the press that the building was likely a complete loss, as the structural soundness of the remainder could not be determined. According to initial reports, church and city leadership had not seen any previous structural issues with the church. The building's most recent fire inspection had been in 2019, during which three minor violations were found and fixed. However, in 2011, a thorough condition report on the building did identify areas of water infiltration through failing sections of the slate roof, and stress fractures in the exterior granite mortar. That report identified cracks in the masonry and issues with roof flashing. In total, about $700,000 in repairs and upgrades were needed, some of which applied to the exterior fabric of the building but were not subsequently addressed or monitored. Prior to that date, steel tie rods had been inserted to re-enforce sections of the tower walls. Architects, engineers, and preservationists have been studying images of the church in order to speculate about the cause of the collapse and to identify risks to other similar structures. The possible explanations for the collapse include masonry deterioration, rusting of the metal tie rods, and foundation failure. The structure likely suffered from a long period of deferred maintenance. At the time of the collapse, the tower tipped backwards over the roof of the church, suggesting that the weakness was at the back of the tower. Signs of displacement in the NW buttress and deformation in the roof framing have been identified through close retrospective analysis of photos captured prior to the collapse. At the front of the tower, there were deficiencies in water drainage from the balconies that ran on either side of the spire, next to the left and right side towers, allowing water to infiltrate. Environmental conditions that may have aggravated structural weaknesses include: high levels of ground saturation from a recent rainfall with a record-breaking four inches falling on January 9, 2024, compounding subsidence and other water infiltration and drainage problems; repeated damage from freeze-thaw cycles; and vibrations from pile driving for building the wind energy infrastructure at the nearby State Pier. In response to the collapse,
Connecticut College Connecticut College (Conn College or Conn) is a private liberal arts college in New London, Connecticut. It is a residential, four-year undergraduate institution with nearly all of its approximately 1,815 students living on campus. The college w ...
evacuated their nearby dormitory Manwaring Hall (but later determined that it was structurally safe), and New London closed City Hall and a post office in an effort to prevent traffic near the site. It was determined that the remainder of the structure could not be saved. Demolition on the church began on January 26, 2024, and was completed on February 1. The bell and the organ were also destroyed. The 1970s annex building remains but has been condemned. The rubble from the church remained on site awaiting an environmental assessment. The City of New London has place a lien on Engaging Heaven Church for the expense of securing the site after the collapse and subsequent complete demolition, which cost over $250,000.{{Cite news , last=Scott-Smith , first=Brian , date=February 21, 2024 , title=New London Places Lien on Collapsed Church , url=https://www.wshu.org/connecticut-news/2024-02-21/new-london-ct-collapsed-church-lien , archive-url= , access-date=March 31, 2024 , work=National Public Radio WSHU


References

1852 establishments in Connecticut 2024 disestablishments in Connecticut Building and structure collapses in 2024 Buildings and structures in New London, Connecticut Churches in New London County, Connecticut Churches completed in 1853 Collapsed buildings and structures in the United States Congregational churches in Connecticut Demolished buildings and structures in Connecticut Former churches in Connecticut Gothic Revival architecture in Connecticut January 2024 events in the United States Leopold Eidlitz church buildings