Farnworth Railway Station
   HOME

TheInfoList



OR:

Farnworth railway station serves the town of
Farnworth Farnworth is a town in the Metropolitan Borough of Bolton, Greater Manchester, England, southeast of Bolton, 4.3 miles south-west of Bury (7 km), and northwest of Manchester. Historically in Lancashire, Farnworth lies on the River Ir ...
, in the
Greater Manchester Greater Manchester is a metropolitan county and combined authority area in North West England, with a population of 2.8 million; comprising ten metropolitan boroughs: Manchester, Salford, Bolton, Bury, Oldham, Rochdale, Stockport, Tam ...
,
England England is a country that is part of the United Kingdom. It shares land borders with Wales to its west and Scotland to its north. The Irish Sea lies northwest and the Celtic Sea to the southwest. It is separated from continental Europe b ...
. The station underwent several name changes before the present name was adopted in 1974. It lies on the Manchester-Preston Line north of
Manchester Victoria Manchester Victoria station in Manchester, England is a combined mainline railway station and Metrolink tram stop. Situated to the north of the city centre on Hunts Bank, close to Manchester Cathedral, it adjoins Manchester Arena which was co ...
, though only local services run by
Northern Trains Northern Trains, branded as Northern, (legally Northern Trains Limited) is a publicly owned train operating company in England. It is owned by DfT OLR Holdings for the Department for Transport (DfT), after the previous operator Arriva Rail N ...
call here. The station received a minor upgrade in 2009, with the addition of automated electronic information display systems and automated announcements audio system similar to the system at Lostock station. A more substantial rebuild, involving platform realignment, was undertaken in 2015-2016 as part of works to electrify the Manchester-Preston line. The station has a ticket office, which is staffed from 06:30 to 13:00 on weekdays only (closed Saturdays and Sundays). Outside of these times, tickets must be purchased on the train or prior to travel. Step-free access to both platforms is via ramps from the station entrance.


History

The station was first opened by the
Manchester, Bolton and Bury Railway The Manchester and Bolton Railway was a railway in the historic county of Lancashire, England, connecting Salford to Bolton. It was built by the proprietors of the Manchester, Bolton and Bury Canal Navigation and Railway Company who had in 183 ...
on 29 May 1838, and was originally named ''Tunnel''. This station closed in 1841, but was reopened in September 1845, when it took the name of ''Halshaw Moor''. In May 1852 it was renamed ''Halshaw Moor and Farnworth''; in January 1870 ''Farnworth and Halshaw Moor''; and finally on 6 May 1974 it became ''Farnworth''.


Farnworth Tunnel

To the south-east of the station is Farnworth Tunnel, which had two single-track bores, although when built it had one double-track bore. Originally there was intended to be a cutting, but a tunnel was substituted. This was dug from both ends and also from a shaft at the centre; the main difficulty in construction being the nature of the ground, which consisted of wet sand and clay. It is long, although Network Rail has erected tunnel entrance nameboards that incorrectly read 294 yds. The
Lancashire and Yorkshire Railway The Lancashire and Yorkshire Railway (L&YR) was a major British railway company before the 1923 Grouping. It was incorporated in 1847 from an amalgamation of several existing railways. It was the third-largest railway system based in northern ...
(L&YR) route north from to was completed on 1 June 1880, and the
Midland Railway The Midland Railway (MR) was a railway company in the United Kingdom from 1844. The Midland was one of the largest railway companies in Britain in the early 20th century, and the largest employer in Derby, where it had its headquarters. It ama ...
(MR) proposed to use this route for a through service between and Scotland. The MR intended to use
Pullman car In the United States, Pullman was used to refer to railroad sleeping cars that were built and operated on most U.S. railroads by the Pullman Company (founded by George Pullman) from 1867 to December 31, 1968. Other uses Pullman also refers to ra ...
s, which were larger than the L&YR coaches, and it was found that some of the tunnels on the route were too small and would need to be enlarged. Among these was Farnworth tunnel, which was also in need of extensive repairs; so instead of enlarging it, it was decided to build a second tunnel alongside, to the south-west of the original. The new down (northbound) single-line tunnel was commenced on 26 April 1880 and brought into use on 5 December that year, although Parliamentary approval for its construction had not been obtained: it was applied for in February 1881 and granted retrospectively (as part of the Lancashire and Yorkshire Railway Act 1881, 44 & 45 Vic chapter 135) on 18 July that year. Once it was in use, the two tracks through the original tunnel were replaced by a single track along the centre; the tunnel lining was repaired and thickened, and this tunnel then formed the up (southbound) single-line tunnel. As part of the electrification scheme of the 2010s, the original tunnel has been enlarged to allow sufficient clearance for the overhead wires and for both lines to be routed through it once again. During this period, the 1880 bore was initially retained to permit a limited diesel service over the route to continue during the upgrade work, and after was then abandoned as clearances within are too restricted to allow safe operation with overhead wires. This has also required realignment of the lines approaching it and consequent alterations to the platforms that they serve. Work began in May 2015, when the 1838 bore was closed, filled in with cement and re-bored to a larger diameter using the largest
tunnel boring machine A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can be designed to bore thro ...
ever built in Britain. During tunnelling, the workers ran into loose/soft sand, which caused the project to be delayed from October to December and also led to the temporary closure of some lanes on the A666 road above for safety reasons. The TBM finally bored through on 25 October 2015, 21 days after the scheduled completion date. The newly widened tunnel reopened on 14 December 2015, after a scheduled engineering possession on the preceding weekend to connect and test the track & signalling equipment. The first train through was the 05:30 on 15 December from Horwich Parkway station, and the first passenger to use it was former councillor Andrew Morley. At the end of January 2016, the tunnel was once again closed to enable replacement of the temporary tracks and their replacement with tracks suitable for 100 mph running. Overhead wiring was later installed through the tunnel and electric trains were introduced along the route from Monday 11 February 2019, initially utilising Class 319
electric multiple units An electric multiple unit or EMU is a multiple-unit train consisting of self-propelled carriages using electricity as the motive power. An EMU requires no separate locomotive, as electric traction motors are incorporated within one or a number ...
.


Services

There is an hourly service northbound to via Bolton and and southwards and eastwards to
Manchester Victoria Manchester Victoria station in Manchester, England is a combined mainline railway station and Metrolink tram stop. Situated to the north of the city centre on Hunts Bank, close to Manchester Cathedral, it adjoins Manchester Arena which was co ...
and throughout the day Mondays to Fridays. A small number of early morning services run to/from . Services were suspended for several months due to the tunnel and station upgrade works mentioned above – they have now resumed, as the project has been completed. Originally planned to end in October 2015, this was subsequently extended to the December 2015 timetable change. The extension to the works was caused by excessive wet sand deposits being discovered in the overlaying land by Network Rail engineers, severely hampering progress of the boring machine. The station reopened (along with the tunnel) on 14 December 2015. Prior to the May 2018 timetable change, no evening weekday service operated aside from a solitary late evening train to Bolton and Wigan. As of July 2018, Saturday trains were replaced by buses as a result of ongoing engineering line blockages to progress the delayed electrification scheme mentioned previously (which was more than two years behind schedule) – this was finally completed in November 2018 and Saturday trains began running again the following month. As of December 2022, the station is served on Sundays by services from to .


References


Further reading

*


External links

{{Buildings and structures in Bolton Railway stations in the Metropolitan Borough of Bolton DfT Category E stations Former Lancashire and Yorkshire Railway stations Railway stations in Great Britain opened in 1838 Railway stations in Great Britain closed in 1841 Railway stations in Great Britain opened in 1845 Northern franchise railway stations Farnworth