Line 5 Eglinton (also known as the Eglinton Crosstown or the Crosstown) is a
light rail line that is under construction in
Toronto
Toronto ( ; or ) is the capital city of the Canadian province of Ontario. With a recorded population of 2,794,356 in 2021, it is the most populous city in Canada and the fourth most populous city in North America. The city is the ancho ...
, Ontario, Canada. Owned by
Metrolinx
Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union Sta ...
and operated by the
Toronto Transit Commission
The Toronto Transit Commission (TTC) is the public transport agency that operates bus, subway, streetcar, and paratransit services in Toronto, Ontario, Canada, some of which run into the Peel Region and York Region. It is the oldest and largest ...
(TTC), the line will be part of the
Toronto subway
The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). It is a multimodal transport, multimodal rail network consisting of three Pa ...
system as its fifth route. The first phase of the line will include 25 stops along
Eglinton Avenue
Eglinton Avenue is a major east–west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway 407 (but does not interchange with the tollway) at the western limits of Mississauga, as a ...
, from
Mount Dennis station
Mount Dennis is an intermodal transit terminal under construction in Toronto, Ontario, Canada. Located east of the intersection of Eglinton Avenue and Weston Road in the Mount Dennis neighbourhood in the district of York, the station will be th ...
underground to station, after which it will run predominantly at-grade within the street's
median
In statistics and probability theory, the median is the value separating the higher half from the lower half of a data sample, a population, or a probability distribution. For a data set, it may be thought of as "the middle" value. The basic fe ...
to
Kennedy station
Kennedy is both a terminal and interchange station on Line 2 Bloor–Danforth and Line 3 Scarborough of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kenn ...
, where it will connect underground with
Line 2 Bloor–Danforth
Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 a ...
and
Line 3 Scarborough
Line 3 Scarborough (originally known as the Scarborough RT or SRT) is a light rapid transit line that is part of the Toronto subway system in Toronto, Ontario, Canada. The line runs entirely within the suburban district of Scarborough, encompas ...
.
The line was conceived in 2007 during the administration of Toronto mayor
David Miller as part of
Transit City
Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by then-Toronto Mayor David Miller and Chair of the Toronto Transit Commission (TTC) Adam Giambrone. T ...
, a large-scale transit expansion plan. Construction of the first phase of the line began in 2011 and was originally expected to be completed in 2020;
it has been delayed more than once, and as of November 2021, Metrolinx and Crosslinx (the construction consortium) agreed on an opening date in late 2022. However, by December 2021, Metrolinx expected the line to be substantially complete by September 2022, but that it would not open to the public until several months later, possibly in 2023.
By late September 2022, Metrolinx had conceded the line would not be completed by the end of 2022 but would be ready for service in 2023.
, the budgeted cost of the project was $12.82billion.
In December 2022,
CBC News
CBC News is a division of the Canadian Broadcasting Corporation responsible for the news gathering and production of news programs on the corporation's English-language operations, namely CBC Television, CBC Radio, CBC News Network, and CBC.ca. ...
reported on confidential internal documents which indicated that Crosslinx had no "credible plan" to complete the line.
Future extensions towards
Toronto Pearson International Airport
Lester B. Pearson International Airport , commonly known as Toronto Pearson International Airport, is an international airport located in Mississauga, Ontario, Canada. It is the main airport serving Toronto, its metropolitan area, and the surro ...
in the west and the
University of Toronto Scarborough
The University of Toronto Scarborough, also known as U of T Scarborough or UTSC, is one of the three campuses that make up the tri-campus system of the University of Toronto. Located in Scarborough, Toronto, Ontario, Canada, the campus is set upo ...
in the east were approved by Toronto City Council in 2016.
In September 2020, assessment and pre-construction of the westward extension to
Renforth station
Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive (although the station entrance is on Commerce B ...
was being undertaken by Metrolinx.
History
Background
The origins of Line 5 Eglinton can be traced to the 1985
Network 2011
Network 2011 was a plan for transit expansion created in 1985 by the Toronto Transit Commission. It was centred on three proposed subway lines: the Downtown Relief Line, Eglinton West Line, and the Sheppard Line. Eventually only a portion of the Sh ...
plan conceived by the
Metro Toronto
The Municipality of Metropolitan Toronto was an upper-tier level of municipal government in Ontario, Canada, from 1953 to 1998. It was made up of the old city of Toronto and numerous townships, towns and villages that surrounded Toronto, which ...
government as the TTC and Metro began to install the busway along Eglinton. It was to be completed by 2003. In 1986, a coalition of City of York and Etobicoke Metro councillors and the
Region of Peel
The Regional Municipality of Peel (informally Peel Region or Region of Peel, also formerly Peel County) is a regional municipality in the Greater Toronto Area, Southern Ontario, Canada. It consists of three municipalities to the west and northwes ...
persuaded Metro Council to include an
Eglinton West line
The Eglinton West line was a proposed east–west subway line in Toronto, Ontario, Canada, whose construction began in 1994 but was cancelled in 1995. It was to start from the existing Eglinton West station on the Toronto Transit Commission's Y ...
in a new Transit Network Plan. Work on the subway line began in 1994 and was halted following the
election in 1995 which saw
Mike Harris
Michael Deane Harris (born January 23, 1945) is a Canadian retired politician who served as the 22nd premier of Ontario from 1995 to 2002 and leader of the Progressive Conservative Party of Ontario (PC Party) from 1990 to 2002. During his time ...
taking power and led to the cancellation of the Eglinton West line, with the existing tunnel quickly filled in.
Original concept
Line 5 Eglinton was originally conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 by Toronto mayor
David Miller and TTC chair
Adam Giambrone
Adam Giambrone (born March 8, 1977) is a Canadian transportation consultant and retired politician who served on Toronto City Council from 2003 to 2010, representing Ward 18 Davenport. Giambrone served as the chair of the Toronto Transit Commiss ...
. It was part of the Transit City plan, which included the implementation of six other light rail lines across Toronto. The original version of the line would have run from
Pearson Airport
Lester B. Pearson International Airport , commonly known as Toronto Pearson International Airport, is an international airport located in Mississauga, Ontario, Canada. It is the main airport serving Toronto, its metropolitan area, and the surro ...
along Silver Dart Drive to Convair Drive. The line would have then turned southwest to a bridge over
Highway 401
King's Highway 401, commonly referred to as Highway 401 and also known by its official name as the Macdonald–Cartier Freeway or colloquially referred to as the four-oh-one,
is a controlled-access 400-series highway in the Canadian provin ...
to reach Commerce Boulevard on the other side, where it would run south to reach Eglinton Avenue and the east end of the
Mississauga Transitway
The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, that ...
. The rest of the line would run east along Eglinton Avenue, including a portion along which the proposed
Eglinton West subway line would have been built. The line would then traverse the city, connecting with
Line 1 Yonge–University
Line 1 Yonge–University is a rapid transit line on the Toronto subway. It serves Toronto and the neighbouring city of Vaughan in Ontario, Canada. It is operated by the Toronto Transit Commission, has 38 stations and is in length, making it th ...
,
Line 2 Bloor–Danforth
Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 a ...
, and
Line 3 Scarborough
Line 3 Scarborough (originally known as the Scarborough RT or SRT) is a light rapid transit line that is part of the Toronto subway system in Toronto, Ontario, Canada. The line runs entirely within the suburban district of Scarborough, encompas ...
.
There were 43 stops planned for the Eglinton Crosstown LRT, 13 of which would be underground. Surface stops would be spaced on average apart and the underground stations would be apart on average, as constructing numerous underground stops would be costly. The average speed would be ,
compared with the existing bus routes along Eglinton that have an average speed of . The line would terminate at Kennedy station to the east in
Scarborough Scarborough or Scarboro may refer to:
People
* Scarborough (surname)
* Earl of Scarbrough
Places Australia
* Scarborough, Western Australia, suburb of Perth
* Scarborough, New South Wales, suburb of Wollongong
* Scarborough, Queensland, su ...
where it would meet Line 2 Bloor–Danforth, the proposed
Scarborough Malvern LRT
The Scarborough Malvern LRT was a proposed light rail line in Toronto, Ontario, Canada.
It was part of Transit City, a plan to develop new light rail lines along several priority transit corridors in the city. In January 2016, the plan for th ...
and the
Stouffville GO train line. The expected cost was billion. As a result of provincial funding cuts, construction of the line was divided into two phases: phase one would end at
Jane Street
Jane may refer to:
* Jane (given name), a feminine given name
* Jane (surname), related to the given name
Film and television
* ''Jane'' (1915 film), a silent comedy film directed by Frank Lloyd
* ''Jane'' (2016 film), a South Korean drama fil ...
, and phase two would terminate as had been planned at
Pearson Airport
Lester B. Pearson International Airport , commonly known as Toronto Pearson International Airport, is an international airport located in Mississauga, Ontario, Canada. It is the main airport serving Toronto, its metropolitan area, and the surro ...
.
Rob Ford–era redesigns
Miller's successor,
Rob Ford
Robert Bruce Ford (May 28, 1969 – March 22, 2016) was a Canadian politician and businessman who served as the 64th mayor of Toronto from 2010 to 2014. Before and after his term as mayor, Ford was a city councillor representing Ward 2 Etobi ...
, announced the cancellation of Transit City on December 1, 2010, the day he took office. He proposed an alternative titled the "Eglinton–Scarborough Crosstown line", which put the line along Eglinton Avenue completely underground. The line would have then followed the route of
Line 3 Scarborough
Line 3 Scarborough (originally known as the Scarborough RT or SRT) is a light rapid transit line that is part of the Toronto subway system in Toronto, Ontario, Canada. The line runs entirely within the suburban district of Scarborough, encompas ...
, thus forming a single line continuously from
Black Creek Drive
Black Creek Drive is a four lane north–south arterial road in Toronto, Ontario, Canada. It connects Weston Road and Humber Boulevard with Highway 401 via Highway 400, the latter of which it forms a southerly extension. Black Creek ...
to . The cost would almost double to $8.2billion and, compared to the original plan, 18 fewer stops were planned, including the elimination of the connection to Pearson Airport. Most of the additional cost would have come from putting 12 additional stations underground and for converting the Scarborough RT.
On February 8, 2012, in a special meeting, Toronto City Council, led by
Karen Stintz
Karen Stintz (born November 2, 1971) is a former Canadian politician who represented Ward 16 Eglinton—Lawrence on Toronto City Council from 2003 to 2014 and was the chair of the Toronto Transit Commission (TTC) from 2010 to 2014.
Background
Bor ...
, voted 25–18 to override Mayor Ford's modifications to the project.
The vote reinstated the original proposal to only construct the portion between Laird Drive and Keele Street underground while the remainder of the line is built along the surface.
On November 30, 2012, the environmental assessment was revised, such that the east tunnel portal location would be moved from east of Brentcliffe to east of Don Mills; however, this was reversed in May 2013 after receiving community feedback. In January 2013, city councillors from Scarborough put forward an alternative plan to proceed with the construction of the Eglinton Avenue portion of the line as planned but to exclude the Scarborough RT from the line. In July 2013, plans for an "Eglinton-Scarborough Crosstown" line were abandoned, thereby reverting the entire line back to the plan that had been conceived under Transit City.
Construction and implementation
Crosslinx
Crosslinx Transit Solutions (CTS), a consortium of more than 26 companies, was awarded the contract to design, build and finance the Eglinton Crosstown line and to maintain it for 30 years. The contract, which excludes boring the tunnels, is for completing all other remaining work, including the stations and the finishing work within the tunnels. Some of the members of the consortium are
SNC-Lavalin
SNC-Lavalin Group Inc. is a Canadian company based in Montreal that provides engineering, procurement, and construction (EPC) services to various industries, including mining and metallurgy, oil and gas, environment and water, infrastructure, a ...
,
Aecon
Aecon Group Inc. is a construction company in Canada, providing services to private and public sector clients across its three core segments of Infrastructure, Industrial, and Concessions.
Aecon produces construction materials including asphal ...
,
EllisDon
EllisDon is an employee-owned construction services company that was founded and incorporated in 1951 in London, Ontario, Canada, by brothers Don and David Ellis Smith. The company is headquartered in Mississauga, Ontario, Canada.
History
F ...
, ACS Infrastructure Canada, Dragados, IBI Group and
Scotiabank
The Bank of Nova Scotia (french: link=no, Banque de Nouvelle-Écosse), operating as Scotiabank (french: link=no, Banque Scotia), is a Canadian multinational banking and financial services company headquartered in Toronto, Ontario. One of Canada ...
. The contract defines a
public–private partnership
A public–private partnership (PPP, 3P, or P3) is a long-term arrangement between a government and private sector institutions.Hodge, G. A and Greve, C. (2007), Public–Private Partnerships: An International Performance Review, Public Administ ...
.
The 30-year contract to build and maintain the line will total $9.1billion. Capital costs will be $5.3billion, with each of the 15 underground stations costing $80–$100million to build and the ten street-level stops $3–$5million each. The remainder will be for financing, lifecycle and maintenance costs.
In July 2015, the Crosslinx Transit Solutions Maintenance General Partnership consortium awarded
Bombardier Transportation
Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany.
It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
a 30-year contract to maintain Line 5's light-rail vehicles. The contract was worth $403million.
Bombardier will also maintain wayside systems (track and overhead catenary) for Line 5.
Timeline
2010
On July 28, 2010, Metrolinx ordered four
tunnel boring machine
A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can be designed to bore throu ...
s (TBMs) from Caterpillar at a cost of $54million. Each TBM is long, in diameter and weighs . They bore per day, below the surface.
The TBMs were named Dennis, Lea, Humber, and Don. The names were chosen by Jason Paris, a moderator of the
UrbanToronto UrbanToronto is a website that covers various urban development topics within the city of Toronto, Ontario, Canada. In 2017, the website received over 2 million page views and 225,000 unique users every month, and had over 15,500 registered members. ...
blog and web forums. Dennis is named after
Mount Dennis
Mount Dennis is a neighbourhood in Toronto, Ontario, Canada. It is within the former suburb of York, now Ward 11 in Toronto. Primarily located along Eglinton Avenue between the Humber River and the Kitchener commuter rail line, the neighbourhoo ...
, Lea is named after
Leaside
Leaside (/'liːˌsaɪd/) is a neighbourhood in Toronto, Ontario, Canada. It is located northeast of Downtown Toronto, in the vicinity of Eglinton Avenue East and Bayview Avenue. The area takes its name from William Lea and the Lea family, who se ...
, Humber is named after the
Humber River, and Don is named after the
Don River
The Don ( rus, Дон, p=don) is the fifth-longest river in Europe. Flowing from Central Russia to the Sea of Azov in Southern Russia, it is one of Russia's largest rivers and played an important role for traders from the Byzantine Empire.
Its ...
. The names Dennis and Lea combined allude to the poet
Dennis Lee.
By the time all four machines reach Yonge Street, enough dirt will have been removed to fill the Air Canada Centre (renamed
Scotiabank Arena
Scotiabank Arena ( French: ''Aréna Scotiabank)'', formerly known as Air Canada Centre (ACC), is a multi-purposed arena located on Bay Street in the South Core district of Downtown Toronto, Ontario, Canada. It is the home of the Toronto Rap ...
in 2018) to the height of the
CN Tower
The CN Tower (french: Tour CN) is a concrete communications and observation tower in downtown Toronto, Ontario, Canada. Built on the former Railway Lands, it was completed in 1976. Its name "CN" referred to Canadian National, the railway c ...
.
2011
In October 2011, the first part of tunnel construction began with the construction of a launch shaft for tunnel boring machines at Black Creek Drive.
On November 9, 2011, in Keelesdale Park, Mayor Rob Ford and Premier
Dalton McGuinty
Dalton James Patrick McGuinty Jr. (born July 19, 1955) is a former Canadian politician who served as the 24th premier of Ontario from 2003 to 2013. He was the first Liberal leader to win two majority governments since Mitchell Hepburn nearl ...
officially broke ground on the new project.
2012
In May 2012, TTC staff released a report saying that completion of the Eglinton Crosstown was unlikely by 2020 and that a more realistic in-service date would be 2022–2023. The main reason given was that the project management had been transferred from the TTC to Infrastructure Ontario which uses the Alternative Finance and Procurement strategy. That strategy would use a private contractor to complete the project, effectively requiring that contractor to redo all design work already completed by the TTC.
The TTC also warned that Metrolinx's aggressive timeline would lead to severe construction-related disruptions to communities and traffic because large stretches of the Eglinton Avenue would have to be torn up concurrently to meet deadlines.
2013
In January 2013,
Infrastructure Ontario
The Ministry of Infrastructure is a ministry responsible for public infrastructure in the Canadian province of Ontario. The current minister is Kinga Surma.
It is currently responsible for two crown agencies: Waterfront Toronto and Infrastructure ...
issued a
request for qualifications
A request for qualifications (RFQ) is a step sometimes used in the formal process of procuring a product or service, for example by a government agency. It is typically used as a screening step to establish a pool of vendors (businesses or individ ...
to shortlist companies to construct the line. A
request for proposal was expected in mid-2013.
On February 22, 2013, TBMs Dennis and Lea arrived in Keelesdale Park.
In June 2013, the TBMs Dennis and Lea began tunnelling on the line. Traffic on Eglinton Avenue near Keele Street was reduced to one lane in each direction.
On November 12, 2013, Metrolinx awarded a contract to a joint venture between Aecon Group and ACS Dragados Canada to construct the eastern portion of the line between Yonge Street and Laird Drive.
2014
In March 2014, work began to clear utilities and trees on the south side of Eglinton Avenue just east of Brentcliffe Road in order to set up the eastern launch shaft. For two and a half years, traffic around the excavation site will be reduced from two to one lane in each direction. West of the site, more lane restrictions would go into effect to construct head walls (below-ground walls that form the ends of each subway station) at the future Laird, Bayview and Mt. Pleasant stations. There will also be lane restrictions for two years near Hanna Road to build an emergency exit near
Leaside High School
Leaside High School (LHS) is a school of between 900 and 1000 pupils in central-east Toronto, Ontario, Canada, at the corner of Eglinton and Bayview Avenues. The school was established in 1945 by the Leaside Board of Education and is located in ...
.
By April 2014, the TBMs had arrived at
Caledonia station
Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and ...
.
In April 2014, ''
The Globe and Mail
''The Globe and Mail'' is a Canadian newspaper printed in five cities in western and central Canada. With a weekly readership of approximately 2 million in 2015, it is Canada's most widely read newspaper on weekdays and Saturdays, although it ...
'' reported that the two western tunnel boring machines were excavating "approximately 1,000 cubic yards of spoil", per day.
For the year prior to May 2014, the two TBMs Dennis and Lea had been excavating and installing concrete tunnel liners at a rate of approximately per day.
The tunnels are lined with precast concrete liner segments. Six segments form each ring.
In early December 2014, Dennis and Lea arrived at Eglinton West station. Dennis stopped to allow Lea to catch up, so that they would arrive at Eglinton West station at the same time.
2015
On the weekend of April 18 and 19, 2015, the boring machines, Dennis and Lea, were lifted out of a shaft west of Allen Road and moved about to a shaft just east of Allen Road.
In April 2015, merchants along Eglinton Avenue West were complaining of lost revenue (up to a 35 percent dip in sales), because construction was discouraging customers with snarled traffic, limited parking options, reduced foot traffic and dusty sidewalks.
By September 2015, the TBMs Don and Humber arrived for assembly in the shaft at Brentcliffe Road before starting to drill the section west to Yonge Street.
On September 24, 2015, Transportation Minister
Steven Del Duca
Steven Alfonso Del Duca (born July 7, 1973) is a Canadian politician who has been serving as the 5th mayor of Vaughan since 2022. Del Duca previously served as the leader of the Ontario Liberal Party from 2020 to 2022 and was an Ontario cabin ...
issued a statement saying the Crosstown would not operate until September 2021, in order "to mitigate disruption to the local community and infrastructure as much as possible." The earlier plan had been to open in 2020 with tunnelling and station construction to start in 2012. Infrastructure Ontario has awarded the Crosstown construction contract to Crosslinx, a consortium led by SNC Lavalin. It will take about four years to build the stations, 15 of which will be underground.
On September 29, 2015, TBM Don started to bore the north tunnel from the Brentcliffe Road launching site westwards towards Yonge Street. TBM Humber will start boring the south tunnel approximately one month later.
On November 3, 2015, Del Duca announced that the contract awarded to Crosslinx Transit Solutions to complete the Crosstown and maintain it for 30 years will cost $2billion less than originally estimated.
2016
On March 10, 2016, a ground-breaking ceremony was held at the site of
Keelesdale station
Keelesdale is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that will be part of the Toronto subway system. It will be located in the Silverthorn neighbourhood at the intersection of Keele S ...
, the first station to be started for construction along the Eglinton Crosstown line.
In February 2016, work began on the extraction shaft for TBMs Humber and Don, which are digging the eastern segment of the line.
However, the hole in the street there will be much smaller than the one near Leslie Street.
On April 18, 2016, at the location of the future
Forest Hill station, the façade of the former House of Chan restaurant and the scaffolding that was holding it up collapsed, injuring seven people.
On May 10, TBMs Dennis and Lea, which had been boring the western segment of the line, completed their work by reaching Yonge Street.
Dennis and Lea bored , installing 25,647 precast concrete tunnel segments to construct the 4,279 rings to line the twin tunnels.
On August 17, TBMs Don and Humber, which had been boring the eastern segment of the line, completed their work by reaching Yonge Street. Don and Humber bored , installing 26,178 precast concrete tunnel segments to construct the 4,363 rings to line the twin tunnels.
On September 1,
Bombardier Transportation
Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany.
It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
, which is producing cars for the line, failed to meet the delivery deadline for the pilot vehicle.
As a result, Metrolinx filed notice to terminate the contract with Bombardier.
On November 3, 2016, Metrolinx filed a "notice of intention" to cancel its contract with Bombardier for the Crosstown's rolling stock.
2017
On February 10, 2017, Bombardier filed an injunction, seeking to compel Metrolinx to stick with their contract.
Metrolinx responded that Bombardier did deliver a prototype for testing, as required by the contract. However, Metrolinx claimed that the prototype was so incomplete that it would not power up.
Between March 13 and 17, the TBMs Don and Humber were removed in pieces from the extraction shaft on Eglinton Avenue just east of Yonge Street.
In July 2017, construction crews began preparation for constructing the eastern at-grade portion of the line
by removing the median in the roadway.
On August 9, the first piece of track, a
turnout, was installed at the
Eglinton Maintenance and Storage Facility
The Eglinton Maintenance and Storage Facility is a rail yard and vehicle service centre for Line 5 Eglinton of the Toronto subway. The facility is located near the line's western terminus at Mount Dennis station, on lands formerly occupied by Kodak ...
(EMSF) in Mount Dennis. The facility was scheduled for completion in late 2018,
but construction is now expected to be complete in early 2019.
2018
In July 2018, Crosslinx Transit Solutions, the construction company building the LRT line, sued Metrolinx, claiming that utility work prior to construction exceeded timelines Metrolinx had specified. Crosslinx sought to extend the 2021 deadline for the opening of the transit line by one year.
In August 2018, Metrolinx submitted a filing with the Ontario Superior Court of Justice to dismiss the lawsuit. This was based on an agreement with Crosslinx to resolve disputes only after construction has been completed. The lawsuit was settled by Metrolinx in September 2018 under undisclosed terms. It was revealed by the
Auditor General of Ontario
The Auditor General of Ontario is an independent officer of the Legislative Assembly of Ontario to aid accountability by conducting independent audits of Ontario provincial government operations. The office was created in 1869.
Office
The Aud ...
that one of the terms included an additional $237million to be paid to Crosslinx for an assurance to meet Metrolinx's 2021 deadline.
In October 2018, the Eglinton Maintenance and Storage Facility was substantially complete.
By December 2018, of track had been installed. The line requires of track in total.
2019
On January 8, 2019, Bombardier delivered the first Flexity Freedom vehicle to the Eglinton Maintenance and Storage Facility, which, according to Metrolinx, was "substantially complete and ready to receive the vehicles" by this date.
In January 2019, the first concrete pour for the surface section occurred at the location of the future
O'Connor stop
Line 5 Eglinton (also known as the Eglinton Crosstown or the Crosstown) is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part o ...
at Eglinton Square. Before being encased in concrete, conduit pipes were laid to support communications and power cables for the Crosstown's stations and stops.
From July 1 to late August 2019, Leslie Street at Eglinton Avenue was closed for the installation of tracks and infrastructure at the intersection. During this time, the TTC 51 Leslie bus route turned back at Leslie and Eglinton at a temporary bus loop. The temporary closure allowed work to be completed in one section instead of two, thus eliminating joints in the road and track. This provided a higher quality result, reducing future maintenance. The closure also reduced the construction period at the intersection from six months to two.
In November 2019, Crosslinx informed Metrolinx that it expected the line not to be completed before May 6, 2022, and that the construction costs would total $12.58billion, an increase of $330million over previous estimates. The main problems reported were defective caissons (underground watertight compartments) built in the 1950s at Eglinton station, groundwater at the Avenue station site and construction difficulties at the CP Rail bridge adjacent to the Mount Dennis station.
On December 14, 2019, testing began between the Eglinton Maintenance and Storage Facility and the Western portal using Flexity Freedom vehicles, initially testing track clearances at slow speed. On December 17, Crosslinx conducted an inaugural run with staff and guests from the handover platform at the EMSF to the elevated guideway over Black Creek Drive. At that time, overhead wire had been installed between the EMSF to just short of the Keelesdale platform.
2020
As of the end of January 2020, Crosslinx had laid 50 percent of the line's track.
In February 2020, Metrolinx announced that the line would not open until "well into 2022", a delay from the previous target of September 2021.
This was despite Metrolinx reaching a settlement with Crosslinx the previous year, paying the consortium $237million to commit to a September 2021 deadline.
Metrolinx cited reasons for the delay: Crosslinx had started work nine months late, and had been slow to finalize some aspects of the design. Also, at
Eglinton station
Eglinton is a subway station on Line 1 Yonge–University of the Toronto subway. Located on Eglinton Avenue, it is central to the Yonge–Eglinton neighbourhood in Midtown Toronto. Eglinton station is the seventh busiest station of the Toronto T ...
, pipes embedded in concrete built in the 1950s were discovered in a position that impeded excavation for the Crosstown under Line 1 Yonge–University.
In early March 2020, the provincial government announced it would provide $3million in aid to local merchants negatively affected by Crosstown construction near their businesses. The Ministry of Transportation and Metrolinx also announced that they would look into an earlier, partial opening of the Crosstown line.
By March 2020, Crosslinx had installed the first passenger-waiting shelter on the surface section of the line at the
Pharmacy stop
Line 5 Eglinton (also known as the Eglinton Crosstown or the Crosstown) is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part ...
. The shelters were pre-fabricated and hoisted into position on the LRT boarding platform.
On March 9, 2020, Crosslinx began work to extract tunnel boring machines Dennis and Lea at Duplex Avenue, one block west of Yonge Street.
On May 4, 2020, Metrolinx reported the first test trip by a light rail vehicle (LRV) in a Line 5 tunnel. The trip was from the maintenance and storage facility to just short of the platform at the underground Keelesdale station. The test run was to check clearances, trackwork, and overhead power and communications; it involved several movements in and out of the tunnel at speeds of up to .
On October 1, 2020, Crosslinx proposed partially opening Line 5 on February 28, 2022, with the Line 5 portion of Eglinton station not opening until May 2022. However, the direct connection for riders transferring between Lines 1 and 5 at Eglinton station would not be completed until September 2022; until then, passengers who wished to transfer would need to exit to the surface and descend by the entrance next door. Crosslinx says defective infrastructure from 1954 at Eglinton station, difficult hydrogeological conditions and the
COVID-19 pandemic
The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identif ...
had hindered the project.
Moody's Investors Service
Moody's Investors Service, often referred to as Moody's, is the bond credit rating business of Moody's Corporation, representing the company's traditional line of business and its historical name. Moody's Investors Service provides international ...
also reported delays at Kennedy, Forest Hill, Mount Pleasant and Cedarvale stations.
On October 8, Crosslinx filed a lawsuit against Metrolinx and Infrastructure Ontario, claiming $134million in unexpected costs due to the pandemic. Metrolinx countered that Crosslinx had been falling behind schedule before the pandemic.
In early December 2020, the first pieces of artwork were being installed at Science Centre and Mount Dennis stations.
2021
By early April 2021, tracks had been laid on the surface into the Brentcliffe Portal just east of Brentcliffe Road. This location will be the transition between underground and surface running on Line 5 between
Laird station and the
Sunnybrook Park stop
Sunnybrook Park is a surface light rail, light rail transit stop under construction on Line 5 Eglinton, a future line that will be part of the Toronto subway system. It will be located at the intersection of Leslie Street (Toronto), Leslie Stree ...
.
In addition, as of April 2021, 85 percent of track had been installed along the entire line.
In April 2021, the last concrete "invert pour" on the line was completed at
Eglinton station
Eglinton is a subway station on Line 1 Yonge–University of the Toronto subway. Located on Eglinton Avenue, it is central to the Yonge–Eglinton neighbourhood in Midtown Toronto. Eglinton station is the seventh busiest station of the Toronto T ...
. The invert pour created the station's base level slab (also called an "invert"), which lies over the "mudslab", a concrete layer that sits on top of the earth.
On May 3, 2021, Crosslinx energized the overhead catenary system between Laird and Kennedy stations for testing purposes. Traction power substations along the surface route supply electricity to the catenary; there will be 15 such substations.
On May 17, 2021, Crosslinx won a case in Ontario Superior Court against Metrolinx and Infrastructure Ontario to allow compensation for the extra construction costs and project delays due to the pandemic. The court decision allowed Crosslinx to negotiate with the two provincial agencies for financial compensation and a later completion date. (The completion per the contract was to have been September 2021, later revised to 2022 by Metrolinx.) Crosslinx sought approximately $134million in compensation for extra safety measures, absenteeism and supply-chain problems due to the COVID-19 pandemic.
Between May 25 and June 2, 2021, six LRVs were delivered by truck from the
Eglinton Maintenance and Storage Facility
The Eglinton Maintenance and Storage Facility is a rail yard and vehicle service centre for Line 5 Eglinton of the Toronto subway. The facility is located near the line's western terminus at Mount Dennis station, on lands formerly occupied by Kodak ...
to Eglinton Avenue East and Rosemount Drive along the eastern end of the line. After unloading, each LRV (powered by the catenary) ran westwards to be stored within the Brentcliffe portal. (Until this point, only the section west from
Caledonia station
Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and ...
had been operational for testing trains.) Clearance and static testing was scheduled to take place in June with LRVs moving at walking speed.
Effective June 20, 2021, the TTC renumbered the Avenue Rd bus route from 5 to 13 in order to free up the route number 5 for the Eglinton line.
By July 2021, 93 percent of the rail had been installed along the line. At
Chaplin station
Chaplin is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Forest Hill neighbourhood at the intersection of Chaplin Crescen ...
, track work was being completed. However, at neighbouring
Avenue station
Avenue is an underground light rail, light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. The station is located in North Toronto on Eglinton Avenue between Avenue Road and ...
, concrete was still being poured in the tunnel at one end of the station box.
Until late August 2021, Crosslinx had tested the interaction between the vehicles and communications and signal systems east of the Brentcliffe portal. Vehicles ran at slow speeds. On August 24, 2021, Crosslinx started a new phase of testing east of the Brentcliffe portal involving coupled vehicles, increased speed, braking and concurrent vehicle operation.
By early October 2021, Crosslinx was finishing the trackwork at Eglinton station, which included a crossover.
By November 1, 2021, the last section of track was laid under Yonge Street at Eglinton station, making the rails continuous between Mount Dennis and Kennedy stations. Full completion of the catenary, signals and the communication system was not expected until 2022.
In November 2021, an LRV travelled from the EMSF to Laird station under its own power at slow speed in order to test clearances and systems along the way; the section between Laird and Fairbank stations had limited power. Then, the three coupled pairs of LRVs stored at Laird station were driven back to the EMSF for maintenance and replaced by two trains for further testing of the line east of Laird station.
By December 2021, Metrolinx and Infrastructure Ontario had come to a settlement with Crosslinx to pay the consortium an extra $325million to handle additional costs due the COVID-19 pandemic and due to an unexpected obstruction at Eglinton station that was impeding construction. The line was expected to be substantially complete by September 2022 but possibly not be open until 2023.
2022
By late February 2022, the last signal to control LRT train movements along the line was installed in the tunnel at
Laird station.
In March 2022, Metrolinx announced that all 76 of the light rail vehicles had been brought together at the Eglinton Maintenance and Storage Facility, the fleet's final deliveries having arrived in 2021.
In July 2022, Metrolinx started to test three-car trains together with the train control system along the line. Three-cars is the maximum train length for the line and can carry up to 490 passengers.
In late September 2022, Metrolinx announced that Crosslinx was behind schedule and thus Line 5 would not be completed by year-end as was previously expected. Metrolinx did not provide a revised completion date.
However,
CBC Toronto cited an unnamed source with knowledge of the project who stated that Line 5 would likely be delayed a year, until September 2023. The completion of underground stations was behind schedule, particularly at Eglinton station where tunnelling under Line 1 was difficult.
According to an internal Metrolinx report from September 2022, Crosslinx had expected to complete the project by March 2023, but Metrolinx felt that date to be unrealistic. Metrolinx blamed Crosslinx and old infrastructure at Eglinton station for project delays. Metrolinx also had complaints about deficiencies in work completed. Crosslinx had over $260 million in outstanding claims against Metrolinx.
In December, CBC Toronto obtained confidential documents from Metrolinx which indicated that the company did not believe Crosslinx had a "credible plan" to complete the line. The records stated that 98 percent of construction and engineering work was completed at the time of their writing, while only 79 percent of track and train testing had been completed.
Unique station names
In the planning stages for Line 5 Eglinton, many stations and stops were given working names identical or similar to names of existing subway stations or
GO Transit stations within Toronto. On November 23, 2015, a report to the TTC Board recommended giving a unique name to each station within the subway system, including those on Line 5. Thus, several stations with non-unique working names were renamed, even those which will be comparatively simple on-street surface stops: Weston (renamed Mount Dennis), Keele (Keelesdale), Dufferin (Fairbank), Bathurst (Forest Hill), Oriole Park (Avenue), Bayview (Leaside), Leslie (Sunnybrook Park), Don Mills (Science Centre), Victoria Park (O'Connor) and Warden (Golden Mile). Despite its unique name, Eglinton West station will be renamed Cedarvale to avoid confusion with Eglinton station.
Eglinton station is not expected to be renamed "Eglinton–Yonge" (as was the case with
Sheppard–Yonge station
Sheppard–Yonge (formerly Sheppard) is an interchange station on Line 1 Yonge–University and Line 4 Sheppard of the Toronto subway. The station is located at the southern end of North York City Centre. It is the fourth-busiest station in the ...
, which was named "Sheppard" before
Line 4 Sheppard
Line 4 Sheppard is the newest and shortest subway line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November 22, 2002, and has five stations along of track, which is built without any open sectio ...
opened) given that Eglinton station is located in
the former village of Eglinton. Alternate names for stations along the under-construction
western extension at cross streets (
Kipling Avenue
Kipling Avenue is a street in the cities of Toronto and Vaughan in Ontario, Canada. It is a concession road, 6 concessions (12 km) west from Yonge Street, and is a major north–south arterial road. It consists of three separate section ...
, Islington Avenue,
Royal York Road
Royal York Road, historically known as Church Street or New Church Street, is a north-south arterial road in Toronto, Ontario, Canada. It is a concession road, 5 concessions (10 km) west of Yonge Street, and runs through many residential ne ...
, and Jane Street) with existing stations on
Line 2 Bloor–Danforth
Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 a ...
have not yet been announced.
Route
Right-of-way
Line 5 Eglinton will run
underground
Underground most commonly refers to:
* Subterranea (geography), the regions beneath the surface of the Earth
Underground may also refer to:
Places
* The Underground (Boston), a music club in the Allston neighborhood of Boston
* The Underground (S ...
for from Mount Dennis to just east of Brentcliffe Road before rising to the surface to continue another to end at Kennedy station. A short portion of the line across the
Black Creek valley will be
elevated
An elevated railway or elevated train (also known as an el train for short) is a rapid transit railway with the Track (rail transport), tracks above street level on a viaduct or other elevated structure (usually constructed from steel, cast i ...
, between Mount Dennis and Keelesdale stations. The right-of-way will have of track, including six double
crossover
Crossover may refer to:
Entertainment
Albums and songs
* ''Cross Over'' (Dan Peek album)
* ''Crossover'' (Dirty Rotten Imbeciles album), 1987
* ''Crossover'' (Intrigue album)
* ''Crossover'' (Hitomi Shimatani album)
* ''Crossover'' (Yoshino ...
s, five mono-directional crossovers and three
pocket track
A pocket track, tail track, or reversing siding (UK: centre siding , turnback siding) is a rail track layout which allows trains to park off the main line. This type of track layout differs from a passing loop in that the pocket track is usually ...
s.
Parts of the surface route will use "
green track", that is, track with vegetation growing beside and between the rails. Green track will be used between the Brentcliffe Road tunnel portal (western end of the surface route) and Birchmount Road (
Birchmount stop
Birchmount is a surface light rail transit (LRT) stop under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Ionview neighbourhood at the intersection of Eglinton Avenue and Birchmo ...
in the east end) with paved gaps at intersections, surface stops and the underground Science Centre station.
Each section of green track will have irrigation chambers, a water supply, and an energy source for the irrigation system. Green track will dampen train sounds, absorb runoff water, reduce ambient temperatures in summer and minimize the spread of dust.
Surface stops will be located at accessible, signalized intersections, and will have a transparent design for passenger security. Platforms will have a sign post bearing the stop's name, a barrier along the road to protect waiting passengers, Presto machines, screens displaying the next vehicle arrival time, platform illumination and covered waiting shelters with benches and a passenger assistance intercom. The platforms will be designed for level boarding.
Stations and stops
Public art
As part of the Crosstown project, six stations along Line 5 Eglinton
Mount Dennis
Mount Dennis is a neighbourhood in Toronto, Ontario, Canada. It is within the former suburb of York, now Ward 11 in Toronto. Primarily located along Eglinton Avenue between the Humber River and the Kitchener commuter rail line, the neighbourhoo ...
,
Caledonia
Caledonia (; ) was the Latin name used by the Roman Empire to refer to the part of Great Britain () that lies north of the River Forth, which includes most of the land area of Scotland. Today, it is used as a romantic or poetic name for all ...
,
Cedarvale (Eglinton West),
Eglinton,
Science Centre
A science museum is a museum devoted primarily to science. Older science museums tended to concentrate on static displays of objects related to natural history, paleontology, geology, industry and industrial machinery, etc. Modern trends in mu ...
and
Kennedy
Kennedy may refer to:
People
* John F. Kennedy (1917–1963), 35th president of the United States
* John Kennedy (Louisiana politician), (born 1951), US Senator from Louisiana
* Kennedy (surname), a family name (including a list of persons with t ...
will feature eight artworks. These stations were chosen because they are all interchange stations expected to host higher passenger volumes.
Some of the other stations feature photographs, such as
pick-up sticks
Pick-up sticks, pick-a-stick, jackstraws, jack straws, spillikins, spellicans, or fiddlesticks is a game of physical and mental skill in which a bundle of sticks, between 8 and 20 centimeters long, is dropped as a loose bunch onto a table to ...
at
Oakwood station.
All artworks will be integrated into station design and construction rather than being stand-alone pieces. Because of the controversy over the artwork ''LightSpell'' at
Pioneer Village station
Pioneer Village is a subway station on the Line 1 Yonge–University of the Toronto subway. It is located under the intersection of Northwest Gate and Steeles Avenue, at the city boundaries of Toronto and Vaughan, Ontario, Canada. A Toronto Trans ...
, in which commuters can display messages that can violate the 2009 revision of TTC's By-Law No. 1 that prohibits the use of inappropriate language, none of the Line 5 artworks will be interactive. The art budget is about $10million. About $1million of that budget will be used for digital art to appear on screens at stations along the line.
Operations
Operating characteristics of the line include:
* There will be three types of train control on the line.
Automatic train control
Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver do ...
(ATC) without a driver onboard is used within the Eglinton Maintenance and Storage Facility. In the underground segment between Mount Dennis and Laird stations, a driver will operate train doors and push a button to depart a station, with ATC controlling the train until the next station. Between Laird and Kennedy stations, the driver controls all train functions.
* On the surface, the line will have dedicated right-of-way transit lanes separate from regular traffic
and usage of priority signalling at intersections to ensure certainty in travel times – unlike the
streetcars in downtown Toronto or
on St. Clair Avenue.
* Light rail vehicles and subways can both travel up to . However, actual speed is determined by the spacing of the stops and the dwell times at stops. Line 5 vehicles will have an average speed of . As a comparison, the average speed of the
Line 2 Bloor–Danforth
Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 a ...
subway is .
The maximum operating speed will be on the tunnelled portion of the line and on the street-level sections.
* The projected ridership of the line is 5,400 passengers per hour in the peak direction by 2031, but the capacity of the vehicles is 15,000 passengers per hour per direction.
* The surface section of the line will run on a
proof-of-payment
Proof-of-payment (POP) or proof-of-fare (POF) is an honor-based fare collection system used on many public transportation systems. Instead of checking each passenger as they enter a fare control zone, passengers are required to carry a ticket, pa ...
system but the underground stations will have subway-type fare gates and staff;
Presto card
The Presto card (stylized as PRESTO) is a contactless smart card automated fare collection system used on participating public transit systems in the province of Ontario, Canada, specifically in Greater Toronto, Hamilton, and Ottawa. Presto car ...
s will be available for use across the entire line.
* Metrolinx requires 76
Flexity Freedom
The Alstom Flexity Freedom is a low-floor, articulated light rail vehicle developed by Bombardier Transportation (and later Alstom) for the North American market. It is marketed as part of the Bombardier Flexity family which includes other ...
LRVs to operate the line.
* Annual operating and maintenance costs are estimated to be $80million upon opening of the line. However, fare revenue and the costs saved by eliminating Eglinton bus service would result in a net annual cost of $39million.
* There will a total of 12
crossovers
Crossover may refer to:
Entertainment
Albums and songs
* ''Cross Over'' (Dan Peek album)
* ''Crossover'' (Dirty Rotten Imbeciles album), 1987
* ''Crossover'' (Intrigue album)
* ''Crossover'' (Hitomi Shimatani album)
* ''Crossover'' (Yoshino ...
along the line to reverse LRT trains—seven at underground stations and five on the surface section. Avenue and Laird stations will also have a
storage track (with Laird having both) that trains can enter and exit in either direction. The storage tracks will accommodate a train in case of an emergency or change in service as well as allowing for a change of direction.
* Line 5 will use a guideway intrusion detection system (GIDS) to detect trespassers on the tracks on the underground sections of the line. When GIDS detects a trespasser on the tracks, it will issue an audio warning to the trespasser, provide live CCTV video to central control, and automatically stop the train without driver intervention. Each station will have ten GIDS scanners, five on each side of the platform. There will also be GIDS scanners at each tunnel portal. In addition, there will be three scanners within the yellow tactile strips at each platform edge to issue an audio warning if a person steps on it before the train has arrived.
Rolling stock
As the line is owned by the province of Ontario, Metrolinx chose the Bombardier
Flexity Freedom
The Alstom Flexity Freedom is a low-floor, articulated light rail vehicle developed by Bombardier Transportation (and later Alstom) for the North American market. It is marketed as part of the Bombardier Flexity family which includes other ...
light rail vehicle, which uses
standard gauge
A standard-gauge railway is a railway with a track gauge of . The standard gauge is also called Stephenson gauge (after George Stephenson), International gauge, UIC gauge, uniform gauge, normal gauge and European gauge in Europe, and SGR in Ea ...
rather than the
TTC's own slightly larger gauge. Metrolinx wanted to avoid using a custom gauge in order to secure a better price from the manufacturer and to create a standard for other light-rail projects in the province.
The vehicles have an operator's cab at only one end of the vehicle; thus, the LRVs must be run in back-to-back coupled pairs.
Trains will use
automatic train control
Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver do ...
within the tunnelled portion of the line.
Like the
Flexity Outlook
The Bombardier Flexity Outlook is a series of low-floored, articulated light-rail trams manufactured by Bombardier Transportation. Part of the larger Bombardier Flexity product line (many of which are not low-floor), Flexity Outlook vehicles are ...
vehicles Bombardier built for the
TTC's streetcar system, initial work building the chassis was performed at Bombardier's Mexican plant in
Ciudad Sahagún
Ciudad Sahagún, officially called Fray Bernardino de Sahagún; is a town in the municipality of Tepeapulco, within the State of Hidalgo (state), Hidalgo, in Mexico.
History
Antecedents
In the early 1950s, by order of President Miguel Alemán V ...
,
Hidalgo
Hidalgo may refer to:
People
* Hidalgo (nobility), members of the Spanish nobility
* Hidalgo (surname)
Places
Mexico
* Hidalgo (state), in central Mexico
* Hidalgo, Coahuila, a town in the north Mexican state of Coahuila
* Hidalgo, Nuevo Le ...
, with final assembly at Bombardier's plant in
Thunder Bay
Thunder Bay is a city in and the seat of Thunder Bay District, Ontario, Canada. It is the most populous municipality in Northwestern Ontario and the second most populous (after Greater Sudbury) municipality in Northern Ontario; its population ...
.
In 2010, Metrolinx had ordered 182 Flexity Freedom vehicles not only for Line 5 but for other light-rail projects in Ontario. The first two deliveries were expected in the second quarter of 2015 but had not arrived by May 2017. After being unsure if a timely delivery of the Bombardier vehicle order could be relied upon, Metrolinx reduced the Bombardier order from 182 to 76 to supply just Line 5 and made a contingency order with
Alstom
Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
for 61
Citadis Spirit
The Alstom Citadis Spirit is a low-floor articulated light rail vehicle developed by Alstom for Ottawa's O-Train. It is marketed as part of its Alstom Citadis family, which includes other models of light rail vehicles, and is based on the Cita ...
vehicles, of which 44 would be for Line 5 and the remaining 17 for
Line 6 Finch West
Line 6 Finch West, also known as the Finch West LRT, is a light rail line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The , 18-stop line is to extend from Finch West station on Line 1 Yonge ...
. If the Flexity order did arrive after all, surplus Alstom vehicles would be used on other Metrolinx projects (most likely the
Hurontario LRT
The Hurontario LRT (formerly the Hurontario–Main LRT) is a light rail line under construction in the cities of Mississauga and Brampton, Ontario, Canada. The line will run along Hurontario Street from Mississauga's Port Credit neighbourhood ...
in Mississauga in
Peel Region).
On October 30, 2018, Bombardier announced that the first Flexity Freedom vehicle had completed its in-house testing and would be delivered for on-site testing in Toronto in November 2018.
However, the first vehicle arrived late, on January 8, 2019.
As a commissioning test, each vehicle must travel before accepting passengers.
Eglinton Maintenance and Storage Facility
A maintenance and storage facility is required for Line 5, given the new technology employed, track gauge and the number of vehicles ordered. The Eglinton Maintenance and Storage Facility will have storage for 162 Flexity Freedom LRT vehicles and have extensive maintenance facilities to keep them running smoothly.
The facility is being built near the line's western terminus at Mount Dennis station on lands formerly occupied by
Kodak
The Eastman Kodak Company (referred to simply as Kodak ) is an American public company that produces various products related to its historic basis in analogue photography. The company is headquartered in Rochester, New York, and is incorpor ...
's
Toronto campus and near the Mount Dennis bus garage.
Extensions
Under Mayor
John Tory
John Howard Tory (born May 28, 1954) is a Canadian politician who has served as the 65th and current mayor of Toronto since 2014.
After a career as a lawyer, political strategist and businessman, Tory ran as a mayoral candidate in the 2003 ...
, Toronto City Council approved two extensions for Line 5 Eglinton, to the east and to the west, on March 31, 2016.
The Eglinton West LRT is a Metrolinx project under construction.
The Eglinton East LRT is a City of Toronto project still in the proposal stage. However, , the Eglinton East LRT has become a proposal for a separate line rather than an extension of Line 5.
Eglinton West LRT
Surface station plan (2007–2019)
In a later phase, Metrolinx had planned for the Eglinton Crosstown to be extended westwards from Mount Dennis along Eglinton Avenue West to Toronto Pearson International Airport. However, during the
2014 Toronto mayoral election, John Tory proposed
SmartTrack
SmartTrack is a municipal proposal to enhance GO Transit rail service within Toronto, Ontario, Canada. It takes advantage of the province's existing GO Transit Regional Express Rail plans. SmartTrack has evolved since it was originally proposed b ...
, which would have included a heavy rail transit line established along this section of Eglinton Avenue.
In 2016, the
City of Toronto
Toronto ( ; or ) is the capital city of the Provinces and territories of Canada, Canadian province of Ontario. With a recorded population of 2,794,356 in 2021, it is the List of the largest municipalities in Canada by population, most pop ...
released a feasibility report that found this proposal would have significant capital costs ranging from $3.6billion to $7.7billion. In comparison, extending the Eglinton Crosstown as approved would cost $1.3billion. It was also found that a light rail transit line would attract higher ridership than a heavy rail line.
The City of Toronto's chief planner recommended the extension of the Eglinton Crosstown line (referred to as Crosstown West) to Pearson Airport in lieu of establishing SmartTrack on Eglinton Avenue, based upon negative community impacts, higher costs, and lower projected ridership associated with a heavy rail corridor.
On January 19, 2016, Tory agreed with the analysis and supported Metrolinx's original plan of extending the Crosstown. Tory included the Crosstown West as a light-rail component of his SmartTrack plan.
In June 2016, the estimated completion date was 2023.
The estimated cost to build the Eglinton West LRT was $2.47billion of which the City of Toronto would contribute $1.18billion, the federal government would contribute $822.9million, and the
City of Mississauga
Mississauga ( ), historically known as Toronto Township, is a city in the Canadian province of Ontario. It is situated on the shores of Lake Ontario in the Regional Municipality of Peel, adjoining the western border of Toronto. With a popul ...
and the
Greater Toronto Airports Authority
The Greater Toronto Airports Authority (GTAA; french: Autorité aéroportuaire du Grand Toronto) operates Toronto Pearson International Airport in Mississauga, Ontario, west of Toronto, Ontario, Canada. Toronto Pearson is Canada's largest airport ...
(GTAA) would be asked to contribute $470million for the portion of the line in Mississauga. Approvals for the financing were still to be secured as of November 2, 2016.
Public meetings for the extension, renamed the Eglinton West LRT, began November 13, 2017.
The 2010 Environmental Assessment for Transit City originally considered an entirely at-grade light rail line running west from Weston Road and Mount Dennis station. However, by October 2017, the City was considering grade separation using fly-overs and fly-unders at six intersections: Martin Grove Road, Kipling Avenue, Islington Avenue, Royal York Road, Scarlett Road, and Jane Street, with surface running between stations.
On November 21, 2017, city staff recommended just 10 stops along Eglinton West between Mount Dennis station and
Renforth station
Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive (although the station entrance is on Commerce B ...
on the Mississauga Transitway. The most recent recommendation dropped the stops at Rangoon, East Mall, and Russell / Eden Valley.
At a City executive committee meeting on November 28, 2017, city staff recommended building the extension without any grade separation. City staff had concluded that a fully at-grade extension would provide better access for transit users and have fewer environmental impacts. Grade separation would have little improvement on traffic because the at-grade option would use signal coordination; however, grade separation would require fewer restrictions on left turns. There would be no difference in development potential with either option. However, because of feedback from the public and local politicians, Mayor John Tory recommended more study on grade separation.
A fully at-grade extension was estimated to cost $1.5 to $2.1billion. Grade separation would add an extra $881.9million to $1.32billion to that cost.
Grade-separated station plan (2019–present)
In April 2019, Ontario premier
Doug Ford
Douglas Robert Ford Jr. (born November 20, 1964) is a Canadian politician and businessman who has served as the 26th and current premier of Ontario since June 2018 and leader of the Progressive Conservative (PC) Party since March 2018. He ...
, the brother of former Toronto mayor Rob Ford, announced a plan for transit in the Greater Toronto Area. This included the planned extension of Line 5 Eglinton west to Pearson Airport with a section of the line built underground from Royal York to Martin Grove. In February 2020, Metrolinx released an initial business case analysis of the project with four options, including three which were below-grade.
Metrolinx ultimately decided on a mostly grade-separated line with 7 stations (4 underground, 2 elevated, 1 at ground level).
Building a mostly grade-separated extension is expected to cost $4.7billion and would have 7 stations and an estimated 37,000 daily boardings. For comparison, a surface line would have cost $2.9billion and have had 10 ground-level stations and an estimated 42,500 daily boardings. Travel time savings on an underground line would be double that for a surface line, but the reduction in stations would lead to a lower estimated ridership, though local bus service would be retained.
During the
2018 Ontario Provincial Election, the Liberal and Progressive Conservative candidates
Yvan Baker
Yvan Baker (born December 8, 1977) is a Canadians, Canadian politician who was elected to represent the federal Electoral district (Canada), riding of Etobicoke Centre (electoral district), Etobicoke Centre in the 2019 Canadian federal election, ...
and
Kinga Surma
Kinga Surma (born ca. 1987/1988 in Polandhttps://www.youtube.com/watch?v=InLFRG5b8aw&t=373s "Kinga Surma Christmas PCParty"
YouTube video uploaded by GoniecTV Toronto, Surma reveals she was born in Poland, moved to Canada when she was 4, which wa ...
supported the underground option. Of the three major parties, only the NDP candidate Erica Kelly supported the less expensive, higher ridership option. Doug Ford preferred underground construction.
Extension description
The extension will run from
Weston Road
Weston Road is a north–south street in the west end of Toronto and western York Region in Ontario, Canada. The road is named for the former Village of Weston, which was located near Weston Road and Lawrence Avenue West.
Route description
In ...
to Renforth Drive, just beyond the city limits in Mississauga, serving seven new stations.
West of Mount Dennis, the line would emerge from a tunnel and become elevated for stops at
Jane Street
Jane may refer to:
* Jane (given name), a feminine given name
* Jane (surname), related to the given name
Film and television
* ''Jane'' (1915 film), a silent comedy film directed by Frank Lloyd
* ''Jane'' (2016 film), a South Korean drama fil ...
and
Scarlett Road
Scarlett is the female name that has originated from the colour scarlet. It may refer to:
People
* Scarlett (given name), a feminine name
* Scarlett (surname)
* Scarlett (gamer) (Sasha Hostyn), professional video game player
Fictional charact ...
and in order to cross the Humber River. It would travel underground between
Royal York Road
Royal York Road, historically known as Church Street or New Church Street, is a north-south arterial road in Toronto, Ontario, Canada. It is a concession road, 5 concessions (10 km) west of Yonge Street, and runs through many residential ne ...
and
Martin Grove Road Martin may refer to:
Places
* Martin City (disambiguation)
* Martin County (disambiguation)
* Martin Township (disambiguation)
Antarctica
* Martin Peninsula, Marie Byrd Land
* Port Martin, Adelie Land
* Point Martin, South Orkney Islands
Austral ...
. The line would then come to the surface for a stop at Renforth station.
For turning back trains, there will be crossovers on the west side of Jane station and on the east side of Renforth station. When the line is extended further west to the airport, there will be an additional crossover on the west side of Renforth station. Both Jane and Renforth stations will have pocket tracks.
The delivery strategy from Metrolinx and Infrastructure Ontario includes 5 separate contracts: a first advance tunnel between Renforth Drive and Scarlett Road; a second advance tunnel between Jane Street and Mount Dennis Station; an elevated guideway between Scarlett Road and Jane Street; stations, rail and systems for the entire LRT; and the airport segment.
Advance tunnel 1 – Renforth to Scarlett
In May 2021, the consortium West End Connectors was awarded the contract to design, build and finance the tunnels for the extension, permitting the consortium to set up the tunnel launch site at Renforth Drive and Commerce Boulevard. West End Connectors is a consortium of companies that includes Aecon Infrastructure Management, Dragados Canada, Ghella Canada, TYPSA, EXP Services, Dr. G. Sauer & Partners, Pedelta Canada, ACS Infrastructure Canada, Aecon Concessions, Scotiabank Capital and Ghella Investments & Partnerships.
There will be another tunnelled section starting a few hundred metres east of Jane Street, but this work will be part of a separate contract.
On April 11, 2022, tunnelling began from the launch shaft located adjacent to Renforth station; two tunnel-boring machines (TBM), dubbed Rexy and Renny, will tunnel eastwards to the west side of Scarlett Road, where the extraction shaft will be located. Each TBM weighs about , and are in diameter and in length. The tunnels will be underground. The underground stations will be built using the cut and cover method.
Renny started boring in April 2022 but Rexy started later, in early August, as the launch area was only big enough to launch one TBM at a time. The extraction shaft will be near the west side of Scarlett Road.
Elevated guideway – Scarlett to Jane
On December 2021, Metrolinx issued a pre-qualification request for a design–build contract on the elevated guideway from the portal west of Scarlett Road to the portal east of Jane Street. On April 27, 2022, Metrolinx announced that 3 bidders had been shortlisted to respond to a request for proposals:
Aecon
Aecon Group Inc. is a construction company in Canada, providing services to private and public sector clients across its three core segments of Infrastructure, Industrial, and Concessions.
Aecon produces construction materials including asphal ...
,
EllisDon
EllisDon is an employee-owned construction services company that was founded and incorporated in 1951 in London, Ontario, Canada, by brothers Don and David Ellis Smith. The company is headquartered in Mississauga, Ontario, Canada.
History
F ...
, and
Dragados
ACS, Actividades de Construcción y Servicios, S.A. () is a Spanish company dedicated to civil and engineering construction, all types services and telecommunications. It is one of the leading construction companies in the world, with projects i ...
& Amico.
Advance tunnel 2 – Jane to Mount Dennis
On December 2, 2021, Metrolinx and Infrastructure Ontario issued the request for qualification (RFQ) and shortlisted 2 bidders in the RFP release:
Strabag
STRABAG SE is an Austrian construction company based in Spittal an der Drau, Austria, with its headquarters in Vienna. It is the largest construction company in Austria and one of the largest construction companies in Europe. The company is acti ...
and
Acciona
Acciona, S.A. () is a Spanish multinational conglomerate dedicated to the development and management of infrastructure (construction, water, industrial and services) and renewable energy. The company, via subsidiary Acciona Energy, produces 21 te ...
& GFL Construction. The contract was expected to be awarded in the second quarter of 2023.
Stations, rails and systems
As of December 2022, an RFP had yet to be issued.
Airport segment
A later phase of the extension would run north along Commerce Boulevard to an elevated bridge which would carry the line over Highway 401. The line would become elevated again for a stop at Convair Drive, serving the GTAA headquarters and the aircraft and airfield maintenance areas, then at-grade for a stop at Silver Dart Drive, serving some car rental facilities. The rest of the route to Pearson had not been finalized as of 2020, but the line was intended to terminate at the proposed
Pearson Regional Transit Centre
The Pearson Regional Transit Centre also known as Union Station West is a proposed second intermodal transportation hub to serve the Greater Toronto Area. The transit hub will be located at the site of Viscount station currently serving the Link ...
located north of Pearson Airport Terminals 1 and 3.
Eglinton East LRT
The Eglinton East LRT (EELRT) is a proposed light-rail line extending from Kennedy station to
Malvern Town Centre
Malvern is a neighbourhood in the city of Toronto, Ontario, Canada, with a population of 44,315. It is located in the northeast corner of the city.
There are over 60 different cultures represented in Malvern, with the most dominant ethnic groups b ...
via Eglinton Avenue East, Kingston Road and Morningside Avenue. Unlike Line 5 Eglinton and the Eglinton West LRT, which are Metrolinx projects, the EELRT is a City of Toronto project. , the plan is that the EELRT be a separate line rather than an extension of Line 5: both the EELRT and Line 5 Eglinton would terminate at Kennedy station rather than operating as one continuous line.
, the estimated cost of the EELRT is $3.9billion with an expected opening in the early to mid-2030s.
A ten-percent design and a revised cost estimate are expected in the third quarter of 2023.
EELRT description
Kennedy station would be the western terminus of the EELRT, where there would be passenger connections to
Line 2 Bloor–Danforth
Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 a ...
, Line 5 Eglinton and GO Transit's
Stouffville line
The Stouffville line is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. Its southern terminus is Union Station in Toronto, and its northern terminus is (formerly "Lincolnville") in Whitchurch ...
. It would be located at grade and off street on the south side of Eglinton Avenue and on the east side of the Stouffville line.
From Kennedy station, the line would enter a reserved centre median on Eglinton Avenue between Town Haven Place and Midland Avenue. Running east on Eglinton Avenue East, the EELRT would pass
Eglinton GO Station
Eglinton GO Station is a train station that serves the Scarborough Village and Eglinton East neighbourhoods of Toronto, Ontario, Canada. It is a station on the Lakeshore East line of the GO Transit rail network. This station is one of few GO st ...
before turning northeast on Kingston Road and passing Guildwood GO Station. At Morningside Avenue, the line would turn north to Ellesmere Avenue where there would be connections to the planned
Durham–Scarborough bus rapid transit
Durham–Scarborough bus rapid transit (DSBRT) is a future bus rapid transit corridor proposed by Metrolinx for the eastern part of the Greater Toronto Area in Southern Ontario, Canada. The bus corridor will run from downtown Oshawa to Scarboro ...
corridor. At Ellesmere Avenue, the line would jog onto the
University of Toronto Scarborough
The University of Toronto Scarborough, also known as U of T Scarborough or UTSC, is one of the three campuses that make up the tri-campus system of the University of Toronto. Located in Scarborough, Toronto, Ontario, Canada, the campus is set upo ...
campus before returning to Morningside Avenue. The line would continue north to Sheppard Avenue East, then west on Sheppard Avenue to Malvern Road, then north to terminate at Malvern Town Centre. The plan also foresees a future branch of the line on Sheppard Avenue going west from Malvern Road to McCowan Road, where there would be a connection to the Scarborough Subway Extension (SSE) on
Line 2 Line 2 or 2 Line may refer to:
Public transport Americas
*2 (New York City Subway service), a rapid transit service in the A Division of the New York City Subway
*2 Line (Sound Transit), a light rail line in Seattle, Washington
*Line 2 Bloor–Dan ...
. There would also be a short branch on Sheppard Avenue from Morningside Avenue east to Conlins Road to provide access to a proposed maintenance and storage facility.
The EELRT would use trains long or less and operate approximately at a 5-minute frequency. The EELRT would use its own distinct vehicles (i.e. different from those used on Line 5 Eglinton) in order to better adapt to the line's conditions: no running in tunnels, shorter trains and platforms, and a better ability to climb grades to avoid expensive road infrastructure changes.
EELRT history
In 2016, to complement the
Scarborough Subway Extension Scarborough or Scarboro may refer to:
People
* Scarborough (surname)
* Earl of Scarbrough
Places Australia
* Scarborough, Western Australia, suburb of Perth
* Scarborough, New South Wales, suburb of Wollongong
* Scarborough, Queensland, s ...
(SSE), the planned
extension of Line 2 Bloor–Danforth to
Scarborough Town Centre
Scarborough Town Centre (STC) is a shopping mall in Toronto, Ontario, Canada. Central to the Scarborough City Centre in the former city of Scarborough, it is adjacent to Scarborough Centre station, the Scarborough Centre Bus Terminal and the CTV ...
, the City of Toronto drafted a plan to extend Line 5 Eglinton farther east into Scarborough to terminate at the
University of Toronto Scarborough
The University of Toronto Scarborough, also known as U of T Scarborough or UTSC, is one of the three campuses that make up the tri-campus system of the University of Toronto. Located in Scarborough, Toronto, Ontario, Canada, the campus is set upo ...
campus.
Originally, the extension was to be long to serve "neighbourhood improvement areas" (often low-income areas) such as
Eglinton East
Eglinton East, historically known as Knob Hill, is a residential and commercial neighbourhood in Toronto, Ontario, Canada. It is bounded by Stansbury Crescent, Citadel Drive, and West Highland Creek to the north, Midland Avenue to the west, the CN ...
,
Scarborough Junction
Scarborough Junction (also known as Kennedy Park) is a small neighbourhood in the Scarborough district of Toronto, Ontario, Canada. It is bordered by Birchmount Road, Brimley Road, Eglinton Avenue, and St. Clair Avenue.
Scarbrough Junction has ...
,
Morningside,
Scarborough Village
Scarborough Village is a neighbourhood in Toronto, Ontario, Canada, located in the Scarborough district. It was one of the earliest settlements in the former township of Scarborough with the distinction of being the site of the township's first ...
and
West Hill.
The extension would add 18 new stops east of Kennedy station and serve an estimated 43,400 additional riders per day (a ridership similar to that of the
Line 4 Sheppard
Line 4 Sheppard is the newest and shortest subway line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November 22, 2002, and has five stations along of track, which is built without any open sectio ...
subway).
The extension would follow the alignment of the Scarborough Malvern LRT, which was proposed as part of Transit City.
In 2010, the Scarborough Malvern LRT was cancelled by Mayor Rob Ford, despite having been approved by Toronto City Council and the
Government of Ontario
The government of Ontario (french: Gouvernement de l'Ontario) is the body responsible for the administration of the Canadian province of Ontario. A constitutional monarchy, the Crown—represented in the province by the lieutenant governor ...
in 2009.
In early 2016, the plan for the Scarborough Malvern LRT was revived and rebranded as "Crosstown East"
before being renamed again to "Eglinton East" in 2017.
, the project was mostly unfunded, with the cost estimated at $1.6billion to $1.7billion, with an estimated completion date of 2023.
At a November 2017 public meeting, city staff presented the possibility of extending the Eglinton East LRT by six stops to
Malvern Town Centre
Malvern is a neighbourhood in the city of Toronto, Ontario, Canada, with a population of 44,315. It is located in the northeast corner of the city.
There are over 60 different cultures represented in Malvern, with the most dominant ethnic groups b ...
. The Malvern extension would be long.
The extension to Malvern Town Centre would have seven stops: at Pan Am Drive, Sheppard/Morningside, Brenyon Way, Murison Boulevard, Sheppard/Neilson, Wickson Trail, and Malvern Town Centre.
In April 2019, Ontario premier Doug Ford announced a plan for Toronto rapid transit which included the Eglinton West LRT, the Scarborough Subway Extension, the Yonge North Extension and the
Ontario Line
The Ontario Line is an under-construction rapid transit line in Toronto, Ontario, Canada. Its northern terminus will be at Eglinton Avenue and Don Mills Road, at Science Centre station, where it will connect with Line 5 Eglinton. Its southern te ...
. The Eglinton East LRT was noticeably not included and was left off the accompanying map.
, the City of Toronto and the TTC were in the process of implementing bus-only lanes from Kennedy station to the University of Toronto Scarborough campus via Eglinton Avenue, Kingston Road and Morningside Avenue as part of the RapidTO bus rapid transit scheme, which approximates the route of the Eglinton East LRT. The lanes were anticipated to be fully installed and operational by that November. As well as "red carpet" bus lanes, bus stops were also consolidated to approximately the same configuration and frequency of proposed LRT stations, with certain lower-order curbside stopssuch as those at Huntington Avenue, Brimley Road, Oswego/Barbados Roads and Torrance Avenuebeing removed entirely.
In December 2020, the City of Toronto announced changes to the Eglinton East LRT proposal. The tunnel portal would be extended eastwards to Huntington Avenue due to changes in the Scarborough Subway Extension project, which involved modifying the depth of the tunnel as well as adding a third subway track for service improvements. A station at Midland Avenue was moved underground as a result. A new maintenance and storage facility north of the University of Toronto Scarborough was added to the plan as a result of the
Sheppard East LRT
The Sheppard East LRT was a proposed light rail line in Toronto, Ontario, Canada. It was first announced as part of the Transit City proposal in 2007. The Sheppard East LRT as proposed was to be long, travel along Sheppard Avenue from Don Mill ...
cancellation. Originally, both the Eglinton East LRT and the Sheppard East LRT were to have shared a maintenance and storage facility at Conlins Road east of Sheppard and Morningside. The other aspects of the project remained the same, including a tunnel under Kingston Road and Morningside Avenue due to traffic congestion at the Kingston/Lawrence and Morningside area.
The Government of Ontario announced funding for various public transit projects in 2019, but none of the announced funding was earmarked for the EELRT.
However, since the province had agreed to fully fund the
Scarborough Subway Extension Scarborough or Scarboro may refer to:
People
* Scarborough (surname)
* Earl of Scarbrough
Places Australia
* Scarborough, Western Australia, suburb of Perth
* Scarborough, New South Wales, suburb of Wollongong
* Scarborough, Queensland, s ...
, Mayor John Tory requested in 2021 that the $1.2billion the city had accumulated for that project be redirected to the Eglinton East line.
In 2020, Toronto City Council had approved the concept of the EELRT being an extension of the Metrolinx-owned Line 5 Eglinton.
However, by 2022, city planning staff concluded a through-service connection at Kennedy station was not feasible as an EELRT tunnel would be only above the SSE tunnel at Kennedy station, and the SSE tunnel structure would not be strong enough to safely support an EELRT tunnel above it.
Thus, city staff proposed a "distinct-service concept" for the EELRT. Doing so would result in lower construction costs, a shorter construction period, fewer private property impacts and design flexibility. With this flexibility, the EELRT would not need to conform to Line 5's technology, operations, and maintenance requirements. The city could choose another type of light-rail vehicle and would use the Conlins Yard as the line's maintenance and storage facility. Previously considered tunnels between Kennedy station and Midland Avenue and under Kingston Road would be replaced by surface alignments.
A July 2022 TTC report dubbed the standalone line as "Line 7 Eglinton East", thus assigning a TTC route number to the EELRT.
See also
*
Jane LRT
The Jane LRT is an inactive proposal for a light rail line in Toronto, Ontario, Canada. It was originally proposed in 2007, cancelled in 2010, and later revived in the 2013 "Feeling Congested?" report by the City of Toronto, where it was labelle ...
*
Light rail in Canada
Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.
Terminology
* "Commuter rail" refers to urban passenger train service between a ...
References
External links
Eglinton Crosstown official project website for the line east of Mt. Dennis
Eglinton Crosstown West Extension official project website for the extension west of Mt. Dennis
Toronto Light Rail Transit projects (Metrolinx)*
{{Portal bar, Ontario, Transport
5
Metrolinx
Light rail in Canada
Transit City
Proposed public transport in the Greater Toronto Area
The Big Move projects
750 V DC railway electrification
Public–private partnership projects in Canada
Tram and light rail transit systems under construction
Buildings and structures under construction in Canada
2023 in rail transport
Rapid transit lines in Canada
Standard gauge railways in Canada