HOME

TheInfoList



OR:

The Downtown Tunnel on Interstate 264 (I-264) and U.S. Route 460 Alternate (US 460 Alt.) crosses the Southern Branch of the Elizabeth River in the
South Hampton Roads South Hampton Roads is a region located in the extreme southeastern portion of Virginia's Tidewater region in the United States with a total population of 1,191,937. It is part of the Virginia Beach-Norfolk-Newport News, VA-NC MSA (Metropolitan S ...
area of Virginia, US. It links the independent
City of Portsmouth Portsmouth ( ) is a port and city in the ceremonial county of Hampshire in southern England. The city of Portsmouth has been a unitary authority since 1 April 1997 and is administered by Portsmouth City Council. Portsmouth is the most ...
with the independent City of Norfolk. In conjunction with the Berkley Bridge, the Downtown Tunnel connects to Interstate 464 to the City of Chesapeake and a continuation I-264 to the downtown and Waterside areas of Norfolk, and on to
Virginia Beach Virginia Beach is an independent city located on the southeastern coast of the Commonwealth of Virginia in the United States. The population was 459,470 at the 2020 census. Although mostly suburban in character, it is the most populous ci ...
. Owned by the
Virginia Department of Transportation The Virginia Department of Transportation (VDOT) is the agency of the state government responsible for transportation in the state of Virginia in the United States. VDOT is headquartered at the Virginia Department of Highways Building in downtow ...
(VDOT), it is operated and maintained by Elizabeth River Crossings under a 58-year
public–private partnership A public–private partnership (PPP, 3P, or P3) is a long-term arrangement between a government and private sector institutions.Hodge, G. A and Greve, C. (2007), Public–Private Partnerships: An International Performance Review, Public Adminis ...
concession agreement. Formerly a toll-free facility,
open road tolling Open road tolling (ORT), also called all-electronic tolling, cashless tolling, or free-flow tolling, is the collection of tolls on toll roads without the use of toll booths. An electronic toll collection system is usually used instead. The ma ...
was implemented on February 1, 2014 by VDOT to help finance repairs and expansion to the tunnel.


History

In the mid-1940s, Virginia legislators wanted to replace the aging vehicle ferry system that transported its motorists over the waterways in the state. Authorized by a revenue bond act passed earlier by the General Assembly, the commission decided during the 1946-47 fiscal year to construct toll bridges to replace ferry crossings on the York River at Yorktown and the
Rappahannock River The Rappahannock River is a river in eastern Virginia, in the United States, approximately in length.U.S. Geological Survey. National Hydrography Dataset high-resolution flowline dataThe National Map accessed April 1, 2011 It traverses the entir ...
at rey’s Pointand to acquire from private owners the ferries that carried vehicles across Hampton Roads between the Norfolk and Lower Peninsula areas. Shortly thereafter in 1952, VDOT opened a two-lane tunnel (then named the Norfolk-Portsmouth Bridge-Tunnel). It was the first fixed crossing directly between Portsmouth and Norfolk across the Elizabeth River, predating the Hampton Roads Bridge Tunnel by five years. It was financed and built by the Elizabeth River Tunnel Commission with toll revenue bonds and was completed in 1952. Tolls at the time were 25 cents. In 1988 and 1989, during an expansion of I-264, the Downtown Tunnel was expanded to two tunnels (one two-lane tunnel in each direction), and the nearby Berkley Bridge was rebuilt and expanded to eight lanes, connecting I-264 to I-464, just short of (and above) the tunnel entrance. Tolls were also removed at that time. Between 2019 and 2022 there have been increased occurrences of fake toll violations to drivers. Many of the drivers who received these notices have never crossed the river, or even, been to the state of Virginia. EZ-Pass has been criticized for failing to address the fraudulent toll violations.


Public-Private Partnership and 2013 Rehabilitation

In 2004, VDOT sent out an informal request for information to private entities to gauge interest in pursuing a public-private partnership to help build the parallel Midtown Tunnel and extend the MLK Freeway to I-264. At the time, the project did not include any work at the Downtown Tunnel. Of the three companies that responded, two of the companies, one being the company that ultimately bid on the current project (
Skanska Skanska AB () is a multinational construction and development company based in Sweden. Skanska is the fifth-largest construction company in the world according to ''Construction Global'' magazine. Notable Skanska projects include renovation of t ...
), referred to a study funded earlier in the year noting that the only possible way of making the project financially feasible was to toll the Downtown Tunnel as well as the Midtown Tunnel for construction costs. VDOT then began soliciting bids from private companies to partner with the state in executing the Elizabeth River Tunnels Project, which now included the rehabilitation of the Downtown Tunnel) through Virginia's Public Private Transportation Act. Elizabeth River Crossings, the company formed by interested party Skanska with additional capital by
Australia Australia, officially the Commonwealth of Australia, is a sovereign country comprising the mainland of the Australian continent, the island of Tasmania, and numerous smaller islands. With an area of , Australia is the largest country by ...
n investment company
Macquarie Group Macquarie Group Limited () is an Australian global financial services group. Headquartered and listed in Australia (), Macquarie employs more than 17,000 staff in 33 markets, is the world's largest infrastructure asset manager and Australia' ...
, submitted their proposal to VDOT. After the lengthy review process required under the PPTA, then-Governor
Bob McDonnell Robert Francis McDonnell (born June 15, 1954) is an American attorney, businessman, politician, and former military officer who served as the 71st governor of Virginia from 2010 to 2014. His career ended after his corruption scandal and convi ...
and VDOT executed the Comprehensive Agreement with ERC on December 5, 2011. 516] Under the agreement, VDOT retains ownership and oversight of the tunnels, while ERC finances, builds, operates and maintains the facilities for a 58-year concession period. Under the agreement, the work on the Downtown Tunnel consisted of different items based on NFPA 502 standards, work which includes: * Removing the suspended ceiling of the eastbound tunnel (the westbound tunnel suspended celling was removed in 2011 due to safety concerns) * Removing old lighting and replacing with energy-efficient LED lighting * Installing a new longitudinal ventilation system with eight sets of jet fans (16 total each tunnel), * Removing police booths and other cosmetic level rehab work. Work on the westbound tunnel began on August 9, 2013. Rehabilitation work on the eastbound tunnel began on July 25, 2014. The completion date of the Downtown Tunnel rehabilitation work was November 3, 2016.


References

{{Coord, 36, 49, 58.5, N, 76, 17, 37, W, display=title Road tunnels in Virginia Toll tunnels in Virginia Tolled sections of Interstate Highways Intracoastal Waterway Transportation in Norfolk, Virginia Transportation in Portsmouth, Virginia Tunnels completed in 1952 Immersed tube tunnels in the United States