The Delhi BRTS was a
bus rapid transit system in
Delhi
Delhi, officially the National Capital Territory (NCT) of Delhi, is a city and a union territory of India containing New Delhi, the capital of India. Straddling the Yamuna river, primarily its western or right bank, Delhi shares borders ...
. The first route opened in 2008 ahead of the
2010 Commonwealth Games
The 2010 Commonwealth Games (Hindi: 2010 राष्ट्रमण्डल खेल), officially known as the XIX Commonwealth Games and commonly known as Delhi 2010, was an international multi-sport event that was held in Delhi, India, ...
, which were held in the city. The project was well used but has been criticised for the difficulty of access to the bus platforms, which are in the middle of the road, for lack of enforcement and for the effect it has had on other motor traffic. A legal challenge was defeated in 2012. The
Aam Aadmi Party Government had announced the scrapping of bus rapid transit system
and it was dismantled in 2016, because of traffic congestion and accidents.
History
Context
The number of vehicles on Delhi's road increased from 3.3 million in 2000–01 to 7 million in 2010–11; however, less than 10% people in Delhi use private cars, with 33% traveling by bus and 30% walking to work. The length of roads in Delhi has increased by 17% between 1991 and 2008, with now
flyovers and underpasses have been built to improve traffic flow; the Ring Road has been made completely signal-free with the construction of 15 flyovers. The
Delhi Metro
The Delhi Metro is a mass rapid transit (MRT) system serving Delhi and its satellite cities of Ghaziabad, Faridabad, Gurgaon, Noida, Bahadurgarh and Ballabhgarh, in the National Capital Region of India. The network consists of 10 colou ...
opened its first section in 2002 and now carries 2.06 million passengers each day (as of 2011).
Pedestrians became marginalised and journey times and
air pollution
Air pollution is the contamination of air due to the presence of substances in the atmosphere that are harmful to the health of humans and other living beings, or cause damage to the climate or to materials. There are many different typ ...
both increased. In 2002, Supreme Court issued an order to convert all diesel buses to
compressed natural gas
Compressed natural gas (CNG) is a fuel gas mainly composed of methane (CH4), compressed to less than 1% of the volume it occupies at standard atmospheric pressure. It is stored and distributed in hard containers at a pressure of , usually in cy ...
(CNG) to reduce
air pollution
Air pollution is the contamination of air due to the presence of substances in the atmosphere that are harmful to the health of humans and other living beings, or cause damage to the climate or to materials. There are many different typ ...
; however, average total suspended particulate (TSP) level is still considerably higher than
World Health Organization
The World Health Organization (WHO) is a specialized agency of the United Nations responsible for international public health. The WHO Constitution states its main objective as "the attainment by all peoples of the highest possible level of ...
’s (WHO) recommendations. There is little opportunity to build new roads or widen existing roads, which already make up 21% of the land area.
Planning and construction
The Delhi BRT system was inspired by a
similar systems in
Curitiba
Curitiba () is the capital and largest city in the state of Paraná in Brazil. The city's population was 1,948,626 , making it the eighth most populous city in Brazil and the largest in Brazil's South Region. The Curitiba Metropolitan area ...
, Brazil which had been introduced a system in 1975, with similar systems being introduced in
Bogotá, Colombia (
TransMilenio
TransMilenio is a bus rapid transit (BRT) system that serves Bogotá, the capital of Colombia, and Soacha. The system opened to the public in December 2000, covering Caracas Avenue and 80 street. Other lines were added gradually over the next s ...
),
Guayaquil
, motto = Por Guayaquil Independiente en, For Independent Guayaquil
, image_map =
, map_caption =
, pushpin_map = Ecuador#South America
, pushpin_re ...
, Ecuador (
Metrovia) and the
Eugene, Oregon (
Emerald Express (EmX)
The Emerald Express (EmX) is a bus rapid transit (BRT) system in the Eugene- Springfield metropolitan area in Oregon, United States. It is provided by the Lane Transit District (LTD) which is the public transit authority in Lane County, Oregon.
...
). GNCTD appointed RITES and the Indian Institute of Technology Delhi (IIT Delhi) to design and implement a system for the city in 2004. TRIPP IIT Delhi were appointed as technical and conceptual advisors. GNCTD create the Delhi Integrated Multi-Modal Transit System (DIMTS) in 2006 to oversee the establishment of public transport systems in Delhi and operate it on a day-to-day basis. A trial run took place on 21 April 2008.
[http://www.expressindia.com/latest-news/brt-corridor-to-be-opened-to-public-on-may-1/297272/ BRT corridor to be opened to public on 1 May]
Operation
The first route, from Dr. Ambedkar Nagar to the south to Delhi Gate in the centre of the city, passed through some of the prime 'colonies' (urban districts) in South Delhi and was also on the main road from Delhi to the large commercial developments in Gurgaon. A trial section of the first route started in operation 20 April 2008 from Dr. Ambedkar Nagar to Moolchand. Construction work for the full length started in October 2008.
Legal challenge and 'mixed-use'
The city delayed implementation of a further 14 fast-track bus corridors in response to the level of controversy created by the first scheme.
[
The legality of the system was challenged in 2012. During the nine-month-long legal challenge the ]Delhi High Court
The High Court of Delhi ( IAST: ''dillī uchcha nyāyālaya'') was established on 31 October 1966, through the ''Delhi High Court Act, 1966'', with four judges, Chief Justice K. S. Hegde, Justice I. D. Dua, Justice H. R. Khanna and Justice S ...
initially ruled that private vehicles should be allowed the use of the bus lanes on a temporarily basis and ordered the government to review the feasibility of the project.[ The Delhi government appealed to the Supreme Court of India against the ruling in July 2012, but was unsuccessful.] The high court subsequently ruled in favour of the scheme concluding that "a developed country is not one where the poor own cars. It is one where the rich use public transport".
Closure
After 8 years of operation, the system was dismantled in 2016 due to its poor implementation.
Design and operation
The 14.5 km long corridor from Ambedkar Nagar to Delhi Gate ran along a right of way
Right of way is the legal right, established by grant from a landowner or long usage (i.e. by prescription), to pass along a specific route through property belonging to another.
A similar ''right of access'' also exists on land held by a gov ...
which varying from 28 meters to 51.5 meters wide. Buses used a bus lane is in the middle of the road which is 3.3 meters wide with general purpose motor vehicle lanes with a width of 6.75 meters to each side. Separate lanes were also provided for non-motorised vehicles, including pedestrians, cycles and rickshaws etc. Buses ran at the same level as normal traffic and share the same traffic signals.
Bus passengers needed to access the bus platforms in the middle of the road by crossing the busy general purpose traffic lanes. Electronic Passenger information system
A passenger information system, or passenger information display system, is an automated system for supplying users of public transport with information about the nature and the state of a public transport service through visual, voice or other m ...
displays were available in all bus shelters with the new low-floor
Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" (i. ...
buses on four routes – 419, 423, 521 and 522 being fitted with GPS tracking
A GPS tracking unit, geotracking unit, satellite tracking unit, or simply tracker is a navigation device normally on a vehicle, asset, person or animal that uses satellite navigation to determine its movement and determine its WGS84 UTM g ...
.
The first route crossed 6 key intersections, including Chirag Delhi, which is one of the busiest in Delhi and also the congested Moolchand intersection. More than 1.35 million vehicles of all types cross the junction in a typical 16-hour day. Approximately 200-250 buses which cross the junction each peak hour carry some 11,000-12,000 passengers (which is 55-60% of the total people movements). A further some 15-20% of people use private vehicles including cars, two wheelers and auto rickshaws and make up 90% of the traffic. Cars/Jeeps constitute around 35-40% of total motorised vehicles.
180 road marshals were deployed on the corridor to guide bus passengers, help children and old people to cross the road, manage traffic, instruct people to follow traffic rules and perform other corridor management activities. The company employed security guards at the bus platforms on a 24-hour basis.
The Operational Control Centre (OCC) at Kashmere Gate and a camp office at DTC Khan Pur Depot monitored the daily progress. A crane was available to remove disabled vehicles from the corridor. On average there were 3 vehicle break downs on the corridor each day. Disabled vehicles including buses were typically removed in about 10 minutes.
Usage and performance
More than 60% of commuters used BRT Corridor mainly for work. Most of the respondents showed their discontent with the previous public transportation system. Respondents preferred to use their private vehicles due to inflexibility and unreliability of the bus system (according to a DIMTS commissioned socio-economic survey at BRT Corridor ). More than 50% of respondents desired ''timeliness of bus service'', ''clean bus and well behaved staff'' and ''certainty of bus service''. 85% of the respondents, who were currently not using public transport system, showed their willingness to use new BRT system if it is good. In 2012, it was reported that 70% of users were moving faster and there has been a 32% increase in bus ridership.
Criticism
Lack of enforcement
While the system was under operation, frustrated vehicle owners chose to violate rules with impunity by using the bus lane, defeating the very purpose of BRT. With negligible prosecution, the entire concept of a BRT falls flat. "''BRT as a concept is good, but the success of the corridor depends on how it is implemented. In its present form, it is congested and a large number of violations occur on the stretch that are not punished. This compromises the sanctity of the corridor. People have to be prosecuted on the spot to discourage violations. We have received complaints of pile-ups on the non-BRT lane and the long signal cycle adds to the delay in smooth crossover on the stretch,''" says joint commissioner of police (traffic) Satyendra Garg.
Difficulty accessing bus platforms
Along with private car owners, bus users also complained about bad planning. Despite the claims of DIMTS, the agency in-charge of the stretch, bus users say they are forced to scamper across the stretch to cross between the bus stands and the pavement. Without proper underpasses from the central median, where passengers get down or board the bus, a passenger does not know how to reach the bus stop as it's in the middle of the road. Not only are there no proper pedestrian crossings for road users on the BRT, the maintenance of the stretch is so poor that most of the safety markers, like bollards and speedbreakers, are broken and in a state of severe disrepair.
Explains KK Kapila, Chairman of International Road Federation (IRF), a Geneva-based global body for road safety: "''At present the buses run in the middle of the road with cars and motorised traffic on narrow left lanes. Since the bus stands are in middle of the road, the scurrying passengers have to board or get off the bus in the middle of the road and have to scuttle to safety towards pavements through the regular traffic lane. This is not the full-scale BRT system followed abroad.''"
Longer traffic signal cycle times
At regular traffic intersections, commuters have to wait for transit of traffic along the three other arms of the intersection before getting a green signal. On BRT, the signal cycle was far more convoluted and, as a result, much longer.
"''As opposed to normal traffic intersections, there are six different movements of vehicles along the arms of the intersection. The two extra movements are that of the buses on the BRT lane, which means that all commuters using the BRT or even passing through have to wait much longer. As the waiting time increases, the traffic tail lengthens much more than it normally would and there is a corresponding ripple effect on traffic,''" points out a senior traffic police officer.
This means that commuters have been unable to cross the intersection in one signal cycle. "It takes me at least three green lights to cross each signal of the BRT. Even during non-peak hours, I am stuck in a never-ending jam. Sometimes, I feel like banging my car in frustration. I can walk faster in this corridor," says a much hassled Ratika Dang, an interior designer.
The BRT had created further choke points creating almost half km long backups since 2008.
Future
After the system was dismantled, there have been plans to implement a new BRT in east Delhi along with five other corridors across the city.
See also
*Delhi Monorail
Delhi has significant reliance on its transport infrastructure. The city has developed a highly efficient public transport system with the introduction of the Delhi Metro, which is undergoing a rapid modernization and expansion since 2006. T ...
* Delhi Light Rail Transit
* Indore BRTS
*List of bus rapid transit systems
This is a list of bus rapid transit (BRT) systems which are in operation or under construction. The term "BRT" has been applied to a wide range of bus services. In 2012, the Institute for Transportation and Development Policy (ITDP) published ...
* Ahmedabad BRTS
*Jaipur BRTS
Jaipur BRTS is a bus rapid transit system, proposed to solve the traffic problem in the city of Jaipur.
In recent Rajasthan State elections, INC came into power and announced to remove Jaipur BRTS Corridors because of the accidents happening due ...
* Rainbow BRTS
References
Sources
DIMTS-Bus rapid transit
Private vehicles may ply on BRT bus lanes
Road rage: Rogue bikers beat up judge, driver on Bus Rapid Transit corridor
Supreme Court rejects govt’s plea on BRT
Petitioner demolishes dividers on the bus rapid transit corridor
Traffic jams back on BRT
The Big, Bad BRT
Shorn of its halo, BRT works better for cars