The Dehani lift irrigation scheme is a technologically sophisticated project to
irrigate Irrigation (also referred to as watering) is the practice of applying controlled amounts of water to land to help grow crops, landscape plants, and lawns. Irrigation has been a key aspect of agriculture for over 5,000 years and has been devel ...
Vidarbha Vidarbha (Pronunciation: id̪əɾbʱə is a geographical region in the east of the Indian state of Maharashtra and a proposed state of central India, comprising the state's Amravati and Nagpur divisions. Amravati Division's former name is Ber ...
, a large,
semi-arid A semi-arid climate, semi-desert climate, or steppe climate is a dry climate sub-type. It is located on regions that receive precipitation below potential evapotranspiration, but not as low as a desert climate. There are different kinds of semi- ...
region of
India India, officially the Republic of India (Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the so ...
.


Background

Vidharba is a semi-arid region that has an ailing agricultural community which has huge amounts of debts. This has led to a high farm suicide rate. The Prime Minister has proposed a centrally funded package to irrigate nearly and therefore provide economic relief.


Details

The project is being executed by Vidarbha Irrigation Development Corporation and IVRCL Infrastructures and Projects Limited. The region to be irrigated is in Dehani, Babhulgaon
taluk A tehsil (, also known as tahsil, taluka, or taluk) is a local unit of administrative division in some countries of South Asia. It is a subdistrict of the area within a district including the designated populated place that serves as its administr ...
,
Yavatmal district Yavatmal district , əʋət̪maːɭformerly known as Yeotmal, is a district of the Indian state of Maharashtra. It is located in the region of Vidarbha, in the east-central part of the state. It is Vidarbha's third-largest district by popula ...
, over the river Bembla at Khadasawanga. The project costed INR 1,988,300,000 (1.988 billion) and was completed in 2011. This project was the first of its kind in India and envisions the drip irrigation of a large area, while making use of the latest in communication technology. The Supervisory Control and Data Acquisition System (SCADA) will interconnect all components of the system via a satellite uplink, making it possible for the central command centre of the irrigation scheme to be able to control all components remotely.


Components


Bembla reservoir

The Bembla dam built over the river Bembla at Khadaksawanga is long and high, with a capacity of . The Bembla project currently has a command area of , and the completed project will have a command area of . The total project cost is expected to be INR 12.8 billion.


Approach channel

A approach channel carries water from the Bembla reservoir into the Forebay Stage-1. The channel is of trapezoidal cross-section.


Forebay Stage-1

The forebay is long and has an average depth of . This structure functions as a storage space for water before it is pumped farther ahead.


Pumphouse Stage-1

This pumphouse is attached to the Forebay Stage-1 and has vertical turbine pumps with an installed capacity of . Water is pumped from a reduced level of to the Main Distribution Chamber Stage-1 up to an elevation of via the Rising Mains Stage-1, which consist of one row of steel pipe and one row of steel pipe.


Main Distribution Chamber (MDC) Stage-1

From MDC Stage-1, part of the water enters the forebay of Pumphouse Stage-2, which has an installed vertical turbine pump capacity of . The remainder of the water is supplied to 34 Sub Distribution Chambers via pre-stressed concrete pipes which form part of the Gravity Mains.


Sub Distribution Chamber (SDC)

Each SDC is a circular underground tank with a capacity of . The average depth of each SDC below the ground level is . Each will service an area of . Each SDC, along with its associated instrument panel room and transformer, has been allocated a area. Each SDC has a pump installed. A trained operator will be employed in each instrument panel room to make the relevant data entries regarding the type of crops on the sub-zones being serviced by that particular SDC. The programme distributes the exact amount of water required in each sub-zone and cuts off the flow when the requirement has been fulfilled. The entire project has been divided into two stages, the first stage consists of 34 SDCs and the second stage consists of 23 SDCs. In all there will be 57 SDCs servicing the 57 zones that are subdivisions of the command area. Each zone is to be divided into 27 sub-zones. The SCADA system to be implemented is capable of delivering the exact amount of water required at each field according to the cropping pattern. It is proposed to train three representatives of the farming community from each zone, so that they will be able to operate the instrument panel of each SDC. For the initial three years of functioning, the IVRCL personnel will run the entire project, after which the responsibility of the day-to-day activities at the SDC will be handed over to the representatives of the farming community.


Forebay Stage-2

Part of the water stored in the MDC Stage-1 is supplied into this forebay. From here vertical turbine pumps (installed in the Pumphouse Stage-2) are used to pump the water farther ahead into the second stage of the project serviced by MDC Stage-2, which will supply 23 more SDCs.


References