Clair Oilfield
   HOME

TheInfoList



OR:

The Clair oilfield is an offshore oil field in Scottish
territorial waters The term territorial waters is sometimes used informally to refer to any area of water over which a sovereign state has jurisdiction, including internal waters, the territorial sea, the contiguous zone, the exclusive economic zone, and potenti ...
west of
Shetland Shetland, also called the Shetland Islands and formerly Zetland, is a subarctic archipelago in Scotland lying between Orkney, the Faroe Islands and Norway. It is the northernmost region of the United Kingdom. The islands lie about to the no ...
in water depths of up to . The field is the largest oilfield on the UK Continental Shelf with an estimated 8 billion barrels of oil-in-place, according to the BP Plc’s website. It extends over an area of some , covering five licence blocks. The five license blocks were 206/7, 206/8, 206/9, 206/12 and 206/15.


History

The Clair reservoir was discovered in 1977, with exploration well #206/8-1a penetrating a oil column in a thick sequence of
Devonian The Devonian ( ) is a geologic period and system of the Paleozoic era, spanning 60.3 million years from the end of the Silurian, million years ago (Mya), to the beginning of the Carboniferous, Mya. It is named after Devon, England, whe ...
to
Carboniferous The Carboniferous ( ) is a geologic period and system of the Paleozoic that spans 60 million years from the end of the Devonian Period million years ago ( Mya), to the beginning of the Permian Period, million years ago. The name ''Carbonifero ...
continental
sandstone Sandstone is a clastic sedimentary rock composed mainly of sand-sized (0.0625 to 2 mm) silicate grains. Sandstones comprise about 20–25% of all sedimentary rocks. Most sandstone is composed of quartz or feldspar (both silicates) ...
. In the 1980s ten appraisal wells were drilled. This activity demonstrated that the structure extended to an area of some with static oil-in-place, although it failed to confirm the presence of economically recoverable reserves. Two further wells were drilled in 1991, two in 1992 and one in 1995. Two of these wells (206/8-8 and 206/8-9z) demonstrated the potential for commercial flow rates but were not produced for long enough to give confidence in long term reservoir deliverability. In 1996 there was a breakthrough in the drilling and extended well testing (EWT) of well #206/8-10z. The EWT was followed by the side-tracking of an offset well into the pressure sink created by the EWT. The 1996
well test A well test is conducted to evaluate the amount of water that can be pumped from a particular water well. More specifically, a well test will allow prediction of the maximum rate at which water can be pumped from a well, and the distance that the ...
results set the scope for the 1997 drilling programme and triggered interest in a first phase of development. Two further wells were drilled in 1997 to appraise the 'Graben' and '3A' segments to reduce uncertainty in these areas adjacent to the core area. In May 1997 it was agreed by the Clair partners to jointly develop the field. BP was appointed as the operator and programme coordinator. A development plan was approved in 2001, representing an investment of £650m by BP and its four partners in the project – ConocoPhilips, Chevron, Enterprise, and Amerada Hess. The production facilities were installed in 2004. The first stage of the development was inaugurated on 23 February 2005.


Development

The first phase of development targets the 'Core', 'Graben' and 'Horst' segments of the southern area of the reservoir, which have , of which can be recovered. The development plan includes drilling of 15 producing wells, eight water injectors and one drill cuttings re-injection well. Plateau production is expected to be of oil and of gas.
Noble Corporation Noble Corporation plc is an offshore drilling contractor organized in London, United Kingdom. Its affiliate, Noble Corporation, is organized in the Cayman Islands. It is the corporate successor of Noble Drilling Corporation. The company operate ...
and Wood subsidiary Mustang Engineering, part of the
Wood Group John Wood Group plc, commonly known as Wood, is a British multinational engineering and consulting business with headquarters in Aberdeen, Scotland. It is listed on the London Stock Exchange as well as being a constituent of the FTSE 250 Index. ...
, won the contract for
Front-end loading Front-end loading (FEL), also referred to as pre-project planning (PPP), front-end engineering design (FEED), feasibility analysis, conceptual planning, programming/schematic design and early project planning, is the process for conceptual developme ...
. They proposed a single steel jacket with an integrated topsides deck with processing facilities, accommodation and a separate modular drilling rig. The steel jacket for Clair is located over the existing 206/8-10z well. The jacket is a four-legged single steel structure with a height of approximately . At its base, the jacket measures , has a height of , and a total weight of 8,800 tons. Both jacket and topsides are designed for fabrication, transportation and installation as single fully integrated lifts (maximum 10,500t) that require access to the heaviest lift capability vessels on the installation market. BP awarded the contract for the fabrication of the platform jacket to
Aker Verdal Aker Verdal AS formerly known as Aker Kværner Verdal is a construction yard for large steel constructions and substructures for offshore oil platforms. The yard is owned by Kvaerner and is located in Verdal in Nord-Trøndelag, Norway. T ...
. The contract for the construction of the platform topsides was awarded to
AMEC Amec Foster Wheeler plc was a British multinational consultancy, engineering and project management company headquartered in London, United Kingdom. In October 2017, it was acquired by Wood Group. It was focused on the Oil, Gas & Chemicals, M ...
. There are additional processing facilities for offshore
power generation Electricity generation is the process of generating electric power from sources of primary energy. For utilities in the electric power industry, it is the stage prior to its delivery ( transmission, distribution, etc.) to end users or its stor ...
, water injection, produced water and cuttings re-injection, surplus gas disposal (export or re-injection) and flare gas recovery.
Artificial lift Artificial lift refers to the use of artificial means to increase the flow of liquids, such as crude oil or water, from a production well. Generally this is achieved by the use of a mechanical device inside the well (known as pump or velocity strin ...
is provided for all producing wells with the option of Electric Submersible Pumps (ESPs) for future well intervention. The operations will feature simultaneous drilling and coil tubing well intervention operations (SIMOPS). The topsides deck (including the flare boom) weighs 10,700 tonnes. Well fluids are first treated in two parallel separation trains.Process Overview schematic, undated After heating the well fluids are separated into three phases (oil, gas and produced water) in the two parallel High Pressure (HP) Separators. Oil from the HP Separators is further heated and passes to the two parallel 3-phase Low Pressure (LP) Separators. Oil then flows to the two parallel Electrostatic Coalescers which further separates water from the oil streams. The oil is cooled and flows to the oil export pumps, then through the oil metering skid and to the oil export pipeline. Although there are two separation trains there is only one common gas compression train. Gas from the LP separators is compressed in the vapour recovery unit and mixed with the gas from the HP separators. The combined stream is compressed in the LP and then the MP (medium pressure) compressors. Gas is dehydrated by counter-current contact with glycol in the Glycol Contactor. The dry gas stream is used as fuel gas on the platform. The remaining gas is further compressed in the HP compressor, it is used as gas lift on the oil production wells or, after gas metering, is exported via the export pipeline. Produced water from the separation train is treated and flows to the water injection wellheads. The contract to build the accommodation modules was awarded to Leirvik Module Technology. The accommodation contract involves the fabrication of the living quarters and utility building which have a weight of 1000 tonnes. The contract for the drill rig fabrication contract was awarded to Heerema Hartlepool. The scope of the fabrication work incorporates fabrication of a Derrick Equipment Set (DES) module, with substructure and skid base and a Drilling Support Module (DSM). The work includes equipment installation and extended commissioning and the modules weigh approximately 2000t and 2400t respectively. The entire structure has a design life of 25 years. A further development phase, called 'Clair Ridge', aims to develop other areas of the field with further fixed platforms. The field contains an estimated 8 billion barrels of oil, with an estimated 120,000 barrels per day production at peak levels. The UK government approved the £4.5billion Clair Ridge development in October 2011 and production is scheduled to begin in 2016 and continue until 2050. The project involves the construction of a drilling & production platform bridge-linked to a living quarters & utilities platform, with pipelines to transport the oil and gas produced to
Sullom Voe Terminal The Sullom Voe Terminal is an oil and gas terminal at Sullom Voe in the Shetland Islands of Scotland. It handles production from oilfields in the North Sea and East Shetland Basin and stores oil before it is transported by tanker. Constructio ...
. BP and its partners awarded AMEC the contract for the engineering and project management for the main platform design, with
Kværner Kværner was a Norwegian engineering and construction services company that existed between 1853 and 2005. In 2004, it was amalgamated to the newly formed subsidiary of Aker ASA - Aker Kværner, which was renamed Aker Solutions on 3 April 2008 ...
constructing the platform jackets and
Hyundai Heavy Industries Hyundai Heavy Industries Co., Ltd. (HHI; ) is the world's largest shipbuilding company and a major heavy equipment manufacturer. Its headquarters are in Ulsan, South Korea. History HHI was founded in 1972 by Chung Ju-yung as a division of the ...
constructing the topsides.
Subsea 7 Subsea 7 S.A. is a Luxembourgish-domiciled subsea engineering, construction and services company serving the offshore energy industry. The company is registered in Luxembourg with its headquarters in London. History The company was formed by the ...
fabricated and installed the pipelines, Alphastrut designed and supplied a weight-saving aluminium raised access flooring and ceiling cable containment system, Gordon Engineering designed and manufactured the helicopter refuelling system and Bifab fabricated the flare boom. External blast walls, fire walls and blast rated HVAC ductwork system were designed and fabricated by MTE (Mech-Tool Engineering Limited) In June 2013, the Clair Ridge platform jackets left Kværner's Verdal Yard in Norway and they were successfully installed in August 2013. First oil was announced on 23 November 2018. In March 2013 BP announced that the partnership will begin a two-year appraisal program to explore a third phase of Clair field development.BP Press Release 28 March 2013
Greater Clair Appraisal Programme Approved
A contract was awarded to Aker Solutions in November 2018 for engineering services associated with this project which is now known as Clair South.


Partners

The Clair Partnership comprises four partners with the following fixed equity interests: * BP – 45.1% *
ConocoPhillips ConocoPhillips Company is an American multinational corporation engaged in hydrocarbon exploration and production. It is based in the Energy Corridor district of Houston, Texas. The company has operations in 15 countries and has production in ...
– 7.5% *
Chevron Corporation Chevron Corporation is an American multinational energy corporation. The second-largest direct descendant of Standard Oil, and originally known as the Standard Oil Company of California (shortened to Socal or CalSo), it is headquartered in S ...
– 19.4% *
Royal Dutch Shell Shell plc is a British multinational oil and gas company headquartered in London, England. Shell is a public limited company with a primary listing on the London Stock Exchange (LSE) and secondary listings on Euronext Amsterdam and the New Yo ...
– 28% (including 9.3% interest obtained from Hess in a swap in 2009) In July 2018, BP increased its stake to 45.1% by acquiring a 16.5% interest from ConocoPhillips.offshoreenergytoday.com 21 December 201
BP boosts Clair stake after closing ConocoPhillips deal
/ref>


References


See also

* Oil fields operated by BP {{BP 1977 establishments in Scotland 1977 in economics BP oil and gas fields Oil fields west of Shetland