HOME

TheInfoList



OR:

Changi Depot is located in
Changi Changi () is a planning area located in the geographical region of Tanah Merah in the East Region of Singapore. Sharing borders with Pasir Ris and Tampines to the west, Changi Bay to the southeast, the South China Sea to the east and the Seran ...
near Koh Sek Lim Road,
Singapore Singapore (), officially the Republic of Singapore, is a sovereign island country and city-state in maritime Southeast Asia. It lies about one degree of latitude () north of the equator, off the southern tip of the Malay Peninsula, bor ...
. Changi Depot comprises a train yard, which can hold a capacity of 46 trains and has an area of 250,000 square metres. The depot is also used for train inspection for trains on the East West line. The depot was completed in late 1980s when the East West line was completed. The depot is beside the
NEWater NEWater is the brand name given to highly treated reclaimed wastewater produced by Singapore's Public Utilities Board. NEWater is produced by further purifying conventionally treated wastewater through microfiltration, reverse osmosis and u ...
Visitor Centre and is near
Expo MRT station Expo MRT station is a Mass Rapid Transit (MRT) interchange station on the East West line (EWL) and Downtown line (DTL) in the Tampines planning area, Singapore. The station lies between Changi City Point and the Singapore Expo, located along ...
. The depot is located between
Expo An expo is a trade exposition. It may also refer to: Events and venues * World's fair, a large international public exposition * Singapore Expo, convention and exposition venue ** Expo Axis, one of the world's largest membrane roofs, constructe ...
station and Tanah Merah station on the East West line and has 2 reception tracks: 2 tracks westbound towards Tanah Merah station. The depot will be replaced by the
East Coast Integrated Depot The East Coast Integrated Depot ( Chinese: 东海岸综合车厂; Malay: Depot Bersepadu East Coast), is a future integrated bus and train depot located in Changi that will serve the East West Line, Downtown Line and Thomson-East Coast Line of ...
in 2025.


History

On 6 November 1983, the large part of the Changi Depot land was acquired for the MRT stabling yard. To construct the MRT depot, the Kampong Koh Sek Lim was cleared by December 1983, and residents had moved to Tampines and Bedok.


Incidents

On 18 May 2010, a
Kawasaki Heavy Industries C151 The Kawasaki Heavy Industries C151 is the first generation electric multiple unit (EMU) rolling stock in operation on the North South and East West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium led by Kawa ...
train carriage was deliberately vandalised in the depot. Elaborate
graffiti Graffiti (plural; singular ''graffiti'' or ''graffito'', the latter rarely used except in archeology) is art that is written, painted or drawn on a wall or other surface, usually without permission and within public view. Graffiti ranges from s ...
was drawn on the lower half of the carriage. A Swiss national, Oliver Fricker was charged with three charges of trespassing into the depot on the early hours of May 17 and vandalising the train by spraying paint and damaging public property by cutting a wired fence into property belonging to the Land Transport Authority. Another British national has also been named as being involved in the case. However, his whereabouts are unknown. SMRT apologised for the security lapse on 8 June 2010. It reviewed the security measures in all depots together with the authorities. All personnel of the security companies, employed by SMRT, have been instructed to step up vigilance. The number of security personnel and patrols at each depot has been increased. SMRT was fined S$50,000 for this incident.http://www.channelnewsasia.com/stories/singaporelocalnews/view/1160140/1/.html Oct 18, 2011. Retrieved 2011-10-18.


Upgrading

In August 2012, plans were announced to replace the existing Changi Depot, which will be demolished. A new depot, East Coast Integrated Depot, will be built beside the current site. The depot will house the rolling stock of the East West, Downtown and Thomson–East Coast lines. The facility is an underground (66 tracks for DTL), at-grade (62 tracks for TEL) and elevated depot (72 tracks for EWL) spread over three levels for each line. In August 2014, it was announced the completion date will be in 2025.


References

{{Singapore MRT stations, east-west=yes 1989 establishments in Singapore Mass Rapid Transit (Singapore) depots Tampines