A crash program is a plan of action entailing rapid, intensive
resource allocation In economics, resource allocation is the assignment of available resources to various uses. In the context of an entire economy, resources can be allocated by various means, such as markets, or planning. In project management, resource allocatio ...
to solve a pressing problem. Rapidity may eliminate investigation and planning essential to efficient use of resources when goals are perceived as more important than those resources.


Deadlines

Time limit A time limit or deadline is a narrow field of time, or a particular point in time, by which an objective or task must be accomplished. Once that time has passed, the item may be considered overdue (e.g., for work projects or school assignments). In ...
s differentiate crash programs from normal procedures. Time reduction often results from unexpected circumstances. These time limits may originate from predictable events like weather cycles or financial deadlines, or they may be arbitrarily established as lifesaving measures in situations involving famine, disease, or military vulnerabilities. Schedule compression occurs when deadlines appropriate for expected conditions are shortened while the program is in progress.


Methods

Fast-tracking involves working simultaneously on activities that would have been performed sequentially under normal circumstances. Project crashing occurs when additional resources are required to meet the established deadline. Project crashing increases the cost of the goal. Crash analysis compares the costs of shortened deadlines.


Examples

*
First transcontinental railroad America's first transcontinental railroad (known originally as the "Pacific Railroad" and later as the "Overland Route (Union Pacific Railroad), Overland Route") was a continuous railroad line built between 1863 and 1869 that connected the exis ...
*
Liberty ship Liberty ships were a ship class, class of cargo ship built in the United States during World War II under the Emergency Shipbuilding Program. Although British in concept, the design was adopted by the United States for its simple, low-cost cons ...
* Operation Bumblebee *
Space Race The Space Race (, ) was a 20th-century competition between the Cold War rivals, the United States and the Soviet Union, to achieve superior spaceflight capability. It had its origins in the ballistic missile-based nuclear arms race between t ...
*
COVID-19 vaccine A COVID19 vaccine is a vaccine intended to provide acquired immunity against severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), the virus that causes coronavirus disease 2019 ( COVID19). Knowledge about the structure and fun ...
*
Manhattan Project The Manhattan Project was a research and development program undertaken during World War II to produce the first nuclear weapons. It was led by the United States in collaboration with the United Kingdom and Canada. From 1942 to 1946, the ...