Crash Program
   HOME

TheInfoList



OR:

A crash program is a plan of action entailing rapid, intensive resource allocation to solve a pressing problem. Rapidity may eliminate investigation and planning essential to efficient use of resources when goals are perceived as more important than those resources.


Deadlines

Time limit A time limit or deadline is a narrow field of time, or a particular point in time, by which an objective or task must be accomplished. Once that time has passed, the item may be considered overdue (e.g., for work projects or school assignments). In ...
s differentiate crash programs from normal procedures. Time reduction often results from unexpected circumstances. These time limits may originate from predictable events like weather cycles or financial deadlines, or they may be arbitrarily established as lifesaving measures in situations involving famine, disease, or military vulnerabilities. Schedule compression occurs when deadlines appropriate for expected conditions are shortened while the program is in progress.


Methods

Fast-tracking involves working simultaneously on activities that would have been performed sequentially under normal circumstances. Project crashing occurs when additional resources are required to meet the established deadline. Project crashing increases the cost of the goal. Crash analysis compares the costs of shortened deadlines.


Examples

*
First transcontinental railroad North America's first transcontinental railroad (known originally as the "Pacific Railroad" and later as the " Overland Route") was a continuous railroad line constructed between 1863 and 1869 that connected the existing eastern U.S. rail netwo ...
*
Liberty ship Liberty ships were a class of cargo ship built in the United States during World War II under the Emergency Shipbuilding Program. Though British in concept, the design was adopted by the United States for its simple, low-cost construction. Mass ...
*
Operation Bumblebee Operation Bumblebee was a US Navy effort to develop surface to air missiles (SAMs) to provide a mid-range layer of anti-aircraft defence, between anti-aircraft guns in the short range and fighter aircraft operating at long range. A major reason f ...
*
Space Race The Space Race was a 20th-century competition between two Cold War rivals, the United States and the Soviet Union, to achieve superior spaceflight capability. It had its origins in the ballistic missile-based nuclear arms race between the tw ...
*
COVID-19 vaccine A COVID19 vaccine is a vaccine intended to provide acquired immunity against severe acute respiratory syndrome coronavirus 2 (SARS‑CoV‑2), the virus that causes coronavirus disease 2019 ( COVID19). Prior to the COVID19 pandemic, an e ...
*
Manhattan Project The Manhattan Project was a research and development undertaking during World War II that produced the first nuclear weapons. It was led by the United States with the support of the United Kingdom and Canada. From 1942 to 1946, the project w ...