Cominco Resources is a private company which is developing the US$2billion Hinda
phosphate In chemistry, a phosphate is an anion, salt, functional group or ester derived from a phosphoric acid. It most commonly means orthophosphate, a derivative of orthophosphoric acid . The phosphate or orthophosphate ion is derived from phospho ...
project located in The
Republic of the Congo The Republic of the Congo (french: République du Congo, ln, Republíki ya Kongó), also known as Congo-Brazzaville, the Congo Republic or simply either Congo or the Congo, is a country located in the western coast of Central Africa to the w ...
. Through its subsidiary it owns 100% of the Hinda Phosphate Project, which comprises the Hinda Permit (granted in December 2009), and the Kolatchikanou Permit (granted in June 2011). The Hinda project is the world's largest undeveloped phosphate deposit with a
JORC There are several classification systems for the economic evaluation of mineral deposits worldwide. The most commonly used schemes base on the International Reporting Template, developed by the CRIRSCO - Committee for Mineral Reserves International ...
Mineral Resource of 678 Mt and a Minable Ore Reserve of 405 Mt, sufficient for over 24 years of production. Cominco Resources was merged with Kropz in December 2018 and listed on the AIM market. Cominco owns 100% of the Hinda and Kolatchikanou phosphate exploration licences covering 1,663 km2 of ROC's coastal basin, upon which Cominco discovered and delineated a large
graben In geology, a graben () is a depressed block of the crust of a planet or moon, bordered by parallel normal faults. Etymology ''Graben'' is a loan word from German, meaning 'ditch' or 'trench'. The word was first used in the geologic contex ...
hosted, marine sedimentary phosphate deposit between 300 m and 800 m wide, running roughly parallel to the Atlantic coast. The deposit is relatively homogeneous and thick and has a very low overburden to Ore ratio (1.5 m3:t). The Orebody is one of few that can be open pit mined, by free digging with no requirement for ripping or blasting. On 7 December 2015, The Ministry of Mines and Geology granted Cominco an Exploitation (Mining) Licence for phosphate covering an area of 263 km2. The company's African operations are located at Rond-Point d'Avoum, Centre-Ville in
Pointe Noire Pointe-Noire (; kg, Njinji, french: Ndjindji with the letter d following French spelling standards) is the second largest city in the Republic of the Congo, following the capital of Brazzaville, and an autonomous department since 2004. Before ...
.


Resource and Geology

The Republic of Congo has considerable resources of sedimentary phosphates (
Apatite Apatite is a group of phosphate minerals, usually hydroxyapatite, fluorapatite and chlorapatite, with high concentrations of OH−, F− and Cl− ions, respectively, in the crystal. The formula of the admixture of the three most common e ...
), dating from the Upper
Cretaceous The Cretaceous ( ) is a geological period that lasted from about 145 to 66 million years ago (Mya). It is the third and final period of the Mesozoic Era, as well as the longest. At around 79 million years, it is the longest geological period of th ...
to Lower
Eocene The Eocene ( ) Epoch is a geological epoch (geology), epoch that lasted from about 56 to 33.9 million years ago (mya). It is the second epoch of the Paleogene Period (geology), Period in the modern Cenozoic Era (geology), Era. The name ''Eocene' ...
periods. The deposits form a string of outcrops that extend over 50 km along the coast inland from Pointe-Noire, and are exposed within a 750 m-wide belt – most of which falls within Cominco's licence areas. The Hinda Phosphate Ore-boby is hosted by Upper Cretaceous (
Maastrichtian The Maastrichtian () is, in the ICS geologic timescale, the latest age (uppermost stage) of the Late Cretaceous Epoch or Upper Cretaceous Series, the Cretaceous Period or System, and of the Mesozoic Era or Erathem. It spanned the interval from ...
) Holle Series and younger sediments situated within Cretaceous to Quaternary terrestrial to marine succession of an intra-continental rift within the Congolese Coastal Basin. Sedimentary phosphates are exposed east and north of Pointe Noire within an approximately 750m wide fault bounded belt which trends north-west and extends into
Angola , national_anthem = " Angola Avante"() , image_map = , map_caption = , capital = Luanda , religion = , religion_year = 2020 , religion_ref = , coordina ...
to the south and
Gabon Gabon (; ; snq, Ngabu), officially the Gabonese Republic (french: République gabonaise), is a country on the west coast of Central Africa. Located on the equator, it is bordered by Equatorial Guinea to the northwest, Cameroon to the north ...
to the north. The belt is considered to have been preserved within a post-
Palaeogene The Paleogene ( ; also spelled Palaeogene or Palæogene; informally Lower Tertiary or Early Tertiary) is a geologic period and system that spans 43 million years from the end of the Cretaceous Period million years ago ( Mya) to the beginning o ...
, pre-
Pliocene The Pliocene ( ; also Pleiocene) is the epoch in the geologic time scale that extends from 5.333 million to 2.58Miocene The Miocene ( ) is the first geological epoch of the Neogene Period and extends from about (Ma). The Miocene was named by Scottish geologist Charles Lyell; the name comes from the Greek words (', "less") and (', "new") and means "less recen ...
)
graben In geology, a graben () is a depressed block of the crust of a planet or moon, bordered by parallel normal faults. Etymology ''Graben'' is a loan word from German, meaning 'ditch' or 'trench'. The word was first used in the geologic contex ...
. On 4 December the company announced a JORC Compliant 531 Mt at 11.1% P0 at a 7% P0 cut-off, of which 89% is in the Measured and Indicated category. The MRE was provided b
CSA Global (UK) Ltd
The latest MRE is based on a 5% P0 Cut-off grade. In April 201
SRK Consulting
released a 2014 JORC Compliant Minable Reserve Statement. A total of 929 diamond and reverse-circulation holes have been drilled by Cominco in the Hinda deposit, for 66,231 m. Phosphate mineralisation is hosted by Upper Cretaceous to Quaternary sediments up to 65 m thick and from surface at the mine start location.


Hinda Project

Cominco's Hinda Project lies 37 km northeast of Pointe-Noire in the
Kouilou Department Kouilou ( kg, Kwilu, Kuilu ) is a department of the Republic of the Congo. Covering the country's coastline, it has an area of 13,650 square kilometres and at the start of 2007 it was home to about 91,955 people. The department borders Niar ...
. Existing road and rail infrastructure connect the project to the major seaport at
Point Noire Pointe-Noire (; kg, Njinji, french: Ndjindji with the letter d following French spelling standards) is the second largest city in the Republic of the Congo, following the capital of Brazzaville, and an autonomous department since 2004. Before ...
. The Project involves the development of an
open cut mine Open-pit mining, also known as open-cast or open-cut mining and in larger contexts mega-mining, is a surface mining technique of extracting rock or minerals from the earth from an open-air pit, sometimes known as a borrow. This form of mining ...
and in-pit crushing of an average 18 Mt/y of Ore, and a beneficiation plant approximately 12 km from the Hinda village, 37 km northeast of Pointe-Noire, a major deep-sea container port and the industrial capital of ROC. The beneficiation plant will treat an average of 7.2 Mt/y of screened Ore grading 21.7% P0 to produce 4.1 Mt/y of Phosrock grading 32% P0. A
slurry pipeline A slurry pipeline is a specially engineered pipeline used to move ores, such as coal or iron, or mining waste, called tailings, over long distances. A mixture of the ore concentrate and water, called slurry, is pumped to its destination and the w ...
will transport the product 42.1 km to the port site (Pointe Indienne) slightly north Pointe-Noire. Product dewatering, drying, storage and shiploading facilities will be built at the port site. Electrical power for the Project is supplied by interconnection to the ROC national grid with a 16 km long 220kV overhead transmission line linking the existing M’Boundi substation with the Hinda beneficiation plant and a 16 km long 30 kV overhead transmission line linking the Mongo Kamba substation to the Pointe Indienne port site. Natural gas is used in the flash dryer to dry the Phosrock product concentrate, at Pointe Indienne. A new 150 mm diameter, 17 km long buried off-take pipeline delivers natural gas from Mengo to the Pointe Indienne port facilities. Prior to being dried in the flash dryer, the phosphate slurry is first dried using a filter press. The dried phosrock concentrate is reclaimed from the covered stockpile by a portal scraper that travels the length of the covered stockpile, onto a reclaim transfer pad fitted with two weightometers, cross belt sampler and moisture analyser. An enclosed product conveyor runs to the vessel loading platform via a causeway and jetty for export in ocean going vessels, ranging from 35,000 dwt Handymax bulk carriers up to 65,000 dwt Ultramax sized vessels, at 4,000 t/h.


Historical Studies


Scoping Study

The company in conjunction with
Jacobs Engineering Jacobs Solutions Inc. is an American international technical professional services firm. The company provides engineering, technical, professional and construction services, as well as scientific and specialty consulting for a broad range of cli ...
completed a scoping study which demonstrated a mine life of over 20 years and operating cost of around $35/tonne of product sold. The company is also looking at the possibility of an 8 million tonne/year operation. The scoping study indicates capital costs of US$616 million for the first stage.


Pre-Feasibility Study


Definitive Feasibility Study

In May 2015 Cominco Resources in-conjunction with their lead engineer Ausenco completed the Definitive Feasibility Study for the Hinda Phosphate mine site, beneficiation plant and port. The DFS estimates the Net Present Value of the project at $1.87Billion with a IRR of 38% based on mine schedule delivering 4.1 mt/pa of phosphate rock concentrate. 2014, Cominco awarded a contract to Ausenco Engineering Canada Inc. (
Ausenco Ausenco Limited is a multinational engineering, procurement, construction management, and operations service provider to the energy and resources sectors. Its head office is in Brisbane, Australia. The company name is an amalgamation of "Austra ...
) for the provision of services relating to specification and supervision of metallurgical testwork and the preparation of a DFS for the Project. SRK Consulting (UK) Ltd (SRK) was engaged by Cominco to complete the mining components of the DFS. The DFS was managed by Ausenco, including liaison with and compilation of work completed by SRK, other consultants and Cominco's technical team. Extensive geotechnical campaigns were conducted across the Orebody, beneficiation plant site, slurry pipeline and the port site at Pointe Indienne. WSP (Formally Genivar) managed the environmental baseline studies and the development of an independent ESIA for the exploitation phase of the Project.


Pilot Program

Extensive metallurgical testwork and piloting has been performed as part of the DFS. The majority of the DFS test program was undertaken by Mintek at their facilities in Johannesburg, South Africa. Additional tests have been conducted by vendors and subcontractors. A representative Ore bulk sample of approximately 65 t was recovered by large diameter (200 mm) diamond core drilling and shipped to Mintek in Johannesburg for metallurgical testwork. Large diameter core was used to ensure that large unbroken pieces were available for crushing testwork. The core has been taken from the full thickness of the Ore zone, at seven locations to ensure full representation. Over 300 bench-scale flotation tests have been undertaken at Mintek. Bench tests were also performed by China Bluestar Lehigh Engineering (Bluestar), Clariant Custom Chemicals (Germany), and ArrMaz (USA).


Acidulation Work

Acidulation pilot work at Prayon Technologies SA Belgium (Prayon) as part of the DFS demonstrated the ability to make good quality acid with 97% P2O5 recovery from Hinda Phosrock, with average filtration rates. Commercial grade
DAP DAP or Dap may refer to: Science * DAP (gene), human gene that encodes death-associated proteins, which mediate programmed cell death * Diamidophosphate, phosphorylating compound * Diaminopimelic acid, amino acid derivative of lysine * Diamin ...
and MAP fertiliser were also being produced. High quality phosrock of 32% P0 will be produced by the Project, confirmed by the concentrate produced from Hinda Ore during testwork at Mintek in South Africa and Bluestar in China. The grade achieved for Hinda phosrock is saleable to fertiliser producers. The Minor Element Ratio (MER = %Fe2O3 + %Al2O3 + %MgO) / %P0) is within the limits that make Hinda phosrock ideally suited to acid production and the CaO / P0 ratio is well within industry limits. All other potentially deleterious elements such as, Hg, Cd, Cl and Pb are very low. In addition, acidulation testwork undertaken by Prayon in Belgium confirm the suitability of Hinda concentrate for phosphoric acid production.


Mine Design

The mining operation is a conventional
open-pit Open-pit mining, also known as open-cast or open-cut mining and in larger contexts mega-mining, is a surface mining technique of extracting rock (geology), rock or minerals from the earth from an open-air pit, sometimes known as a Borrow pit, b ...
truck and shovel, with in-pit crushing and conveying (IPCC) for both free dig Ore and after 5 years, overburden. The pit will be mined to full depth of economic mineralisation and then advanced northwest along strike, allowing for continual backfill. The truck and shovel operation will consist of: *Initially two 550 t CAT6050BH
backhoes A backhoe—also called rear actor or back actor—is a type of excavating equipment, or digger, consisting of a digging bucket on the end of a two-part articulated arm. It is typically mounted on the back of a tractor or front loader, the latt ...
operating in Ore and overburden with custom buckets, followed by the addition of two CAT6060FS AC electric face shovels operating in overburden commencing in Year 5 and 7 when the third and fourth shovels are required to meet production * CAT789D 193 t payload haul trucks, with a peak of 32 haul trucks over the life of mine (LOM) *Customised 31 m3 shovel buckets and light weight truck trays specific to the site material characteristics, (principally low abrasivity) * A development fleet (of up to ten, 40 t articulated trucks) will be used for construction works required to support the mine operations. These activities include, tailings dam construction; surface water diversion, building of the access corridor; site works to support the IPCC, road construction and maintenance and topsoil stripping and stockpiling and subsequent placement for rehabilitation.


Beneficiation Plant

The beneficiation plant and mine are accessed by an existing 14.6 km public road between the paved N1 Highway at Hinda and the beneficiation plant. It will be upgraded at the start of construction and will continue to be shared as an unlit public road. Electrical power for the beneficiation is supplied by interconnection to the ROC national grid with a 16 km long 220 kV overhead
transmission line In electrical engineering, a transmission line is a specialized cable or other structure designed to conduct electromagnetic waves in a contained manner. The term applies when the conductors are long enough that the wave nature of the transmis ...
linking with the existing M’Boundi substation.


Flow Sheet

* Crushing The incoming ore from the mine site is first secondary crushed using a mineral rolls sizer designed b
MMD
* Pre-Screening: used to cost effectively remove gangue mineral species, whilst upgrading the phosphate content, and evening out mill feed grade. Two double deck screens remove oversized material that is then attrition scrubbed. The attritioned material is screened again to remove the oversizes (coarse rejects) with the undersized material returned to the plant. Hydrocyclones reject the "fines" fraction from the resulting product. A high proportion of magnesia (>70%) reports to these coarse and fines rejects, together with some silica and most of the iron. The phosphate grade of the resulting mid-fraction is upgraded from a LOM average of 11.0% mined to a mill feed averaging 21.7% P0. Importantly also, this mid fraction is less variable with respect to grade than that of the run-of mine material, which assists control of the downstream flotation process. * Ball Milling: A single 7.5 MW
ball mill A ball mill is a type of grinder used to grind or blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering. It works on the principle of impact and attrition: size reduction is done ...
grinds the pre-screened Ore mid-fraction liberating the minerals whilst maintaining the particle size required for efficient float concentration. * Desliming
Hydrocyclone Hydrocyclones are a type of cyclonic separators that separate product phases mainly on basis of differences in gravity with aqueous solutions as the primary feed fluid. As opposed to dry or dust cyclones, which separate solids from gasses, hydrocy ...
s: The milled Ore is deslimed before the flotation circuit. * Reverse Rougher Flotation: Three stages of conditioning with a phosphate depressant and carbonate and silica collectors is followed by a Reverse Rougher float to reject the gangue minerals. The roughers produce a sink product of approximately 30% P0. * Reverse Cleaner Flotation: The reverse rougher sink product is processed in a reverse cleaner float stage to achieve a grade of 32% P0 and 0.7% MgO. * Tailings Thickener: dewaters the tailings, recovering the water for re-use in the process. The underflow is pumped to the tailings storage facility. * Concentrate Thickener: densifies the concentrate to 65% w/w solids for storage in the header tanks, prior to pumping the slurry by pipeline 42.1 km to Pointe Indienne. * Pressure filtration: dewaters the 60% solids slurry to 10% moisture. * Concentrate Dryer: A gas-fired flash dryer reduces the moisture to a target level of 3-7% moisture. * Concentrate Storage: A covered stockpile with stacker and reclaimer provides approximately 200kt storage of dried concentrate prior to ship loading. * Jetty and Shiploader: A
trestle ATLAS-I (Air Force Weapons Lab Transmission-Line Aircraft Simulator), better known as Trestle, was a unique electromagnetic pulse (EMP) generation and testing apparatus built between 1972 and 1980 during the Cold War at Sandia National Laborato ...
jetty A jetty is a structure that projects from land out into water. A jetty may serve as a breakwater, as a walkway, or both; or, in pairs, as a means of constricting a channel. The term derives from the French word ', "thrown", signifying somet ...
and shiploader is used to load ships up to 65,000 t Ultramax size at a rate of 4,000 t/h.


Concentrate Slurry Pipeline

Thickened phosphate concentrate slurry is stored in two agitated head tanks, which provide surge capacity of 18 hours at each end of the system. The concentrate thickener provides four hours of additional storage. Slurry is pumped from the head tanks at 60% solids w/w to the mainline slurry pumps, by centrifugal charge pumps. The 42.1 km long, 300 mm outside diameter carbon steel slurry pipeline is buried to a depth of 1 m for protection, to remove any conflict of land use and so as not to present a barrier to people and fauna en route. The system includes leak detection, pressure monitoring and cathodic corrosion protection, fibre-optic telecommunications linking the mine site to Pointe Indienne, discharge end line choking and mass balance measurement. A single mainline pump station is located at the beneficiation plant. Two single stage, 1.5 MW positive displacement piston pumps, with variable speed drives, pressure pulsation dampeners and pressure relief devices are provided with one pump in operation and one standby. The system is designed to operate continuously for the life of the Project with a maximum operating pressure of 87 bar. The system is well within the envelope of proven technology and is comparable to other phosphate pipeline currently in commercial operation. Ausenco PSI based in Concord California undertook the design and cost estimation of the concentrate
slurry pipeline A slurry pipeline is a specially engineered pipeline used to move ores, such as coal or iron, or mining waste, called tailings, over long distances. A mixture of the ore concentrate and water, called slurry, is pumped to its destination and the w ...
. PSI has a long history in slurry pipeline design that extends over 33 years, and was selected by Groupe Cherifien des Phosphates (OCP) to complete the basic design of the OCP phosphate pipeline project in Morocco.


See also

*
Republic of Congo The Republic of the Congo (french: République du Congo, ln, Republíki ya Kongó), also known as Congo-Brazzaville, the Congo Republic or simply either Congo or the Congo, is a country located in the western coast of Central Africa to the w ...
* Mining in the Republic of Congo


References


External links


Cominco Resource Portail National Du Congo Metampere Limited WebsiteCominco YouTube channel
{{Phosphate minerals Mining in Africa Phosphate mining Natural resources in Africa Mining companies of the Republic of the Congo Phosphate mines in the Republic of the Congo