The Circular or Yellow line (code Y) () is a metro line in
New Taipei City New Taipei City is a special municipality located in northern Taiwan. The city is home to an estimated population of 3,974,683 as of 2022, making it the most populous city of Taiwan, and also the second largest special municipality by area, be ...
. The first phase of the project consists of the section from to and is approximately long with 14 stations. This initial section was opened on 31 January 2020.
Hitachi Rail Italy Hitachi Rail Italy S.p.A. is a multinational rolling stock manufacturer company based in Pistoia, Italy. Formerly AnsaldoBreda S.p.A., a subsidiary of state-owned Finmeccanica, the company was sold in 2015 to Hitachi#Hitachi Rail, Hitachi Rail o ...
supplied 17 sets of 4-car driverless medium-capacity trains for the line.


Construction

Hitachi Rail STS supplied electromechanical equipment for the line, including driverless technology and
CBTC Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accurat ...
signaling. , currently the only underground station on the line, was constructed by RSEA Engineering Corporation and employed the cut-and-cover method. Construction for the first phase officially broke ground on 11 July 2011 on a elevated section between Zhonghe and
Banqiao Banqiao () may refer to: Taiwan *Banqiao District, seat of New Taipei Mainland China *Banqiao Dam (), dam on the Ru River near Zhumadian, Henan that suffered an infamous failure in 1975 *Banqiao Town (disambiguation) *Banqiao Township (disambigua ...
. The section is estimated to cost
NT$ The New Taiwan dollar (code: TWD; symbol: NT$, also abbreviated as NT) is the official currency of Taiwan. The New Taiwan dollar has been the currency of Taiwan since 1949, when it replaced the Old Taiwan dollar, at a rate of 40,000 old dollars ...
13.7 billion, with the entire first-stage route estimated to cost NT$54.7 billion to construct. The line includes the first elevated split platforms in the system at , , and due to the narrowness of the available station area.


Stations in operation

The western section of the line officially opened on 31 January 2020.


Stations under construction

The north and south sections are approved for construction. Currently under construction, with estimated completion in 2029.


South section

Stations Y01–06 are approved for construction. (Unopened stations' names are to be confirmed)


North section

Stations Y21–32 are approved for construction. (Unopened stations' names are to be confirmed)


Planned stations

The east section is still under planning and subject to change. After this section is complete, the Circular line will go in a circle.


East section

(Unopened stations' names are to be confirmed)