The Jabodebek LRT Cibubur Line ( id, LRT Jabodebek Lin Cibubur) is one of the two light rail line of the
Greater Jakarta LRT
The Greater Jakarta LRT or Jabodebek LRT is a light rail system currently under construction in Jakarta, the capital city of Indonesia, as well as the adjacent areas of West Java and Banten, both within the Jakarta Metropolitan area. It is be ...
which will connect to station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations.
Its Pancoran–Harjamukti section runs along the
Jakarta Inner Ring Road and
Jagorawi Toll Road
The Jakarta–Bogor–Ciawi Toll Road (shortened to Jagorawi Toll Road) is the first toll road in Indonesia. Construction of the highway began in 1973, and it was officially opened on 9 March 1978.
The Jagorawi Toll Road links the capital city ...
. The planned next phase would extend the line to Bogor.
History
Just like other public transportation systems in
Jabodetabek
The Jakarta metropolitan area or Greater Jakarta, known locally as Jabodetabek (an acronym of Jakarta–Bogor–Depok–Tangerang–Bekasi), and sometimes extended to Jabodetabekjur (with the acronym extended to include part of Cianjur Regency) ...
, the Greater Jakarta LRT system was built to break down congestion. The construction of the Cawang-Cibubur LRT Line and other lines in the first phase of the Greater Jakarta LRT construction began with the groundbreaking on 9 September 2015 by President
Joko Widodo. The groundbreaking ceremony was carried out near the planned TMII Station which is included in this LRT route.
Initially, the construction of phase 1 was targeted to be completed before the
2018 Asian Games. However, until the Asian Games were held, the overall development for phase 1 itself was still 45%. Even so, at that time several lines in the Cawang–Cibubur service route had already begun to be fitted with rails.
In March 2019, the entire track line has been connected. All elevated construction work has been completed and continued with signaling work and station construction. Therefore, this line is estimated to be ready for the trial run of the LRT series considering that the other lines have not yet completed their track construction.
On October 11 2019, the first series of Jabodebek LRT arrived in Jakarta. The shipment was carried out by land directly from the
PT INKA
PT Industri Kereta Api (Persero), abbreviated as INKA, is a state owned rolling stock manufacturer.
Profile
INKA Ltd was established in 1981 to serve as the national rail locomotive and rolling stock manufacturer for the Indonesian Railway ...
Madiun Factory. For the time being, the LRT series has been parked near Harjamukti Station. This wad done considering that the construction of the LRT depot in Jatimulya has not yet been completed.
In October 2020, the Greater Jakarta LRT fleet began trials. This trial was carried out on the Cawang–Cibubur service route with the TMII Station–Harjamukti Station route. This trial was conducted to check signaling readiness and the path to be traversed.
Network
Route
The Cibubur Line has a track length of 25.94 kilometers. Most of the trajectory of this route is using an elevated structure. From Dukuh Atas station to Cawang station, this line shares the route with Lin Bekasi, goes along Jalan Rasuna Said then turns to cross to the south side of the
Cawang-Pluit Toll Road. After Cawang station, the two lines split and this line follows the Jagorawi Toll Road alignment. From Cawang Station to TMII Station, the route changes from the west side to the east side of the toll road. Between the Cawang – TMII plots, there is a path made above ground level because it is close to the approach zone of Halim Perdanakusuma Airport. After TMII Station, the route moves back to the west side of the toll road to Harjamukti Station.
List of stations
Future development
In the phase 2 construction plan, the LRT line is planned to be extended to Bogor along with the Dukuh Atas-Senayan service line. The Cibubur-Bogor route is planned to be built on the ground, not elevated like the Cawang-Cibubur route. This above-ground building model is considered to save construction costs by up to 50%. Until now, the Cibubur-Bogor route is still in the design planning process.
Incidents
On October 25, 2021, 2 LRT train series had an accident while undergoing trials on this line, parallel to the
Jakarta-Bogor-Ciawi Toll Road.