Chicago Deep Tunnel
   HOME

TheInfoList



OR:

The Tunnel and Reservoir Plan (abbreviated TARP and more commonly known as the Deep Tunnel Project or the Chicago Deep Tunnel) is a large civil engineering project that aims to reduce flooding in the metropolitan Chicago area, and to reduce the harmful effects of flushing raw
sewage Sewage (or domestic sewage, domestic wastewater, municipal wastewater) is a type of wastewater that is produced by a community of people. It is typically transported through a sewer system. Sewage consists of wastewater discharged from residenc ...
into
Lake Michigan Lake Michigan is one of the five Great Lakes of North America. It is the second-largest of the Great Lakes by volume () and the third-largest by surface area (), after Lake Superior and Lake Huron. To the east, its basin is conjoined with that o ...
by diverting storm water and sewage into temporary holding reservoirs. The megaproject is one of the largest civil engineering projects ever undertaken in terms of
scope Scope or scopes may refer to: People with the surname * Jamie Scope (born 1986), English footballer * John T. Scopes (1900–1970), central figure in the Scopes Trial regarding the teaching of evolution Arts, media, and entertainment * Cinem ...
, cost and timeframe. Commissioned in the mid-1970s, the project is managed by the Metropolitan Water Reclamation District of Greater Chicago. Completion of the system is not anticipated until 2029, but substantial portions of the system have already opened and are currently operational. Across 30 years of construction, over $3 billion has been spent on the project.


History


19th century

The Deep Tunnel Project is the latest in a series of civil engineering projects dating back to 1834. Many of the problems experienced by the city of Chicago are directly related to its low level topography and the fact that the city is largely built upon marsh or wet prairie. This combined with a temperate wet climate and the human development of open land, leads to substantial water runoff.
Lake Michigan Lake Michigan is one of the five Great Lakes of North America. It is the second-largest of the Great Lakes by volume () and the third-largest by surface area (), after Lake Superior and Lake Huron. To the east, its basin is conjoined with that o ...
was ineffective in carrying sewage away from the city, and in the event of a rainstorm, the water pumps that provided drinking water to Chicagoans became contaminated with sewage. Though no epidemics were caused by this system (see
Chicago 1885 cholera epidemic myth __NOTOC__ The Chicago 1885 cholera epidemic myth is a persistent urban legend, stating that 90,000 people in Chicago died of typhoid fever and cholera in 1885. Although the story is widely reported, these deaths did not occur. Lake Michigan was ...
), it soon became clear that the sewage system needed to be diverted to flow away from Lake Michigan in order to handle an increasing population's sanitation needs. The Illinois and Michigan Canal was built from 1836 to 1848 to divert some sewage water from the Chicago River. In 1900, to improve general health standards, the flow of the main branch of the Chicago River was reversed to drain water from
Lake Michigan Lake Michigan is one of the five Great Lakes of North America. It is the second-largest of the Great Lakes by volume () and the third-largest by surface area (), after Lake Superior and Lake Huron. To the east, its basin is conjoined with that o ...
, as opposed to having the river flow into Lake Michigan. This further improved the sanitation of Lake Michigan, and helped to prevent further waterborne epidemic scares. Between 1864 and 1867, under the leadership of
Ellis S. Chesbrough Ellis Sylvester Chesbrough (1813–1886) was an engineer credited with the design of the Chicago sewer system, which are sometimes known as the 'Chesbrough sewers'. This was the first comprehensive sewer system in the United States. He is responsi ...
, the city built the two-mile
Chicago lake tunnel The Chicago Lake Tunnel was the first of several tunnels built from the city of Chicago's shore on Lake Michigan two miles out into the lake to access unpolluted fresh water far from the city's sewage. Waterborne disease in early Chicago In the ear ...
to a new water intake location farther from the shore. Crews began from the intake location and the shore, tunneling in two shifts a day. Clay and earth were drawn away by mule-drawn railcars. Masons lined the five-foot-diameter tunnel with two layers of brick. The lake and shore crews met in November 1866, less than seven inches out of alignment. A second tunnel was added in 1874.


20th century

The construction of the
Sanitary and Ship Canal The Chicago Sanitary and Ship Canal, historically known as the Chicago Drainage Canal, is a canal system that connects the Chicago River to the Des Plaines River. It reverses the direction of the Main Stem and the South Branch of the Chicago R ...
(1892–1900), enlargements to the North Shore Channel (1907–1910), the construction of the Cal-Sag Channel (1911–1922), and the construction of locks at the mouth of the Chicago River (1933–1938) brought further improvements to the sanitary issues of the time. These projects blocked further amounts of sewage from draining into Lake Michigan. The projects also brought fresh lake water to inland waterways to further dilute sewage that was already in the waterways. Surrounding farmland also engaged in flood control projects. The Illinois Farm Drainage Act of 1879 established
drainage district Drainage districts occur in England and Wales, varying in size from a few hundred acres to over , all in low-lying areas of the country where flood risk management and land drainage are sensitive issues. Most drainage districts are administered by ...
s. These districts were generally named for the basin they drained—for example, the Fox River Drainage District. After World War II, suburban communities began to realize the benefits of separating
stormwater Stormwater, also spelled storm water, is water that originates from precipitation (storm), including heavy rain and meltwater from hail and snow. Stormwater can soak into the soil ( infiltrate) and become groundwater, be stored on depressed la ...
from sewage water and began to construct separate sewer and storm drainage lines. The primary benefit of wastestream separation is that storm water requires less treatment than sewage before being returned to the environment. Flood damage grew markedly after 1938, when surrounding natural drainage areas were lost to development and human activity. Serious flooding has occurred in the Chicago metropolitan area in 1849, 1855, 1885, 1938, 1952, 1954, 1957, 1961, 1973, 1979, 1986, 1987, 1996, 2007, and 2008—but most record-setting
crest Crest or CREST may refer to: Buildings *The Crest (Huntington, New York), a historic house in Suffolk County, New York *"The Crest", an alternate name for 63 Wall Street, in Manhattan, New York *Crest Castle (Château Du Crest), Jussy, Switzerla ...
s occurred after 1948. In the 1960s, the concept of Deep Tunnel was studied and recommended as a solution to continuing flooding issues.


Status

Phase 1, the creation of of
drainage tunnel A drainage tunnel, called an emissary in ancient contexts, is a tunnel or channel created to drain water, often from a stagnant or variable-depth body of water. It typically leads to a lower stream or river, or to a location where a pumping statio ...
s ranging from in diameter, up to underground, was adopted in 1972, commenced in 1975, and completed and operational by 2006. Phase 2, creation of reservoirs primarily intended for flood control, remains underway with an expected completion date of 2029. Currently, up to of sewage can be stored and held in the tunnels themselves while awaiting processing at sewage treatment plants, which release treated water into the
Calumet Calumet may refer to: Places United States *Calumet Region, in northern Illinois and Indiana **Calumet River **Calumet Trail, Indiana ** Calumet (East Chicago) * Calumet, Colorado *Calumet, Iowa * Calumet, Michigan *Calumet, Minnesota * Calumet ...
and Des Plaines rivers. Additional sewage is stored at the Thornton Composite Reservoir, and the Gloria Alitto Majewski Reservoir near
O'Hare International Airport Chicago O'Hare International Airport , sometimes referred to as, Chicago O'Hare, or simply O'Hare, is the main international airport serving Chicago, Illinois, located on the city's Northwest Side, approximately northwest of the Chicago Loop, ...
. The McCook Reservoir was completed in 2017 and will be expanded to by 2029. Because the reservoirs are decommissioned quarries, construction has been delayed by decreased demand for the quarried gravel. Upon completion, the TARP system will have a storage capacity of .


Reservoirs


Effects

Severe weather events have forced water management agencies to pump excess wastewater into the lake and river in order to prevent flooding. These incidents have decreased in frequency as more of the Deep Tunnel system has become operational. Long considered an open sewer, the Chicago River now hosts more than 50 species of fish and increased wildlife along its shores. Substantial development is occurring along many portions of the riverfront. Canoeing is once again allowed on the waterway, but swimming is still prohibited due to high pollution levels. On October 3, 1986, a heavy thunderstorm drenched the southern portion of the Deep Tunnel area with several inches of rain in a short period of time. While the Deep Tunnel system performed satisfactorily by absorbing excess water, water within the system itself rushed past the north side of Chicago and near the Bahá'í Temple in Wilmette.
Geyser A geyser (, ) is a spring characterized by an intermittent discharge of water ejected turbulently and accompanied by steam. As a fairly rare phenomenon, the formation of geysers is due to particular hydrogeological conditions that exist only in ...
s of over were reported in both locations for up to an hour as the water was redistributed more evenly through the system. A geyser erupted downtown at the corner of Jefferson and Monroe, trapping a woman inside her car as it filled with water. A system of watertight bulkheads has since been installed to prevent the event from occurring again. During the Chicago Flood of 1992, the water from the Chicago River that leaked into the long-disused underground freight tunnel system was eventually drained into the Deep Tunnel network, which itself was still under construction.


Sources

* * * * * *


References


External links


Set of photos of the Morrison Knudsen segment of the tunnel

Metropolitan Water Reclamation District of Greater Chicago

Video of TARP on YouTube

Video of TARP on YouTube


{{DEFAULTSORT:Tunnel And Reservoir Plan Government of Chicago Buildings and structures in Chicago Flood control projects Flood control in the United States Waste processing sites Planned developments Engineering projects Proposed infrastructure in the United States Tunnels in Illinois Proposed tunnels in the United States