Cengkareng–Batu Ceper–Kunciran Toll Road
   HOME

TheInfoList



OR:

Cengkang-Batu Ceper-Kunciran Toll Road is a toll road, which runs from Cengkareng to Kunciran in
Greater Jakarta The Jakarta metropolitan area or Greater Jakarta, known locally as Jabodetabek (an acronym of Jakarta–Bogor–Depok–Tangerang–Bekasi), and sometimes extended to Jabodetabekjur (with the acronym extended to include part of Cianjur Regency) ...
,
Indonesia Indonesia, officially the Republic of Indonesia, is a country in Southeast Asia and Oceania between the Indian and Pacific oceans. It consists of over 17,000 islands, including Sumatra, Java, Sulawesi, and parts of Borneo and New Guine ...
. This toll road is part of the
Jakarta Outer Ring Road 2 Jakarta Outer Ringroad 2 (Indonesian: Jalan Tol Lingkar Luar Jakarta 2) or JORR 2 is an under-construction toll road circling the Greater Jakarta area, running roughly parallel with the Jakarta Outer Ring Road (JORR 1) in Indonesia. This toll roa ...
network that will connect Soekarno-Hatta International Airport to
Cilincing Cilincing is a historic neighborhood of the coast of Jakarta, Indonesia. It is sandwiched between the Port of Tanjung Priok to the west and River Titram to the east. Cilincing has been for some decades one of the districts of North Jakarta which i ...
. The toll road will be connected to the Jakarta-Tangerang Toll Road, Kunciran-Serpong Toll Road, as well as
Prof. Dr. Ir. Soedijatmo Toll Road The Prof. Dr. Ir. Soedijatmo Toll Road, also commonly spelled as Prof. Dr. Ir. Sedyatmo Toll Road, is a toll road in North Jakarta, Northern Jakarta that connects the Soekarno–Hatta International Airport with the city of Jakarta in Indonesia. C ...
.


History

Cengkareng-Batu Ceper-Kunciran is 14.19 kilometers long, consisting of 4 work sections. The four sections are, section 1 Kunciran – IC of Sultan Ageng Tirtayasa for 2.04 km, section 2 IC of Sultan Ageng Tirtayasa – on / off ramp of Benteng Betawi along 3.50 km. Then section 3 is the on / off ramp of Benteng Betawi – IC Husein Sastranegara along 6.50 km, and section 4 IC Husein Sastranegara – Benda Junction along 2.15 km. The toll road was expected to be operational by 2019. The toll road was inaugurated in 1 April 2019 along with the first section of Serpong–Cinere Toll Road.


Toll gates


See also

* Trans-Java toll road


References

{{DEFAULTSORT:Cengkareng-Batu Ceper-Kunciran Toll Road Buildings and structures in Jakarta Toll roads in Indonesia Transport in Jakarta Transport in Banten